Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis (구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석)

  • Seong, Do-Yun;Baek, In-Soo;Kim, Jea-Jun;Ham, Nam-Hyuk
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Analysis of Success Factors of Rural Village Community Revitalization Project Based on Neo-Endogeneous Development Theory: Focusing on Seven Rural Villages in Cheonan, Chungnam province (신내생적 발전론에 입각한 농촌마을공동체 활성화 사업의 성공 요인 분석: 충남 천안지역 7개 농촌마을을 사례로)

  • Ko, Kyoung-Ho
    • Korean Journal of Organic Agriculture
    • /
    • v.30 no.1
    • /
    • pp.51-74
    • /
    • 2022
  • This study aimed to identify a difference in project implementation between villages that had executed rural village community activation support work successfully and those that had quit in the middle from the new endogenous development theory perspective. As a result, it was found that the main factors used for promoting to increase endogeneous development capabilities existed more in villages that executed project implementation support work successfully than in villages that had quit in the middle. Successful villages have a difference from the villages that had quit in the middle in that they have established a participatory decision making and cooperation system for stable operation even before their support work began, they have more assets for promoting community activity, residents' interaction and communal activity are becoming more active, and reciprocity-based mutual aid culture exists in many forms. In conclusion, seeing from the new endogenous development theory perspective, villages are developed under the interaction between internal and external factors, but the outcome of project implementation depends on whether village community holds its endogenous development capability to operate and develop such whole process of development. Therefore, village community activation policies need to be reinforced in the direction toward promoting to create the main factors for enhancing endogenous development capabilities.

Workload and Productivity during Work from Home (WFH) for the Construction Workforce

  • Wu, Hongyue;Chen, Yunfeng
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.492-499
    • /
    • 2022
  • A large number of employees shifted to Work from home (WFH) due to the COVID-19 pandemic, including the construction workforce. The changes in workload and productivity due to WFH impact the work performance and economic outputs of companies. However, there are mixed results about the impacts of WFH on workload and productivity. In particular, limited studies focused on specific types of work of different occupations in the construction workforce. This study aims to explore the impacts of WFH on workload and productivity considering different types of work for the construction workforce in the U.S. After identifying three main occupations and five types of work, an online survey (N = 69) was distributed. Descriptive analysis showed that participants had less workload (0.82 hours/week) and lower productivity (9.69%) during WFH. Three occupations had varied changes due to the different types of work. Analysis of Variance (ANOVA) indicated that there was no significant difference in workload, while productivity was decreased during WFH. In particular, the productivity of project-related work and communication and documentation decreased significantly. Overall, participants finished 2.85% less workload per week during WFH. The findings provide an insight into WFH in the construction workforce, which improves future remote or hybrid work arrangements in the construction industry.

  • PDF

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

A Qualitative Approach to eIT Project Management (e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발)

  • Jeong, Gi-Ho
    • Journal of Information Technology Services
    • /
    • v.1 no.1
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

Masonry work interference factor deduction based on daily report data analysis (작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

ESG-oriented Governance Work System for Smart Highway Implementation

  • Bong-Shik, Yun;So-Wol, Yoo
    • Smart Media Journal
    • /
    • v.11 no.10
    • /
    • pp.36-45
    • /
    • 2022
  • This study was promoted to prepare an ESG-oriented work system for Korea Expressway Corporation through sustainable highway construction, IOT-based smart highway preparation, and establishment of a broad convergence business governance system between multiple ministries and implementing entities. Based on the 2nd Basic Plan for Landscape Policy (2020~2024) and the Public Design Promotion Act (2018~2022), the study was conducted through the improvement of the highway design method to be applied for four years from 2021 to 2024, the changes in construction and social conditions related to expressways, the analysis of policies and plans to secure consistency with the 'Korean New Deal', and the analysis of the project performance and work promotion system that the Korea Expressway Corporation's business execution organization has promoted together with each government department. The results of this research are expected to help the Korea Expressway Corporation establish the 21st Innovation Plan for the phased construction of a "100-years landscape with people" and the preparation of a sustainable future highway environment creation project for the lives and safety of the people.