• Title/Summary/Keyword: Project Planning Phase

Search Result 233, Processing Time 0.024 seconds

An Analysis of Locational Factors to Affect Residential Improvement Projects in Busan Metropolitan City (부산의 주거정비사업 추진에 미치는 영향요인 분석)

  • Kim, Jung-Don;Oh, Se-Kyung;Lim, Jae-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.125-132
    • /
    • 2012
  • Busan metropolitan city faced with very low completion rate of residential environment improvement projects. Main reason is to designate proposed residential environment improvement areas without careful analysis of the possibilities of the improvement project completion. This study aims to clarify and analyze the phase characteristics of residential environment improvement process by using 12 variables representing 5 locational characteristics such as place factors, topological factors, size factors, location condition factors and regulation factors. From results of the analysis, this study finds that business floor area ratio, improvement type and site size affect significantly the completion rate of residential redevelopment projects. However, business floor ratio, improvement type, width of frontage road and slope are significant variables to affect the completion rate of residential rebuilding projects.

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

A Study on the Design Methodology of SE-Based Military Force Construction in Defense Acquisition Process (Focusing on Influencing Factor Priorities) (국방획득 과정에서 SE개념 기반의 군사력건설 설계 방법론 연구(영향요인 우선순위 결정 중심으로))

  • Kim, Heung Bin;Seo, Je Hyeon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.87-97
    • /
    • 2019
  • This paper focuses on the SE concept based on the weapon system design, which is the lack of systematic research at the stage of military requirements creation prior to acquisition management phase. Influence factors were derived by focusing on the core issues that were at issue in the process of requirements analysis, requirements verification, and business management in recent years. Next, the impact factor was prioritized using the AHP technique and then alternatives were suggested. As a result, through the hierarchical analysis process, 'substantiation of necessity' was found to be the most important factor in the large category, and 'satisfaction of the operating concept' was the most important factor. In addition, as a result of calculating the final weight for each nutritional factor, it was analyzed in order of 'enemy threat response ability', 'response to operational environment change', 'performance considering operational environment', and 'guaranteed power generation'. The results of this analysis suggest which factors should be focused on, firstly, based on the concept of SE by the military and JCS.

An Comparative Analysis of Alternatives at Implementing Next Generation System for the Financial Business (금융 차세대시스템 구축방식의 비교 분석)

  • Mun, Hui-Jin;Hong, Jeong-Sik
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.455-459
    • /
    • 2008
  • This study defines the Next Generation System(NGS) built by domestic financial businesses and classifies their architecture into two typical types according to the duration of the project and the relative cost of IT investment in the short term: the Big Bang approach and the Phase approach. Herein, we study the two approaches as alternatives in developing the Next Generation System, and derive the factors that are to be considered in the evaluation of the two alternatives for financial businesses. The set of standards for the choice between the two models are grouped into categories that constitute performance evaluation for IT - Cost, Performance and Risk. We drill down further into each category to second and third subordinate levels to derive detailed selection criteria. Based on the criteria drawn from the study, we conduct a survey with information system planners, IT managers and specialists at financial companies who are currently planning, developing or have completed a Next Generation System. Survey results are analyzed using the AHP methodology to compare and understand the different approach in the implementation of NGS for financial business.

  • PDF

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

Using Survey information of BIM-applied Project - Construction Industry Specialist Interview - (스마트 건설에서 디지털 측량정보의 활용)

  • Jo, Jae-Hee;Choi, Young-Woo;Lee, Ji-Woo;Kim, Hwan-Yong
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.33-42
    • /
    • 2020
  • Recently, in the smart construction field, it is possible to construct spatial information of 3D data base quickly and accurately using drones, LiDARs and ARs,. Most public ordering institutions are pushing for the efficiency of construction work through establishing and announcing road maps and guidelines for utilizing BIM for the entire life cycle of construction. However, in most policies, the impact of 3D data on the entire life cycle is limited by only partially constructing and utilizing 3D data or by being mentioned. In addition, many public institutions, construction companies and planning companies did not actively utilize survey information during the actual construction phase, despite the possibility of using 3D survey information. In order to confirm the utilization of survey information, a total of eight private construction companies were selected and interviewed by experts. The analysis shows that most of companies lack the performance of drone measurements or have a lack of awareness of advantages, and among them, construction companies are relatively active. Based on these opinions, this study examined the usability of surveying information and examined measures to expand the utilization of survey information in legal and institutional aspects, technology development aspects and industrial development.

Forecasting tunnel path geology using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ali, Hunar Farid Hama;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.359-374
    • /
    • 2022
  • Geology conditions are crucial in decision-making during the planning and design phase of a tunnel project. Estimation of the geology conditions of road tunnels is subject to significant uncertainties. In this work, the effectiveness of a novel regression method in estimating geological or geotechnical parameters of road tunnel projects was explored. This method, called Gaussian process regression (GPR), formulates the learning of the regressor within a Bayesian framework. The GPR model was trained with data of old tunnel projects. To verify its feasibility, the GPR technique was applied to a road tunnel to predict the state of three geological/geomechanical parameters of Rock Mass Rating (RMR), Rock Structure Rating (RSR) and Q-value. Finally, in order to validate the GPR approach, the forecasted results were compared to the field-observed results. From this comparison, it was concluded that, the GPR is presented very good predictions. The R-squared values between the predicted results of the GPR vs. field-observed results for the RMR, RSR and Q-value were obtained equal to 0.8581, 0.8148 and 0.8788, respectively.

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.1
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Testing the Andrews Framework of Strategy Formulation and Implementation: Case Study of the University of Cape Coast Digital Library in Ghana

  • Adzobu, Nesba Yaa Anima
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.4 no.2
    • /
    • pp.49-65
    • /
    • 2014
  • This paper investigates how strategy formulation and implementation processes used by the University of Cape Coast (UCC) in building its digital collections compare with the Andrew's strategic formulation and implementation theoretical framework. Theory-testing case study methodology was used. The data collection instruments were the key informant interview technique and document reviews. During the formulation phase, two aspects (resources and aspirations of senior management) were emergent. During the implementation phase, five aspects (achieving results, processes and behaviour, standards, motivation, personal) were emergent. All other elements of building the UCC digital collections were planned during both the formulation and implementation phases. Although the emphasis on students and learning is laudable and apt, there seems to be lack of focus on research support beyond digital collection building, despite the fact that research excellence is one of the UCC's key priorities. Opportunities exist for improving feedback mechanisms between the users, digital library staff and the university management; and inclusion of social media tools in the digital library project. Since only the experience of a single institution of higher learning is considered, it cannot be definitively stated that strategy formulation and implementation will be similar in every institutional context. However, the results provide a basis for academic digital libraries to draw lessons from this case. In African public universities, there is little earlier research on strategy formulation and implementation in digital library management. Strategy formulation and implementation is a critical issue for higher education academic libraries especially in developing countries like Ghana, due to limited financial resources and the rapid change in the information environment during the last several decades.