• Title/Summary/Keyword: Project plan

Search Result 2,083, Processing Time 0.031 seconds

An Evaluation Study on the School Library Revitalization Project (학교도서관 활성화 사업의 추진 현황 분석 및 평가연구)

  • Noh, Young-Hee;Hong, Kang-Pyo
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.41 no.1
    • /
    • pp.243-271
    • /
    • 2007
  • This study aims to identify challenges faced by the schools participating in the 2006 School Library Revitalization Project so as to incorporate them in the next Year's plan, which is the last rear of the Phase one of the project, as well as in designing the phase two. By doing so, it seeks to contribute to enhancing effectiveness of the School Library Revitalization Project conducted by the Ministry of Education and Human Resources Development(MOEHRD), the Republic of Korea.

Incorporating Social & Economic Factors for the Pasture Project in Kum River (금강 참게목장화 사업의 사회-경제 통합모델링)

  • Jeon, Dae-Uk
    • Korean System Dynamics Review
    • /
    • v.12 no.1
    • /
    • pp.59-74
    • /
    • 2011
  • This article deals with an economic evalutation of the 'Pasture Project of Kum River', which is the farming plan of mitten crabs in a stream of it. An augmented model of social capital is based on the past ecological-economic system dynamics model and elaborated further with suggestions of social capital literature. During the modeling process a chain diagram of causal relations and its relevant mathematical equations are presented for simulating the project performance, and the simulation results are provided to contrast the dynamic behaviors of the former ecological-economic model with ones of the new model incorporating social capital. The results indicate that an increase in the economic benefit of the project could happen in case of considering the process of social capital accumulation around the case area, which can be regarded as a remarkable trial to approve the common confidence in the role of social capital to enhance an economic achievement.

  • PDF

An Analysis of 'Family Constitution' and the Development Plan for the 'Making Family Constitution' Project in Healthy Family Support Centers : With a Focus on Healthy Family Support Centers in Seoul (건강가정지원센터 '가정헌법 만들기' 사업의 '가정헌법' 분석과 발전방안 : 서울 지역 건강가정지원센터를 중심으로)

  • Lee, Eun-Joo;Jun, Mi-Kyung
    • Journal of Families and Better Life
    • /
    • v.31 no.2
    • /
    • pp.93-108
    • /
    • 2013
  • This study aimed to analyze the functionality and healthiness of family rules through a relational analysis of the relationship between the rule frequency by sub-family system and the content properties shown in the 'family constitution', It also aimed to examine the relationship between the perception degree of healthy family elements and the family subsystem rules and prepare the project development plans. As a result, it was a found that there were many dysfunctional rules, and healthiness was not satisfied. Project development plans include specific project plans, delivery systems, an orientation for practitioners, the necessity of evaluation and feedback, family health diagnosis, association with other project areas, and small scale operations.

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

The Status and Plan of Galileo Project (GALILEO PROJECT 추진현황 및 대응방안 연구(2))

  • Kong, Hyun-Dong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.368-371
    • /
    • 2009
  • The GALILEO Project is to be the one and only European Global Navigation Satellite System(GNSS). The GIVE-B satellite, a second experimental GALILEO satellite was launched and started the transmission of ranging signals. GIOVE-B satellite is intended as a trueprototype of future GALILEO satellite. So I introduce the standard deviation of code multi path, signal power, antennas performance and L1-E5 group delay etc. Therefore I comprehend the current progress and tend of GALILEO Project and try to propose the national countremeasures.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF