철도안전프로젝트에 적용한 시스템엔지니어링 관리계획서 작성에 관한 연구 (A Study on the Systems Engineering Management Plan for the Railway Safety Project)

  • 최요철;조연옥
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.482-486
    • /
    • 2006
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

도시철도시설 표준화기준을 위한 DB구축방안 연구 (The DB structure for Standard Criteria of Urban Transit Facilities)

  • 이우동;김진호;한석윤;신원식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.213-214
    • /
    • 2008
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

Development of Risk Analysis System for Integrated Environmental Management in Korea

  • Shin, Dong-Chun;Kim, Ye-Shin;Park, Sung-Eun;Yang, Ji-Yeon;Lim, Young-Wook
    • 한국환경독성학회:학술대회논문집
    • /
    • 한국환경독성학회 2003년도 추계국제학술대회
    • /
    • pp.162-163
    • /
    • 2003
  • The Eco-2 Project presents a win-win strategy for the environment and for the economy (ECO-2 is an abbreviation of Ecology and Economy), The project was initiated by the Korean Ministry of the Environment to promote the development of an environmental industry technology as a means of driving national development in this sector. Our project work belongs to the category of integrated environment management technology, and is described as a development and utilization of risk assessment and analysis system for integrated environmental management in municipal and industrial areas. The goal of our project is to develop available system software in health and ecological risk assessment and to offer it as Decision Support System (DSS) to aid the effective management of environmental risk in municipal and industrial areas in Korea.

  • PDF

Advanced Nanoimprinting Material for Liquid Crystal Alignment

  • Gwag, Jin-Seog;Oh-e, Masahito;Yoneya, Makoto;Yokoyama, Hiroshi;Satou, H.;Itami, S.
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권1호
    • /
    • pp.534-537
    • /
    • 2007
  • To promote liquid crystal application of nanoimprint lithography, a polymer with new concept is proposed. The material consists of a polyamic acid for good LC alignment and an epoxy resin for good imprinting. The result of sum-frequency generation (SFG) vibrational spectroscopy proves that this material is a functionally gradient material. This material shows excellent capability as a nanoimprinting material as well as an LC alignment layer.

  • PDF

시스템 다이내믹스를 이용한 건설성과 인과지도 개발 (Development of a Construction Performance Causal Map Using System Dynamics)

  • 강진영;박희성
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

투자사업의 수익성 평가 및 분석에 관한 소고 -주물시설에 대한 IRR를 중심으로- (Some Considerations of the Evaluation and Its Analysis on tile Profitability of the Investment Project. -On the Calculation and Analysis of IRR in Casting Facilities-)

  • 이상억
    • 산업경영시스템학회지
    • /
    • 제2권2호
    • /
    • pp.53-62
    • /
    • 1979
  • A widely accepted indicator of a project's economic potential is the internal rate of return (IRR). The primary objective of feasibility analysis for any project is to measure the economic potential for the project, normally defined as the expected return on capital investment. The analysis should be designed to determine whether a project is technically and economically sound, and under what conditions. Therefore, there are factors other than economic potential that must be taken into account in the reasonable composition of an investment program. These kinds of factors can be given proper consideration in project selection after the economic feasibility of alternative projects has been determined. The primary reason for having to choose among different projects is that capital resources are scare : the investment budget is limited. The case project, casting facilities investment project, treated in this paper were selected for their value in illustrating the methods of feasibility analysis. This case project an actual potential project and is analyzed on the basis of the best available data for the specific conditions for that project.

  • PDF

공공건설사업의 발주방식 선정 및 성과평가 모델 (Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects)

  • 유일한;김경래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.41-47
    • /
    • 2007
  • 최적 발주방식을 선정하는 것은 해당 사업의 성공적 수행을 위한 것이며, 이는 곧 사업의 목표를 달성시키는 것이다. 또한 사업특성에 적합한 발주방식의 선정과 사업의 성과는 밀접한 연관성을 갖는다. 이러한 취지에서 재정경제부는 2007년 10월 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모${\cdot}$기술제안입찰"이라는 발주제도를 새로이 도입하였다. 다양해진 발주제도를 효율적으로 운영할 수 있도록 하기 위해 본 연구는 공공건설사업의 특성을 정량적, 정성적으로 평가하여 해당 사업에 가장 적합한 발주방식을 선정할 수 있도록 하는 발주방식 선정모델을 제시하였다. 그리고 발주방식 성과평가 모델을 함께 제시하여 발주방식 선정 및 운영의 결과를 후속 사업의 피드백 할 수 있도록 하였다. 이와 같은 표준적인 모델은 공공발주기관의 의사결정을 지원하는 도구로 활용될 수 있을 것이다.