CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

A Case Study on a Programming Subject through Project-Based Learning in the COVID-19 Environment (코로나-19 환경에서의 프로젝트 교수법을 통한 프로그래밍 지도 사례)

  • Lee, Sungock;Yang, SeungEui;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.11
    • /
    • pp.1655-1662
    • /
    • 2021
  • The purpose of this study is to draw implications through a case study on the curriculum operation of a professor who operated a programming subject as a PBL(project-based learning) method in an untact situation due to COVID-19. A survey was conducted for first-year freshmen students to determine their learning condition before project implementation. Based on the results of the questionnaire, individual interviews were conducted to identify the needs for education, and then, basic grammar for project completion and lectures that segmenting each stage of the project were composed. Repeated learning was induced through weekly quizzes, and feedback was given by giving time in advance until the project deadline. 23 students (40 students in total) completed the project. The remaining 17 students took the exam but did not complete the project. The purpose of this study is significant in that it investigated whether a project can be carried out through instructional design, execution, and interaction while operating a programming subject through PBL in the COVID-19 environment.

A Model Study for Software Development Effort and Cost Estimation by Adaptive Neural Fuzzy Inference System

  • Kim, Dong-Hwa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.376-376
    • /
    • 2000
  • Several algorithmic models have been proposed to estimate software cost and other management parameters. In particular, early prediction of completion time is absolutely essential for proper advance planning and a version of the possible ruin of a project. However, estimation is difficult because of its similarity to export judgment approaches and for its potential as an expert assistant in support of human judgment. Especially, the nature of the Norden/Rayleigh curve used by Putnam, renders it unreliable during the initial phases of the project, in projects involving a fast manpower buildup, as is the case with most software projects. Estimating software development effort is more complexity, because of infrastructure software related to target-machines hardware and process characteristics should be considered in software development for DCS (Distributed Control System). In this paper, we propose software development effort estimation technique using adaptive neural fuzzy inference system. The methods is applied to case-based projects and discussed.

  • PDF

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

Information Systems in Project Management of The Public Sphere

  • Mamatova, Tetiana;Chykarenko, Iryna;Chykarenko, Oleksii;Kravtsova, Тetiana;Kravtsov, Olеg
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.8
    • /
    • pp.141-148
    • /
    • 2021
  • Project management is a current trend of management in the public sphere, based on different principles, methods and tools. The tools include information technologies providing control over time, cost, quality and planning process in order to ensure accountability to interested parties. The goal of the research was to examine the impact of the integration of information systems in project management of the public sphere on the quality of public governance and administration using the example of infrastructure projects involving the private sector in developing countries. The methodology of the research is based on the concepts of "digital-era governance" (DEG), "Information governance" and "project governance" to determine the effectiveness of information systems and technologies in the management of infrastructure projects in the public sphere. The data from the countries with Lower middle income (India, Indonesia, Philippines, Ukraine, Vietnam) and Upper middle income (Argentina, Brazil, China, Colombia, Mexico, Peru, Romania, Russian Federation, Thailand, Turkey) for 1996-2020 were used to study the effects of DEG. The results show two main trends in the countries with Lower middle income and Upper middle income. The first trend is the development of digital governance, the concept of "digital-era governance" through information systems and performance measurement of the governance system, forecasting of investment flows of infrastructure projects, measurement of payback and effectiveness parameters for investment management in the public sector, decision support. The second trend is the existence of systemic challenges related to corruption, social and institutional factors through the development of democracy in developing countries and the integration of NPM similar to developed countries. The confidence of interested parties, especially private investors, in public authorities is determined by other factors - the level of return on investment, risks and assignment of responsibility, probability of successful completion of the project. These data still remain limited for a wide range of project participants, including citizens.

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

A Study on the State of Claims and Disputes in Interior Design Projects - Focusing on Practices and Experiences of Interior Designers - (실내디자인 업무의 클레임 현황과 분쟁사례 분석에 관한 연구 - 실내건축가를 대상으로 한 실무사례를 중심으로 -)

  • Lee, So Young;Kim, Wook Seon
    • Korean Institute of Interior Design Journal
    • /
    • v.27 no.3
    • /
    • pp.116-125
    • /
    • 2018
  • With rapid economic development in Korea, interests in interior design have increased gradually. However, interior design markets were poorly evaluated from 2015 Korean Consumer Evaluation. It is necessary to identify what kinds of problems, defects, and consumer claims have arisen during interior design planning and construction procedures. Therefore the purpose of this study is to investigate claims and disputes in interior design project procedures and to find out when defects or claims take place in those procedures in order to reduce claims or defects. Email questionnaires were distributed to KOSID members (professional interior designers) using Google Survey. In addition, a focus group interview was conducted. A total of 54 responses were collected and analyzed using SPSS 19. As a result, in an agreement stage, alteration in materials is the major source of claim. More than a half of respondents addressed time shortage for programming and planning. During the construction stage, approximately 31% respondents experienced client dissatisfaction with materials and finishes. The reason for project completion delay was due to claims during construction. The claims most frequently appealed by clients were related to painting. The satisfaction with project quality is positively related to the quality and contents of design documents including design drawings and specifications. Regulations and communication with clients are important issues to reduce the gaps between interior designers and clients/ consumers.