• Title/Summary/Keyword: Project cost

Search Result 2,431, Processing Time 0.025 seconds

Study on validating proper System Requirements by using Cost Estimations Methodology (비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구)

  • Choi, Sung Kyu;Choi, Eun Ha
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.97-105
    • /
    • 2013
  • It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Project scheduling by FGP to Time-Cost-Quality trade off: construction case study

  • Faregh, Najmeh;Ketabi, Saeedeh;Ghandehari, Mahsa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.53-59
    • /
    • 2014
  • Project managers are responsible to conduct project on time with least amount of costs and the most possible quality with respect to shortage of resources and environmental certainties. They have to make the best decision to reach such conflicting objects. In this study the project scheduling with multi goals-multi modes was planned in fuzzy conditions under resource constraints and expanded by fuzzy goal programing (FGP). The project cost was calculated by the price of renewable resources and the quality criteria were evaluated by the quality function deployment method (QFD). Finally the model was verified by a construction case study with 22 activities along with solving by GAMS. The results showed that this model could provide a systematic framework to facilitate the decision making process and made the project managers to be able to schedule the project closer to reality.

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF