It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.
In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.
Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.
International conference on construction engineering and project management
/
2011.02a
/
pp.168-175
/
2011
Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.379-382
/
2001
In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.
Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.475-478
/
2013
To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.
Journal of the Korean Operations Research and Management Science Society
/
v.20
no.1
/
pp.85-99
/
1995
Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.
Journal of Construction Engineering and Project Management
/
v.4
no.3
/
pp.53-59
/
2014
Project managers are responsible to conduct project on time with least amount of costs and the most possible quality with respect to shortage of resources and environmental certainties. They have to make the best decision to reach such conflicting objects. In this study the project scheduling with multi goals-multi modes was planned in fuzzy conditions under resource constraints and expanded by fuzzy goal programing (FGP). The project cost was calculated by the price of renewable resources and the quality criteria were evaluated by the quality function deployment method (QFD). Finally the model was verified by a construction case study with 22 activities along with solving by GAMS. The results showed that this model could provide a systematic framework to facilitate the decision making process and made the project managers to be able to schedule the project closer to reality.
Korean Journal of Construction Engineering and Management
/
v.24
no.3
/
pp.52-61
/
2023
Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.728-731
/
2007
In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.