• Title/Summary/Keyword: Project Schedule

Search Result 615, Processing Time 0.026 seconds

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

Development of a Scheduling System for Mould and Die Manufacturing Factory Using Microsoft Project 98 (Microsoft Project 98을 이용한 금형공장의 일정계획 시스템 개발)

  • Ju, Sang-Yoon;Ok, Kyung-Jin
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.246-252
    • /
    • 2000
  • As moulds and dies are manufactured through complex processes under the make-to-order production environment, it is very difficult that the manufacturing activities as like observance of the due date, trace of the progress, etc are controlled with a real time. In this paper, a schedule-planning system using the commercial software Microsoft Project 98 is developed to control the procedures of mould and die manufacturing with real time. Once an initial schedule is planned from the BOM information in the intranet, it is rescheduled by data collected from machines on the shop floor. The system is suitable to medium- or small-sized manufacturing companies as well as large-sized ones, because it can be installed with a low cost.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

Case Studies on Preparing a Business Plan for the Foundation of Food Service Business and Analysis of Investing Economy. (외식사업 신규창업을 위한 사업계획서 작성방법 사례와 투자경제성 분석에 관한 연구)

  • 홍기운
    • Culinary science and hospitality research
    • /
    • v.3
    • /
    • pp.385-421
    • /
    • 1997
  • This study was performed as placing stress on business plan preparation and investing economy analysis centered to cases upon presenting the premises of study for new foundation of food service business. The summarized results are as follows: 1. In the aspect of carrying out process of practical project, establishing the promotion strategy, the facility project program, the menu program, the facility and furniture program, organization & manning schedule, the business operation schedule, review of all laws & provisions and the allout promotion schedule in order were deployed. 2. Analysis of investing economy for review of profitability 1) In case of investment, excluding 600million for the real setate lease among the total investment of 1billion, it was required by 161, 235, 000 for interior project, 161, 110, 000 for facility & equipment, 19, 235, 000 for fittings, 27, 600, 000 for menu plate & uniform, 27, 600, 000 for furniture, 13, 800, 000 for sign article. 2) In case of loss & profit presumed the annual turnover is to be 1, 115, 856, 000 the contigent profit(before tax) is to be 148, 966, 000 which is 13.3% in comparson to the sales amount and the net profit(after tax) for this term s to be 104, 276, 000 which is 9.3% against the sales and the profitable ratio to the equity investment( 500 million) is 20.9% and it satisfies 20% of the premises of study. 3) In case of the payback period will be approximately two(2) years which indicated within three(3) years that is standard of new project evaluation term of ordinary enterprise. 4) In case of internal rate of return it will be 21.5% which is favorable profitability as taking into account of 15% that is standard of new project evaluation by ordinary enterprise based on general downtown money interest. That the investing value of Happy Day profitability is hinted as it is sufficient enough as the case under this study based upon such results and considered that securing supremacy is competitive power in case of commitment will be possible.

  • PDF

Application of Linear Schedule Chart for Schedule Management of Linear Construction Project (선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안)

  • Lee, Jaehee;Kang, Hyojeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.13-23
    • /
    • 2023
  • Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

Limiting the Number of Open Projects to Shorten the NPD Schedule

  • Wang, Miao-Ling;Yang, Chun-I;Chang, Sheng-Hung
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.1
    • /
    • pp.34-42
    • /
    • 2011
  • Many companies open multiple projects simultaneously due to market trends, which results in a crowding out effect because of limited resources. R&D engineers become overloaded and scheduling of product development is delayed resulting in timing misses and lost sales leads. The company in this case study (Company A), often opens up many projects simultaneously in order to respond to market needs quickly. The engineers are overloaded and, of course, the schedule is delayed. In order to identify problems, Company A began using Dr. Goldratt's Thinking Processes (TP) during new product development (NPD). When the analysis phase of TP was completed, Company A's core problem was identified as "the quantity of kick-off projects." Consequently, new rules and conditions and procedures were proposed for the opening, suspending, stopping, and closing of projects. Finally, the "Future Reality Tree" ensured that the proposed rules, conditions and procedures were set up as an available solution approved for practical application by executives. After a one-year trial run, the results showed that the Project Duration Rate was reduced by 53%, the Project Closed Rate was increased by 140% and the Project on Time Rate was increased from 10% to 68%. The above results give significant evidence of the benefits of the proposed methodology.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

Performance Index Analysis of Schedule Introducing EVMS (EVMS를 도입한 공정의 성과지수 분석)

  • Kim Young;Lee Young-Dae;Kim Sung-Hwan;Kim Jung-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.456-459
    • /
    • 2002
  • It is lately issued studies on EVMS(Earned Value Management System) throughout construction industry, which is management system integrating cost and schedule effectively. So identifying importance and circumstance of introducing EVMS, CPI(Cost Performance Index) and SPI(Schedule Performance Index), which are critical components on schedule introducing EVMS, calculate and it intends to analyze the trend and problem of cost and time throughout project management, applying various statistical data analysis method.

  • PDF