• Title/Summary/Keyword: Project Planning Phase

Search Result 234, Processing Time 0.035 seconds

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

A Basic Study on the BIM Service Based SLA for Setting the Application Level of BIM in the Procurement Phase (발주단계에서 BIM의 적용수준 설정을 위한 SLA 기반의 BIM 서비스에 관한 기초연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.251-252
    • /
    • 2016
  • Recently policy and clouding system to mandate the introduction of BIM in construction industry, various sensors technology, BIM in ICT technology and fusion, such as 3D scanning and printing technology has been further activated. However, the expression level of diversification associated with it, plan within one of the BIM project, design, engineering, it is difficult to have a different application has been consistent for each field, such as construction. Thus fell the efficiency of BIM apply, it is difficult to determine the appropriate level of BIM in the business early stage in order destination of position. In this study, in order to solve this problem, by utilizing SLA used in the IT field, it attempts to explore scheme which can be evaluated targeted level of BIM suitable for business in the planning phase.

  • PDF

A Study on the Decision Making Models for Evaluating the Priorities in the Army Facility Enterprise (군 시설사업 우선순위선정을 위한 의사결정모형에 관한 연구)

  • 정성환;이상헌
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.2
    • /
    • pp.37-55
    • /
    • 2001
  • The main purpose of this study is to review the current system and to develop a decision support system for evaluating the priorities among those possible alternatives in the army facility enterprise. This paper also provides an information system which can be effectively applied to various criteria and stages in decision making process such as Planning and Programming phases in PPBEES. The model base of decision support systems uses the concepts of the analytic hierarchy process along with the supplementary techniques such as TOPSIS and 0-1 integer programming. Both AHP and TOPSIS are used scoring approaches in the Planning phase and IP is induced at the Programming phase to give GO/NO-GO solution for each project. We use Expert Choice, Excel and LINDO s/w's to implement a prototyped model. The proposed methodology in this paper enables the decision makers to evaluate the priority based on quantitative and qualitative data in a systematic way.

  • PDF

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

Introduction of FPSO DPM System and Design Consideration Factor at the Early Design Phase (FPSO DPM 시스템 소개 및 초기 설계 시 고려사항)

  • Lee, Choong Yeol;Jeon, Kwang-Heon;Lee, Hee Sung;Kwon, Youngrag
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2013.12a
    • /
    • pp.97-102
    • /
    • 2013
  • As the offshore oil and gas upstream industry moves into deeper water, the FPSOs are the cost-effective solution. In the harsh environment such as in North Sea, station keeping and heading control capability obtained through the DP and Position Mooring (DPM) system of FPSOs play important roles to keep the safety. This paper introduces the concept, function and sub-system of the DPM systems which has been applied for the North Sea FPSOs since the late 1980s. The requirements and guidelines of some internationally recognized standards are also described, which are important to build the design basis at the early phases of the project.

  • PDF

The Effect of Requirement Creep on the Fixed-Cost Project Planning (요구사항 변경이 확정가 프로젝트 계획에 미치는 영향)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.14D no.6
    • /
    • pp.641-648
    • /
    • 2007
  • To develop a dynamic system project in which the requirement changes frequently, it's impossible to finish the development within a fixed-cost due to additional budget occurring in need of requirement creep. To manage the successive project within a fixed-cost, it's better to manage the ratio of necessarily changed size of project and necessary optional requirement. According to Bhagwat, it is occurred in the construction phase. Also, he stated that the software development cost, construction phase cost and requirement cost are equal and it was wrong explanation in the ratio of requirement creep and optional requirement. This paper assumes the requirement creep to be happening in the phase of elaboration and construction. In addition, some differences were supposed to happen between software development cost, construction phase cost, and requirement creep cost. As a result, the reality was preferred rather than the ratio of optional requirement and the ratio of requirement creep.