• 제목/요약/키워드: Project area

검색결과 2,454건 처리시간 0.037초

지역행사를 통한 농촌 활성화 사례 분석 (A Case Study for Promotion Project of Rural Area througy the Events)

  • 김기성
    • 한국농촌계획학회:학술대회논문집
    • /
    • 한국농촌계획학회 1998년도 정기총회 및 춘계 학술논문발표회
    • /
    • pp.27-30
    • /
    • 1998
  • In today's rural area, diverse community has formed with the progress of urbanization, congestion, underpopulation, and aging according to the change of socio-economic conditions. In this situation, local residents are cooperating to overcome many problems about rural society. That is, various counterplans are established to induce the forming of new ural society in the aim for the development of rural area and promotion project of rural area. In this text, the effects for events of rural society and future directions are suggested by studying the case of Pyongchang, Kangwon-Do.

  • PDF

공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究) (A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project)

  • 김기대;김병호
    • 수산경영론집
    • /
    • 제37권1호
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF

도시정비형 재개발사업 소요기간의 영향요인 - 사업구역과 경제적 및 입지적 특성을 바탕으로 - (A Study on the Factors affecting the Duration of Urban Redevelopment Projects - Based on the Project Area, Economic and Locational Characteristics -)

  • 이재원;배상영;정보선;이상엽
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.61-68
    • /
    • 2021
  • 본 연구는 서울의 도시화율이 높아지고 도심 내 노후·불량 주거지가 증가함에 따라 지속적인 정비사업의 필요성이 요구되는 가운데 장기간의 사업기간을 소요하는 도시정비형 재개발사업을 대상으로 사업기간에 영향을 미치는 요인을 분석하고자 하였다. 이를 위해 서울 전권역의 2005년 이후 사업구역으로 지정되어 관리처분계획인가까지 완료한 사업구역 중 데이터 구성이 가능한 75개 사업구역을 대상으로 설정하였다. 구역지정부터 관리처분계획인가까지 소요된 기간을 종속변수로 하여, 재개발사업구역의 특성과 경제적 특성, 입지적 특성을 독립변수로 설정하여 헤도닉가격모형으로 분석하였다. 분석결과, 사업구역 규모가 작을수록, 조합원 1인당 차지하는 구역면적이 클수록, 지가변동률이 클수록, KOSPI 지수가 작을수록 소요기간이 단축되는 것으로 나타났다. 본 연구는 사업구역의 규모를 고려한 특성 변수와 사업 진행 시기의 경제적 특성, 입지적 특성을 모형으로 하여 사업의 소요기간에 미치는 영향을 실증분석하였다는 점에서 기존 연구와 차별점을 가진다. 연구결과를 통해 본 연구는 도시정비형 재개발사업의 사업구역 설정 시 사업구역 면적과 조합원수, 경제적 상황 등이 고려되어야 한다는 시사점을 제공하며 이를 통해 재개발사업을 추진하는 시행자와 시공자, 금융기관 등의 사업참여자와 이를 관리하는 지자체 관계자들의 합리적인 의사결정에 도움이 되고자 한다.

월남국 고콩지구 수리 개발 기본 조사 (The Engineering Services on the Go Cong Water Control Project in Vietnam)

  • 조용칠
    • 한국농공학회지
    • /
    • 제13권4호
    • /
    • pp.2471-2478
    • /
    • 1971
  • Go Cong Water Control Project was conducted on its preliminary survey and design by Agricultural development Corporation for the Korean Government, an Executing Agency, and Directorate of Irrigation and Rural Engineering of the Ministry of Land Reform, Agriculture and Fishery Development for the Vietnamese Government, a cooperation Agency, under Korean and Vietnamese Economic and Technical Cooperation Program. The main purposes of the project are aimed at the improvements of irrigation and drainage, and salt water prevention of the Go Cong area located at northern part of the Mekong Delta. All the works from field survey through design to preparing reports were carried out by ADC alone and recently Korean Government submitted the relevant reports to vietnamese Government through official channel. The contents of the project are summarized as following: 1. The project comprises irrigation, drainage and salt water prevention facilities on the benefited area of about 55,000 hectares, covering Go Cong and Dinh Tuong(My Tho) Provinces and it will be possible to cultivate rice cropping twice a year, irrigating all the area in the dry season; 2. With completion of this project, annual production of rough rice and vegetables are anticipated to increase by 222,600 .T. and 142,600 M.T. respectively and the internal rateof return stants at 26 per cent, applying for the exchange rate of US $ 1 to VN $ 275. 3. Total investments required for the project are estimated at US $ 56,394,000 of which actual construction cost is estimated at US $ 39,183,000. The project has planned to be d to be developed by four stages, taking bout 7 years. 4. The project needs for three places of pumping plants. 57Km of feed and main irrigation canals, 81Km of drainage channels, 97Km of dike, 23 places of sluices and navigation locks, etc.

  • PDF

프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구 (Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase)

  • 김기문;박유진;김기주
    • Journal of Information Technology Applications and Management
    • /
    • 제20권4호
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

Waterfront Development Project Pattern Analysis of the Coastal Zone Management of the Osaka Bay

  • Yang, Jae-Joon;Yhang, Wii-Joo
    • 한국항해항만학회지
    • /
    • 제27권3호
    • /
    • pp.329-333
    • /
    • 2003
  • Study of the background and state of Osaka's waterfront space development and analysis of the functions of 22 chosen major facilities of development project reveals the following four types: amenity-oriented development, large-scale synthesis type development, renewal compound area type development, exchange communication promotion type development. Osaka bay area has served primely as the base of harbors, industry and energy, while analysis of the ongoing project has found that the city has been making a functional transition to a type of development to live up to the needs of the times, suggesting that is wise that Korea's future direction of waterfront development be oriented toward environmental-friendly development by taking advantage of low-density area's natural resources. Given the plurality and complexity of the law of coastal zone, what is needed is a legal maintenance for coastal zone's clear-cut coordinating function and for environmental-friendly development with the limitations of seaside and coastal functions in mind.

Analysis of Data and Information Flow for Pipeline in Permafrost Area

  • Won, Seo-Kyung;Lee, Do-Yun;Lee, Junbok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-745
    • /
    • 2015
  • Since the G20 summit in 2011, South Korea who was dependent on foreign energy needs of 97% receives natural gas from Russia from 2015 to 30 years, but South Korea is a situation of scarce experience and skills of pipeline project in permafrost area. In this study, we kept the target for analyzing the data and information flow of the pipeline projects in permafrost area, and the ultimate goal is set to developing the hierarchy structure of design and construction data for an efficient administration of the project. In order to develop that structure, Configuration Management was introduced and through this method, it is expected to be used to build the overall information management system in O&M phase.

  • PDF

캄보디아 크랑폰리강 유역 다목적 수자원개발사업 (The Krang Ponley Water Resources Development Project on Cambodia)

  • 김명림;최병습;전근일
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.823-828
    • /
    • 2008
  • In accordance with the Cambodian government's poverty reduction policy, the Krang Ponley Water Resources Development Project was selected and has been carried out as a priority to develop the northwest areas of Phnom Penh since early 2003. Rehabilitation and new construction of water supply system such as embankments, canals and hydraulic structures are urgently needed for stable water supply, hydropower generation and flood damage reduction within the project area. The completion of the project is expected to be extremely helpful in the economic development of Cambodia as well as to improving the economic conditions of the residents in the project area.

  • PDF

지역 관광자원을 활용한 권역단위종합정비사업 기본계획 수립 -청도군 남성현감꽃권역을 대상으로- (Rural Village Development Project based on Local Tourism Resources -Focused on Namsunghyun area, Cheongdo-gun-)

  • 박진욱;엄붕훈
    • 농촌계획
    • /
    • 제18권3호
    • /
    • pp.187-200
    • /
    • 2012
  • This article deals with rural village development project of Namsunghyun 'Gamggot(persimmon flower)' area, based on local tourism resources. For more efficient use of local tourism resources, questionnaire surveys for local residents and visitors were conducted. On the base of the results, the vision and objectives were established. And each items of project by division were also considered by the results of such surveys. Finally, priority scores of each items of project, based on importances and weighted value, were derived for more efficient propulsion of project and to construct sustainable rural community.

어장·어촌과 연계한 지방어항건설사업의 평가분석 (The Evaluation Analysis of the Local Fishing Port Construction Project in Connection with Fishery and Fishing Village)

  • 신승식;박주삼
    • 수산해양교육연구
    • /
    • 제20권3호
    • /
    • pp.369-380
    • /
    • 2008
  • The government has promoted the local fishing port construction project since 1972 for conquest of the crisis of the fishing village by withering of a fishery, the improvement in fishermen's living environment and quality of life, and promotion of fisheries. In order to estimate the local fishing port construction project objective and synthetically, and to grope for the method proposal of system establishment of the project, the monitoring survey was carried out. The monitoring survey was classified into the program and the performance monitoring. The program monitoring was carried out in order to investigate the project fit for the inhabitants of a fishing village. The performance monitoring was carried out in order to investigate the development latent powers, fishery latent powers, tourism latent powers of a fishing village, rural settlement conditions, etc. using various statistical materials. Since investigating the measured value before executing a policy was not completed, the project effect was compared with the measured value of other areas. According to the local fishing port construction project, the development latent powers, fishery latent powers, and tourism latent powers of the fishing village where the project was undertaken improved greatly, and income of the fishing village increased greatly. As a result of comparing project fit in order to evaluate the project, the project fit of the local fishing port construction project area was higher than the non-project area. Desirable method proposal of monitoring survey was established and the method for raising the efficiency of monitoring survey was extracted.