• 제목/요약/키워드: Project Portfolio

검색결과 83건 처리시간 0.05초

국방정보화기본계획 성과 분석 및 평가 (Performance Analysis and Evaluation on the Defense Information Technology Master Plan)

  • 김수진;이승진;박태현;윤웅직;심승배
    • 한국IT서비스학회지
    • /
    • 제20권1호
    • /
    • pp.11-27
    • /
    • 2021
  • The defense IT master plan is the plan for promoting defense informatization and is established by the Ministry of National Defense every five years. In addition, an implementation plan has been established in accordance with the master plan every year to promote the informatization project. However, since there is no systematic methodology to check and analyze the master plan comprehensively, it is difficult to judge whether the goals suggested in the master plan are achieved, and continuous monitoring of the project is limited. This study proposes a concept and framework for defense IT investment management and proposes a methodology for examining and analyzing the progress of the defense IT plan by referring to the U.S. Department of Defense's IT Plan and the performance management structure of the national IT master plan. As a methodology for managing defense IT investment, we propose an IT investment management code system from the perspective of an IT portfolio and verify its applicability through case studies. The results of this study are expected to improve the defense IT performance management system and improve the efficiency and effectiveness of the defense IT project.

Enhancing Writing Skills Through Portfolios

  • Rafik-Galea, Shameem
    • 영어어문교육
    • /
    • 제9권2호
    • /
    • pp.17-33
    • /
    • 2003
  • College going students who are non-native speakers of English enrolled in English language programmes are not acquiring the needed academic writing skills. Many of these students do not have positive attitudes towards writing, thus forcing language instructors to look for ways of motivating students to write in order to improve writing skills. This action research project investigates the use of portfolio writing to improve writing ability among pre-university students. Research on the use of portfolio writing suggests that it is a useful way for developing interest in writing and for developing effective writing skills over a period of time. Portfolios support the best thinking in composition pedagogy in that it encourages process writing. Although the portfolio is considered a writing product, as a whole it is evidence of the students writing process. An important feature in using portfolios is that students are able to focus on their writing without constantly worrying about grades. Instructors have noticed that students make greater improvement in their writing when their focus is shifted from punitive feedback through letter grades to constructive feedback in the form of suggestions for further revision. This paper describes the use of writing portfolios as an effective means of teaching writing. The findings revealed that writing portfolios helped develop confidence in writing and decreased anxiety towards writing. (217 words)

  • PDF

미용기기 분야 IP R&D 전략을 위한 특허 포트폴리오 분석 (Analysis of Patent Portfolio for Intellectual Property R&D Strategy of Beauty Instruments)

  • 고창인;이영석
    • 한국정보전자통신기술학회논문지
    • /
    • 제10권1호
    • /
    • pp.117-124
    • /
    • 2017
  • 본 논문에서는 미용기기 분야에 대한 특허 동향 분석을 통해 주요 경쟁자별 기술경쟁력 등의 분석을 실시하고, 지식재산권 중심의 기술 동향 분석 등을 바탕으로 과제기술의 특허 포트폴리오 및 특허 확보 전략을 도출하였다. 전략적인 IP(Intellectual Property) 기반 연구개발 계획 수립에 활용할 수 있도록 특허 포트폴리오를 분석하여 특허 장벽 및 공백분야를 제시함으로써, 연구개발의 방향을 설정하기 위한 기초정보로 활용하여 중복연구를 방지하고 연구개발과제 수행의 타당성에 대한 객관적인 특허정보를 제공하고자 한다.

e-포트폴리오의 구성에 관한 연구-IT기업 디자이너 포트폴리오를 중심으로 (The Elements of E-Portfolio - Focused on the Portfolio of IT Company Designers)

  • 박민경;장선희
    • 한국콘텐츠학회논문지
    • /
    • 제19권6호
    • /
    • pp.204-213
    • /
    • 2019
  • 본 연구는 디자인전공 학생들이 취업을 위한 포트폴리오를 만들 때 더 효과적으로 포트폴리오 구성을 할 수 있도록 IT 기업 인턴들의 e-포트폴리오를 대상으로 e-포트폴리오가 기존 포트폴리오와 다른 구성적 특징은 무엇인지, IT 기업별로 포트폴리오 구성에 있어 어떤 차이가 있는지를 살펴보았다. 이를 위해 첫 번째로 e-포트폴리오의 공통적인 구성 항목을 조사하였고, 그 결과 e-포트폴리오는 프로젝트 개요, 디자인 프로세스, 더보기의 세 가지 항목으로 구성되었음을 알 수 있었다. 그리고 이 세 가지 항목 중 두 번째 항목인 디자인 프로세스는 1단계 조사와 분석, 2단계 전략 수립, 3단계 프로토타이핑과 최종디자인, 4단계 발표, 평가, 개선의 4단계로 정리할 수 있었다. 두 번째로 e-포트폴리오에 소개된 모든 디자인 방법들을 키워드로 요약하고 그 키워드들을 앞서 3개의 구성 항목과 4단계의 디자인 프로세스를 기준으로 분류하였다. 마지막으로 e-포트폴리오에 소개된 각 항목과 단계에 해당하는 키워드들의 개수를 세어 포트폴리오 전체에서 차지하는 비중을 파악하였다. 이를 통해 IT 기업에 따라 그리고 인턴들의 전공에 따라 e-포트폴리오의 구성 항목과 디자인 단계를 다루는 비중이 다르다는 것을 확인하였는데, 특히 IT 기업 인턴들의 포트폴리오에는 전략수립 단계가 가장 많이 다루어졌고, 관련 링크를 연결하는 '연결성' 특성이 적극적으로 활용되었음을 알 수 있었다.

이공계 대학 학부생을 위한 MTP(Muti-grade Tutoring Project) e포트폴리오 평가 모형 개발 (A development of MTP e-portfolio evaluation model for the college students of science and engineering school)

  • 최영미;주문원;한영신
    • 정보교육학회논문지
    • /
    • 제10권3호
    • /
    • pp.413-422
    • /
    • 2006
  • MTP(Muti-grade Tutoring Project)는 공학계열 학생들이 완성도 높은 프로젝트 수행에 필요한 팀워크와 전공기술을 함양하기 위하여 개발된 이공계 교과과목 개발 모델이다. 학습자는 3년간 1,2,3학년으로 구성된 1년 단위 다학년 팀프로젝트에서 튜터와 튜티의 역할을 수행한다. 이러한 과정을 통하여 자신의 비젼을 스스로 설정하고, 선후배간의 커뮤니케이션 채널을 활성화함으로써 인적 네트워크를 형성하여 졸업 후 취업에 지원을 받을 수 있으며 현장에 적응도를 높일 수 있고, 졸업학년도에는 보다 완성도 높은 졸업 프로젝트를 수행할 수 있다. 본 연구에서는 이러한 MTP 교과목을 통하여 경험하는 학습 성장과정을 스스로 관리 개발할 수 있는 MTP e포트폴리오 평가 모형을 제시하였다. 특히 참여자, 학습상의 변화, 과정의 3 차원으로 기술한 평가절차 모형구조는 다학년 학생이 수행하는 프로젝트에 협동교수가 보조하는 과정에서 수업이 역동적이고 활성화 되어질 수 있는 도구로써 활용될 것이다.

  • PDF

프로젝트 선정 및 프로젝트 포트폴리오 관리에 관한 고찰 (A Review of Project Selection and Project Portfolio Management)

  • 김민철;하태현
    • 디지털융복합연구
    • /
    • 제6권3호
    • /
    • pp.85-91
    • /
    • 2008
  • 본 연구는 프로젝트 선정 및 포트폴리오 관리에 관한 고찰이다. 첫 번째 부분은 프로젝트 선정에 관한 세 가지 방법 (AHP, 경제학적 방법, Microsoft's Enterprise 프로젝트 관리 방법)의 장 단점에 대한 간단한 견해를 제시하였다. 두 번째 부분은 프로젝트 포트폴리오 관리에 관한 기법 등을 소개하였고, 6개의 질문을 통해 프로젝트 포트폴리오 관리 시스템에 대해 어떻게 조직화하고 활용할 것인가를 고찰하였다.

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

데이터기반 의사결정을 위한 정책 및 사업 속성 분류체계 개발 연구 (A Study on Development of Policy Attributes Taxonomy for Data-based Decision Making)

  • 김사랑
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제29권3호
    • /
    • pp.1-34
    • /
    • 2020
  • Purpose Due to the complexity of policy environment in modern society, it is accepted as common basics of policy design to mix up a variety of policy instruments aiming the multiple functions. However, under the current situation of written-down policy specification, not only the public officers but also the policy researchers cannot easily grasp such frameworks as policy portfolio. The purpose of this study is to develop "Policy Attributes Taxonomy" identifying and classifying the public programs to help making decisions for allocative efficiency with effectiveness-based information. Design/methodology/approach To figure out the main scheme and classification criteria of Policy Attributes Taxonomy which represents characteristics of public policies, previous theories and researches on policy components were explored. In addition, to test taxonomic feasibility of certain information system, a set of "Feasibility Standards" was drawn from "requirements for well-organized criteria" of eminent taxonomy literatures. Finally, current government classification system in the area of social service was tested to visualize the application of Taxonomy and Standards. Findings Program Taxonomy Schemes were set including "policy goals", "policy targets", "policy tools", "logical relation" and "delivery system". Each program and project could be condensed into these attributes, making their design more easily distinguishable. Policy portfolio could be readily made out by extracting certain characteristics according to this scheme. Moreover, this taxonomy could be used for rearrangement of present "Program Budget System" or estimation of "Basic Income".

ASP Outsourcing 위험의 효율적인 통제를 위한 실물옵션 적용 가능성에 대한 연구 (An Empirical Study on the Control Mechanism of ASP Outsourcing Risks using Real Option Approach)

  • 남승현;양희동
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 2008년도 추계 공동 국제학술대회
    • /
    • pp.365-384
    • /
    • 2008
  • Many studies on ASP outsourcing area have focused on the Critical Success Factors(CSFs) of ASP outsourcing projects or on the service quality of ASP Service. But these studies have limitations to explain how to succeed in doing ASP outsourcing project. The objective of this research is to overcome this limitation by using the concept of "IT Risk" in Outsourcing. The effective control of the risks-caused during the IS outsourcing process-gives (ASP service using) users a powerful tool to minimize the risks and thus maximizes the possibility of ASP outsourcing project success. In order to perform this objective, this research set up the research model which is composed of three concepts. The three concepts are 1. Undesirable Outcomes(:UO) as IT outsourcing Risks, 2. The Source of Risks(:SOR) influencing the UO, and 3. the intention to get/execute Real Option Portfolio to control the risk level of SORs and UOs. This research has some important and interesting implications on the ASP outsourcing area. First, this research classifies the risk factors as three concepts and finds the interactions among them. Second, Using Real Option portfolio can control the risks effectively occurred during outsourcing projects. Third, Vendors(ASP service providers) can offer users IN TIME the options which can minimize the occurrence of risks.

  • PDF

신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스 (Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard)

  • 양현주;김종협;한상원;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.44-45
    • /
    • 2014
  • Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

  • PDF