• Title/Summary/Keyword: Project financing

Search Result 152, Processing Time 0.03 seconds

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

Study on the Execution of Railway Project by Private Sector (철도사업의 민간투자에 관한 연구)

  • Park Hong-Kee;Park Yong-Gul;Yeum Dong-Shin;Lee Ik-Soo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.965-970
    • /
    • 2004
  • The private investment on the SOC facilities is a worldwide tendency since it can supplement the insufficient investment of public finance in the construction of infrastructures. Alter the formulation of private investment law, private sector's investment on roads, harbors and environmental facilities are being progressed considerably. However, railway construction by private sector is not active comparing to the former areas because of huge investment for construction but relatively low and unpredictable benefit in operation. This paper reviews the financial, social and institutional aspects on the private investment for SOC projects, especially railway projects. Also, this paper tries to find the desirable way to expedite the private investment on railway project,. Conclusively, the paper propose that the private sector in railway projects is better constituted with financial investor and the private financing could be. activated and settled if a stable minimum benefit on their investment being ensured institutionally, for example, by BTL.

  • PDF

Analysis on the Construction Cost of Steel Truss Stadium (철골 트러스 스타디움 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.75-82
    • /
    • 2007
  • Building costs means capital costs which include cost of land, cost of acquiring and preparing the site, construction costs, engineering fees, furnishings, cost of financing the project, and cost of management required to run and maintenance the building for use. An economic analysis is one of the most important factor to determine the project feasibility. The purpose of the this study is to analysis on the construction cost structure of steel truss stadium.

  • PDF

INVASION OF THE UK ORIGINATED QUANTITY SURVEYING PROFESSION INTO KOREA CONSTRUCTION INDUSTRY. A REVIEW OF THE QUANTITY SURVEYING CONSULTANCY SERVICES IN KOREAN CONSTRUCTION MARKET

  • Chan-Ho Yoon;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1419-1425
    • /
    • 2009
  • Quantity Surveying Profession is a new breed with a history of only less than seven years in S. Korea' s Construction Industry. In this paper, the research aims to investigate the background of the market entrance of this profession in Korean Construction Industry, and the current market direction and future market demands. The research concludes that climate changes in Real Estate markets in relation to Project Financing practices caused by economic crisis of late 1997's, enabled the UK originated QSP sustainable in S. Korea. Moreover it was pointed out that the services of QSP current available in S. Korea's market attributed the different aspect compared to traditional quantity surveying services prevailed in UK. Finally it was apparent that the evolutional direction of the future quantity surveying market in S. Korea is most likely toward multidisciplinary skilled services profession processing not only broader architectural knowledges but cost consciousness, specialty in construction costs and construction contract aspects and transparency in ethical manner.

  • PDF

Credit Enhancement and its Risk Factors for IPP Projects in Asia: An Analysis by Network

  • Chowdhury, Abu Naser;Chen, Po-Han
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.122-126
    • /
    • 2015
  • Credit enhancement is absolutely essential for financing Independent Power Producer (IPP) projects in Asia particularly for countries whose sovereign credit rating is on non-investment grade and foreign investment is difficult to achieve. Due to nexus of agreements among varies parties in IPP project, it is hard to clearly visualize the roles of these agreements. Examples are: What credit enhancement factors are most influential to minimize the associated risks of IPP projects? Why are they powerful? What are their roles? Who are less powerful and what are the obstacles that causes them less powerful? A research is conducted to identify the credit enhancement factors for IPP projects in Asia. IPP professionals validated 27 out of 28 identified credit enhancement factors, and five factor groupings were made through factor analysis. Afterwards, network theory is applied to find the unanswered questions, which by graphical and mathematical representations show that the host government's credit enhancement, MDBs, ECAs and other parties' credit enhancement are prominent and of great importance to handle the associated risks of IPP projects in Asia

  • PDF

CONSTRUCTION FINANCING AND INDUSTRY DEVELOPMENT

  • Yat-Hung, Chiang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.962-969
    • /
    • 2009
  • The market of building construction has been competitive in Hong Kong, perhaps as anywhere else in the world. The barrier to entry is low because there are relatively low requirements on the three factors of production - technology, manpower and finance. The prevailing building technology is traditional and labour-intensive. There is also not much need of capital because clients' periodic payments have been the main source of project finance. Further, capitalizing on trade sub-contracting, contractors have been able to keep their direct labour-force small and to transfer much of their business risk to the sub-contractors. Based on interviews to solicit the perception of a sample of building contractors on the particular issues of construction finance, we present the findings in this paper and discuss the various implications. We believe that the current practice of construction financing is both the cause and effect of the competition within, and the competitiveness of, the building construction sector in Hong Kong. We conclude that the building construction sector is "locked or stuck" in this "equilibrium" of traditional technology, reliance on clients' finance and exploitation of sub-contracting. In this "equilibrium" state, there is hardly any motivation for contractors to engage themselves in product or process innovation. Consequently, any talk of industry reform or innovation could only remain just that. We believe that this problem is not unique in Hong Kong. The building construction sector in many other developed and developing economies is posed with similar if not the same problems and constraints. We conclude that there has to be some "external forces" to bring this "equilibrium" state to a higher level "equilibrium" one where higher value-added building construction services are supplied and demanded. This is a state where building contractors possessing innovative technology, better financial and manpower resources could thrive to build better buildings with innovative building methods and processes.

  • PDF

Method for Composing a Portfolio for REITs Investment Using Markowitz's Portfolio Model

  • Lee, Chi-Joo;Lee, Ghang;Won, Jong-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.28-37
    • /
    • 2011
  • Domestic construction companies are suffering from financing difficulties in the wake of the economic slump in Korea and abroad. During this economic slump, real estate investment trusts (REITs), facilitators for improving financing and stimulating construction businesses, have increasingly expanded since their introduction in 2001. However, in terms of growth speed and marketing size, Korean REITs are falling behind those of other nations. The purpose of this study is to suggest a method for composing a portfolio using the Markowitz portfolio selection model to stimulate REITs. The main contents are as follows. First, a comparative analysis was conducted of increased REIT profit with the application of the Markowitz model and the average REIT profit rate from July 3, 2007, to July 21, 2008, during the investment analysis periods. The results showed that the total profit rate from the Markowitz model was about 10% higher than the average REIT profit rate. Second, the sensitivity was analyzed according to the portfolio's data-gathering and replacement cycle to measure the optimum cycle and yield. The six-mouth profit data collection period showed about 16% higher profits with the Markowitz model than with the REITs. The two-week portfolio change period resulted in about 11% higher profits with the Markowitz model than with the REITs.

An Economic Analysis with the Productive Rate of Return (생산투자수익률을 적용한 생산투자사업의 경제성 분석)

  • Kim, Jin Wook;Son, Immo;Shin, Jaiwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.50-56
    • /
    • 2017
  • The IRR (internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it is widely known that it has serial flaws. Also, External rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return) do not differentiate between the real investment and the expenditure. The PRR (Productive rate of return) is faithful to the conception of the return on investment. The PRR uses the effective investment instead of the initial investment. In this paper, we examined two cases of the engineering project. the one is a traditional engineering project with financing activity, another is the project with R&D. Although the IRR has only one value, it overestimates or underestimate profitabilities of Engineering Projects. The ARR and the MARR assume that a returned cash reinvest other projects or assets instead of the project currently executing. Thus they are only one value of a project's profitability, unlike the IRR. But the ARR does not classify into the effective investment and non-investment expenditure. It only accepts an initial expenditure as for an investment. The MIRR also fails to classify into the investment and the expenditure. It has an error of making a loss down as the investment. The IRR works as efficiently as a NPW (Net Present Worth). It clearly expresses a rate of return in respect of an investment in an engineering project with a loan. And it shows its ability in an engineering project with a R&D investment.

Land Bank Bond for the Diversification of Land Bank Financing Resources: Comparative Case Study and the Improvement of Legal, Accounting System (토지비축의 안정적 재원조달을 위한 토지은행채권 도입방안: 사례 비교를 통한 법·제도·회계처리 개선방안을 중심으로)

  • Lee, Jong-Kwon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.333-341
    • /
    • 2012
  • The financial resources for public land banking enacted by Public Land Banking Act (2009) are LH (Korea Land and Housing Corporation) contributions, LH Bond, Land Bank revenues, etc. But, in real, the efficient funding resource is mainly LH bond. In these days, LH has experienced deep financial distress, and difficulties in issuing it's bond. Therefore, Land Banking project also has been inactivated because of poor financial resources. As Land Banking project depending its financial resources mainly on LH Bond does not have financial sustainability, it is necessary to reform the fundamental funding structure. This is the starting point for the topic of this paper. This paper suggests to reform the funding structure, and to introduce Land Bank Bond guaranteed by Government, and also to modify the accounting method of Land Bank to separate the Land Bank accounts with LH accounts. The funding structure reform can be summarized as follows; In early stage of the Land Banking project, sufficient government support by guaranteeing the Land Bank Bond is necessary. Gradually, the portion of LH's contribution can be increased in company with LH's financial distress being solved and administration being normalized. When the project reached on the stage of maturity, cash inflows by selling the reserved land can exceed the cash outflows for reserve new land. To introduce the Land Bank Bond guaranteed by government, the Public Land Banking Act (2009) should be revised. Along with this, to modify the accounting method of Land Bank, the rule for public enterprise accounting system must be partially revised.

Influence of Overseas Construction Business on Construction Companies' Financial Stability (해외건설사업이 건설업체 재무적 안정성에 미치는 영향 분석)

  • Cho, Kyu-Su;Lee, Sang-Hyo;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.43-51
    • /
    • 2013
  • The changes in business structure of domestic construction companies suggest that there is a close relationship between the volume of overseas project and a company's financial condition. Based on this assumption, this study conducts an empirical analysis on a relationship between overseas project and financial stability of a construction company. The ratio of liquidity and liability was used as liquidity index and stability index respectively. The analysis was based on quarterly time-series data between 2000 and 2010. Two models were constructed for the analysis: Model 1 was based on the liquidity ratio and the amount of domestic and overseas construction project; Model 2 was based on the debt ratio and the amount of domestic and overseas construction project. The analysis results showed that the increasing amount of overseas project facilitated short-term financing with greater liquidity, and yet it was not very effective in lowering the debt ratio. This suggests that the dramatic increase in overseas construction project, which is observed recently, is not entirely an optimistic sign.