• 제목/요약/키워드: Project Progress

검색결과 691건 처리시간 0.025초

A Study on the Reasonable Service Charges for Incheon North Port(berth 3) under the Private Investment Project

  • Park, Jin-Hee
    • 한국항해항만학회지
    • /
    • 제28권7호
    • /
    • pp.601-608
    • /
    • 2004
  • Recently, port development has been actively in progress through a private investment project. Incheon North Port functions as an auxiliary port for Incheon Port to solve its chronic demurral and freight congestion and to treat materials such as wood, iron material, feed materials. Service charges is one of important factors in the port choice to treat general goods. In general, service charges can be calculated by two methods such as cost accounting method and market price method. This study will review the characteristics of the Incheon North Port (berth 3), which is under the progress of the private investment project and estimate the reasonable service charges for general goods on the basis of market price. This will help a concessionaire to maximize the operation efficiency.

건설사업관리자의 역량기반 경력관리체계 구축 방안 (Competency-Based Career Management System Plan for Construction Manager)

  • 정서영;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

내역물량 측정에 의한 건설공사진도율 산정시스템 (Construction Progress Measurement System by tracking the Work-done Performance)

  • 최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.137-145
    • /
    • 2003
  • 건설공사관리체계는 실적자료를 바탕으로 운영되어야 하며, 공사실적을 정확하게 파악하기 위해서는 합리적인 건설공사진도 율 측정기준 및 그에 따른 진도 율 산정방법이 필요하다. 본 연구에서는 건설공사관리체계 구축에 필수적인 건설공사진도율 산정시스템 개발 및 그 시스템의 합리적인 운용 방안을 제시하였다. 그 방법으로서 분할된 단위작업들은 공사 진행에 따라 집행된 내역물량을 기준으로, 상위레벨의 작업범위에 대하여는 실행기성(earned value)을 바탕으로 건설공사의 진도 율을 산정 할 수 있는 시스템(construction progress measurement system; CPMS)을 제시하였다 일반 PC의 Window환경에서 제공되는 프로그래밍 인터페이스(interface) 기능인 ODBC(Open DataBase Connectivity)는 상이한 프로그램간의 데이터 교환을 통해 정보공유를 가능케 하고 있다 본 연구에서 제시하는 건설공사진도 율 산정 시스템은 ODBC를 통해, 상용 일정관리프로그램을 활용해서 생성된 데이터를 그대로 이용하고, 시스템 내에서 생성된 데이터는 일정관리프로그램에 갱신(update)된 정보로 제공된다. 제안된 건설공사진도 율 측정시스템의 실용화를 촉진시키기 위해서는 진도 율 측정에 의한 수치 값을 분석하여 향후 공사의 전망 등을 예측할 수 있어야 하는데 이에 대한 연구가 필요하다.

Social App Manufacturing 환경의 앱 개발 프로젝트에서 위험영향도 측정 모델 (A Measuring Model of Risk Impact on The App Development Project in The Social App Manufacturing Environment)

  • 백정희;임영환
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제3권9호
    • /
    • pp.335-340
    • /
    • 2014
  • Crowd Sourcing 기반의 Social App Manufacturing 환경에서는 소규모 앱 개발 프로젝트를 익명의 가상팀에 의해 시공간의 제약이 없이 수행하며 이를 위해 앱 개발 관리를 위한 자동화된 방법을 필요로 한다. Social App Manufacturing의 특징인 익명성을 갖는 가상팀은 프로젝트 진행 상황에 대한 가시성의 저하와 프로젝트 완료 여부의 불확실성을 증가시키는 핵심 요인이다. 본 연구에서는 Social App Manufacturing 환경하의 프로젝트 관리 방법의 하나로 개발 지연이 프로젝트에 주는 위험 영향을 정량적으로 측정할 수 있는 위험영향도 측정 모델을 제안한다. 제시한 측정 모델은 작업일정 지연에 따른 위험 영향 유형과 위험영향도 특성함수를 정의하고 진행 성과에 따른 프로젝트 위험영향도 측정식을 제안한다. Social App Manufacturing 환경에서 수행하는 프로젝트 관리에 이 모델을 활용하여 진행 상황에 대한 가시성을 확보하고 일정 지연으로 실패 위험이 발생하는 프로젝트를 식별하고 미리 대처할 수 있도록 한다.

국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석 (The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes)

  • 손권중;유왕진;이철규
    • 기술혁신연구
    • /
    • 제16권1호
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델 (Maturity model considering the interrelation between software project management areas)

  • 전순천
    • 한국항행학회논문지
    • /
    • 제15권5호
    • /
    • pp.823-832
    • /
    • 2011
  • 최근 공공기관 및 금융권에서는 경쟁력 향상을 위한 정보시스템의 통합으로 프로젝트 규모가 대형화되고 있으며, 프로젝트 수도 날로 증가하고 있어 정보시스템 프로젝트 관리를 위한 적절한 방안이 필요하다. 프로젝트 관리, 성공요인 및 실패요인에 대한 연구는 많이 수행되었으나, 프로젝트 관리 영역 간에 미치는 영향에 대하여 체계적인 연구가 미흡하였다. 본 연구는 선행 연구와 발주자, 개발 PM과 정보시스템 구축 전문가들인 정보처리기술사를 대상으로 설문 및 인터뷰를 통하여 범위, 일정, 품질, 인력, 위험 프로젝트 관리영역으로 도출하였다. 그리고 도출된 각 관리영역들에 대하여 상호 미치는 영향도 및 관리영역간의 상대적인 중요도의 분석하였고, 관리영역의 진행 상태를 계획, 실행, 완료 단계로 구분하고, 각 진행단계의 수행상태를 평가하는 틀을 제시하였다.

Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

주민참여에 의한 문화·역사 마을가꾸기의 현황과 과제 -충주 목계 문화·역사마을을 중심으로 - (State and Subject of the 'Recreating Cultural and Traditional Village' by the Inhabitants Participation - Focused on the Chungju Mokge Village -)

  • 김승근
    • 한국농촌건축학회논문집
    • /
    • 제10권3호
    • /
    • pp.43-50
    • /
    • 2008
  • This research is arranged that process and progress facts of 'recreating cultural and traditional village' by the inhabitants participation that in the process during devised a planning of Chungju Mokge village the beginning in 2007. Also it is an investigation that process 'recreating cultural and traditional village' by the themselves through consideration and volition of inhabitants since the beginning stage to devised planning. The result of study are following; First, the inhabitants training inspired knowledge for this project and opened the eyes that themselves can sea it. According to it be foundation that inhabitants to bring their interest and participation of project in progress process. Second, The project were able to maintain transparency of public finance that by common and open of all cooperation process of inhabitants, administration supporter and specialist. And this is an important role about bring positive participation of inhabitants. Finally, the project 'recreating cultural and traditional village' promotion with support of 'Ministry of Culture, Sports and tourism' however this project existing the limits of the budget supporting. The limits are bigger than other rural projects.

  • PDF

Progress in R&D of coated conductor in M-PACC project

  • Izumi, T.;Ibi, A.;Nakaoka, K.;Taneda, T.;Yoshida, T.;Takagi, Y.;Nakamura, T.;Machi, T.;Katayama, K.;Sakai, N.;Yoshizumi, M.;Koizumi, T.;Kimura, K.;Kato, T.;Kiss, T.;Shiohara, Y.
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제16권2호
    • /
    • pp.1-6
    • /
    • 2014
  • The five-year national project in Japan for R&D of coated conductors and applications, named as the Materials and Power Applications of Coated Conductors (M-PACC) project, was finished at the end of FY2013. The project consists of four sub-themes as cable, transformer, SMES and coated conductors. In the theme of coated conductors, the fabrication process had been developed to satisfy the requirements from the applications such as in-field $I_c$ performance, low AC loss in the long tapes etc. Through the project, the remarkable progress was achieved as follows; a high in-field minimum $I_c$ value over 54A/cm-width under 3T at 77K was realized in a 200m long EuBCO tape with artificial pinning centers of $BaHfO_3$ by the pulsed laser deposition (PLD) technique on the IBAD template. On the other hand, the AC loss reduction was confirmed in the tapes fabricated by both PLD and the metal organic deposition (MOD) techniques by scribing 100m tapes into 10-filamments. Additionally, the mechanism of the delamination phenomenon was systematically investigated and the strength was improved by eliminating the origins of the weak points in the films. Through the development, all targeted goals were accomplished and the several results were appreciated as a world champion data.