• Title/Summary/Keyword: Project System

Search Result 6,664, Processing Time 0.035 seconds

A Case on the Evaluation of the Information System Project to Enhance the Performance of DIMS(Defense Material Information System) (국방물자정보시스템 성능개선 사업평가에 대한 사례)

  • Cho, Sung-Rim;Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.1
    • /
    • pp.109-123
    • /
    • 2012
  • There are many evaluation models to measure the informatization level of an organization and information system project in the ministry of National Defense of Korea. A information system has to keep up with the environment change as well as the advanced recent information technology (IT). Therefore, the evaluation of an information system project to enhance the performance of the information system should be different from the existing evaluation methods. This study suggests an evaluation case of information system projects to enhance the performance of an information system. In order to achieve the objective of this study, the following steps are taken. First, it reviews the background and the scope of the project to enhance the performance of the Defense Material Information System (DMIS). And it sets up the evaluation logic and develops performance indexes. Then it applies these newly developed performance indexes to the information system project and measures the performance. From this study, we found that both the diffusion and the experience accumulation by its continuous use are significant factors in such evaluations.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

A Study on the Project Manager's Reaction to R&D Evaluation and Its Influencing Factors (연구과제 평가에 대한 과제책임자의 반응과 그 영향요인에 관한 연구)

  • 김인철;한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.3 no.2
    • /
    • pp.48-60
    • /
    • 2000
  • An effort has been made in this paper to measure the project manager's reaction to R&D project evaluation and present the useful information related to rebuilding an R&D evaluation system. Results of this study show that project manager's reaction is related to the selection of reasonable items for evaluation, the rater's expertise, the project manager's participation in evaluation process and so on. Accordingly, managers of the research institute have to set up the evaluation system after deeply considering these results.

  • PDF

An Information System Implementation Case Research on Korea Train eXpress (고속철도에 있어서의 정보시스템 구현 사례에 대한 연구)

  • Lee, Sung-Ho;Ahn, Joong-Ho
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.1-21
    • /
    • 2005
  • Integrated Railroad Information System(IRIS) Construction Project is one of the super projects in Korea required to invest over 100 billion won and 10,000 engaged manpower until Dec 30, 2004. Composition of this paper is as follows; firstly, examined individual contents and aspects of IRIS, and studied formality and contents that have been based to project methodology for successful propulsion of project in overall situation of SI project progress until present. Secondly, presented for construction background of IRIS as well as Project Management and Project Development Methodologies. Thirdly, described each characteristic and development substance for individual systems after present whole contents and system image of the system. Finally, presented successful propulsion result of this project and development directions. We presented development example laying stress on IRIS's Project contents and propulsion circumstances. Evaluation about operation results should be analyzed and studied in detail operating system from now on.

A study on the management system of data and documents for the LRT Project using the systems engineering approach (시스템엔지니어링 기법을 활용한 경량전철사업의 자료 및 산출물 관리 체계 구축에 관한 연구)

  • Choi, Yo-Chul;Han, Seok-Youn;Kim, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.239-246
    • /
    • 2011
  • This paper is a study on the management system of data and documents for the LRT Project using the systems engineering approach. It is addressed a computed based management system using the Systems Engineering Approach toward system thinking to manage effectively and efficiently data and documents. Because the unified efforts was insufficient data and outcomes of project management and systems engineering during the existing LRT Project, we proposed the unified computer management system for the project management and systems engineering efforts using the systems engineering methodology like as a operation concept, collection and analysis of requirements, and functional architecture analysis. This will offer supply efficiently data and outcomes management for the LRT project and then support the automatical document publish output.

  • PDF

Analysing the Effects of Regional Development Project on Regional Economic Development: An Application of System Dynamics Approach (시스템다이내믹스를 이용한 지역개발사업의 파급효과분석)

  • Choi, Young-Chul
    • Korean System Dynamics Review
    • /
    • v.6 no.1
    • /
    • pp.147-176
    • /
    • 2005
  • This paper attempts to analyse the financial validity of the Eco-therapy project which 'J' city in 'C' province has been eagerly trying to implement for its regional economic development and also to estimate the potential economic impact of the project on its regional economy. In doing so, it employs system dynamics which is a methodology for studying and managing complex systems, such as one finds in business and other social systems. Analytic framework for this study is constructed, based on the existing theoretical studies. This study concludes that the Eco-therapy Project concerned is economically and financially valid and it is also expected that the regional economic impacts arising from the construction and operation of the facilities concerned are greater than any other project which 'J' city has been pursuing.

  • PDF

SYSTEM ARCHITECTURE FOR INTEGRATION OF CONSTRUCTION E-BUSINESS SOLUTIONS: A MODEL FOR ENTERPRISE RESOURCE PLANNING AND PROJECT MANAGEMENT SYSTEM

  • Boong-yeol Ryoo;Irtishad U. Ahmad;Juan Zheng
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.497-502
    • /
    • 2005
  • Needs of automation and computerization in the construction industry has been recognized but the implementation of e-business solutions with project management systems has not been fully explored. In order to cope with different management practices in home office and project sites, integration of two popular systems, Enterprise Resource Planning (ERP) and Project Management System (PMS) is essential. The objective of this study is to find ways to functionally and systematically integrate ERP and PMS. With the integration of ERP and PMS, a project will be managed much more efficiently and effectively. It is expected that this study will benefit system integrators and help them to understand construction management processes and integrate the solutions with minimized programming work.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF