• Title/Summary/Keyword: Project for Urban Regeneration

Search Result 197, Processing Time 0.027 seconds

Analysis of Conflict Cases in Urban Regeneration Project (도시재생사업에서의 갈등에 관한 판례 분석: 조합 - 조합 간의 판례를 중심으로)

  • An, Hyo-Kyung;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.201-203
    • /
    • 2011
  • Because of a wide range of performance and diversity of project and uncertainty caused by complexity and a number of stakeholder, conflict occur necessarily in Urban generation including large-scale and many project which do the same time, for long time. So active conflict management which recognized risk before the fact and deal with conflict is necessarily needed. This paper based on the conflict cases related an urban regeneration. In those cases, we proposed the reason of the conflicts by analysis the most frequent combination of the conflicts and a case of conflict between each group.

  • PDF

Characteristics of Local-based Community Business in the Early Stages of Urban Regeneration Policy (도시재생정책 초기의 지역밀착형 커뮤니티 비즈니스 특성에 관한 연구)

  • Han, Seoung-Uk
    • Journal of the Korean Regional Science Association
    • /
    • v.37 no.3
    • /
    • pp.47-58
    • /
    • 2021
  • In 2010, Busan Metropolitan City established an organization dedicated to urban regeneration. The Sanbok Road Renaissance Project and Hope Village Project are representative urban regeneration projects. Busan Metropolitan City is a leading local government that has expanded community business through urban policies. This study analyzed the operational status and characteristics of community-based community businesses based in Busan Metropolitan City in the early stages of urban regeneration policy. As a result, the direction of community-based community business is 'community empowerment'. However, the project effects such as 'expansion of opportunities for local residents to help each other' and 'residents' understanding of the local community' were low. In order to operate a community business, it is important to secure sufficient business capital and secure necessary human resources. In order to revitalize community-based community businesses through urban regeneration policies, it is necessary to convert support into functional organizations of urban regeneration projects rather than expanding subsidies and expand opportunities for business participation.

Revitalization of Urban Regeneration through the Happiness Housing Project as Public Housing Policy

  • Kim, Ok-Yeon;Lee, Jae-Pyeong
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.151-167
    • /
    • 2014
  • Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.

A Study on Urban Regeneration Business Model Utilizing Idle Facilities in Old Town - Focusing on the City Center Revitalization Projects Using Empty Houses and Empty Stores in Japan - (원도심 내 유휴시설을 활용한 도시재생사업 모델에 관한 연구 - 일본의 빈집과 빈 점포를 활용한 중심시가지활성화 사업을 중심으로 -)

  • Song, Ki-Baek
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.6
    • /
    • pp.127-134
    • /
    • 2018
  • The purpose of this study is to derive a model of urban regeneration business using idle facilities in the old city center. The scope of the study was set as empty houses and empty stores owned by private companies, and analyzed the 50 central city revitalization projects using idle facilities in 14 local cities in Japan. The results of this study are follows; First, as an urban regeneration strategy using idle facilities in the old town, it was a combination of other functions centering on commercial functions or introducing new functions required in the city center. Second, various financial supports have been provided to induce the utilization of idle facilities by the private sector, and different strategies have been implemented for businesses that need maintenance first. Third, based on the analysis results, it was possible to derive urban regeneration business model. Fourth, in order to operate smooth business, it is a need for an organization that is in charge of reviewing the consistency of upper-level planning and urban guiding functions such as urban revitalization plan, balance review of expenditure and revenues by cost subsidy and loan repayment, consultation among the business partners.

Path-Analysis for Minimize a Conflict on Urban Regeneration Project (도시재생사업의 갈등 최소화를 위한 경로분석)

  • Kim, Ka-Ram;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.181-184
    • /
    • 2011
  • The earlier studies which are related to conflict management for urban regeneration project were based on limited case-studies on a specific phase. In addition, those studies did not considered a multidisciplinary approach for critical factor of conflict occurrence. In this reason, to establish a practical management or a policy is limited. In this paper, 'Good communication and information sharing' and 'Cooperativeness of stakeholders on project' are defined by critical factors for minimization of conflict between stakeholders. Furthermore we analysis the influence of those factors to minimization of conflict using path-analysis. This paper contributes to increase the efficiency of conflict management through understanding influence of each factors.

  • PDF

Characteristics of SocioExperimental Container Architecture for the Sustainable Urban Regeneration Focusing on WaiWai Container Project in Saga Prefecture, Japan - (지속가능한 도시재생을 위한 사회-실험적 컨테이너 활용특성 연구 -일본 사가현 와이와이 컨테이너 프로젝트를 중심으로-)

  • Choi, Soon-Sub;Oh, Joon-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.176-187
    • /
    • 2018
  • The Korean government has been encouraging 'continuous' post-pump priming project management through relevant local personnel planning, action, and management, upon the selection of 68 sites for urban regeneration as part of the New Deal Project. This study assessed the utilization characteristics of containers, the socio-experimental temporary occupation facilities, as a tool for 'sustainable' urban regeneration. This is to identify the potential limitations of urban regeneration by the utilization of containers as public sector temporary occupation facilities and to provide adequate directions based on its efficacy. By comparing three Korean cases with the Japanese WaiWai project, in terms of 10 elements, the preoccupations with the social trend and scenery, and undifferentiated functions of the facilities focusing on the commercial or working aspects have been identified as limitations of Korean cases. Based on the analyses, the following are suggested as plausible approaches to utilize socio-experimental containers for sustainable urban regeneration: 1. Planning and management should be done by the same organization because the absence of the planning party's participation in the management likely leads to the pursuit of only profits. 2. Diversification and combinations of different utilization purposes of a single site and numerous planning of experimental container uses are in need. 3. Accommodations of heavy commercial uses lead to a decline in the continuity of follow-up projects and a change in the urban regeneration directions. Therefore, it is important to include a public socio-experimental program rather than a simple commercial or promotion program for the following urban renewal project.

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Study on the Berlin Waterfront Development for Urban Regeneration -Focused on the case of Wasserstadt Berlin-Oberhavel, Berlin, Germany-

  • Park, Jong-Ki
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.23-34
    • /
    • 2017
  • Purpose: The purpose of this study is to explore the relationship between suburban waterfront und urban regeneration strategies. Specifically, This paper investigates how urban design strategies for suburban waterfront has been conceptualized and realized in a case-based research study of the regeneration of suburban waterfront in Berlin, Germany. Since Germany's reunification, Berlin was faced a wide variety of challenges and has been transformed into a new capital city. First of all, Wasserstadt Berlin-Oberhavel was a key development task for the urban regeneration in Berlin. The Wasserstadt Berlin-Oberhavel project with over 207 hectares will provide new residential urban areas, office spaces, educational facilities and cultural facilities. In details, 3,640 apartments with 12,700 units and around 4,800 jobs will be created. Method: The study consists of five sections. The first and second section are divided into two stages:"waterfront definition in urban design" and "urban design strategy in waterfront". The third section explores the waterfront development process of Wasserstadt Berlin-Oberhavel. The fourth section aims to investigate the strategies for urban regeneration as well as waterfront development. Finally, the fifth provides some of the key policy challenges for Urban Regeneration in suburban waterfront area. Result: The results showed that urban regeneration strategies in suburban waterfront have a substantial impact on all two dimensions: relationship between waterfront and urban context, relationship between waterfront and natural environment.

A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects (도시재생사업 건설단계의 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 2009
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.