A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

A Profitability Forecasting Model available in Planning Stage of Housing Redevelopment Project (주택재개발사업 기획단계에서 이용 가능한 수익성 예측 모델)

  • Ahn, Kyung-Hwan;Park, Jong-Soon;Lee, Jong-Sik;Kwon, Dae-Jung;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.63-70
    • /
    • 2013
  • A judgment on the redevelopment projects' predicted profitability is an essential decision-making element for the success of the redevelopment projects. It is necessary to review the literature on profitability of redevelopment project and draw risk factors that could affect profitability through the risk analysis based on surveys. It is also necessary to judge profitability prediction toward the business value of the redevelopment project in the planning phase according to the risk analysis results which can affect the profitability prediction. In order to prevent the growing difficulties in executing the projects, a profitability prediction model is proposed using the method of management and disposal based on a proportional calculation that can estimate the share of expenses in order to judge profitability in the planning phase. With the improvement of profitability prediction models, it is possible to appropriately judge profitability in the planning phase in order to allow the prevention of suspension, reduction of project term, reduction of cost, and making of rational decisions.

Study on the Status Change in Rural Landscape Planning and Landscape Project in the General Agriculture Fishing Village Development Project (일반농산어촌개발사업에 있어 농촌경관계획과 경관사업부문의 위상변화에 관한 연구)

  • Lee, Su Hyun;Cho, Tong Buhm
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.4
    • /
    • pp.119-128
    • /
    • 2019
  • Although the General Agricultural Fishing Village Development Project had a significant impact on the landscape formation and management in rural area, the rural landscape planning and project sectors was not stable by fluctuation variables. On the basic understanding the institutional status of rural landscape planning, some conclusions could be discussed as follows through the analysis of quantitative and qualitative changes and the background factors. The rural landscape plan lacked its own legal and institutional foundations, and the landscape project of the General Agricultural Fishing Village Development Project was mainly focused on the environment-improving H/W project for expanding the basic living infrastructures. In order to reflect the characteristics of the region and become independent rural landscape management, it is necessary to change the contents so that the S/W business such as the deepening landscape awareness and empowerment linked with improving the physical landscape. To this end, it is necessary to establish a foundation for the rural landscape planning system to have its own status, and it seems to seek to supplement with what is included S/W contents reflecting the context of higher level landscape planning. The landscape sector of the General Agricultural Fishing Village Development Project proved to be in the process of shrinking in both quantity and quality, despite the temporary expansion in the past. In addition, considering the distortion of the contents of landscape projects in rural sites, it seems that the rural landscape-related public project are now in a position to seek a new phase change beyond quantitative expansion. In particular, along with institutional improvements to secure the independent status of rural landscape planning that contributes to village community regeneration and social sustainability through the role of intermediary support organizations in landscape management activities. Through the integrated landscape plan, which is established in advance and led by the residents in the early stages, there is a need to change the direction to enhance meaning of the landscape planning goes beyond the facility design or space improvement.

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

Prediction/Investment Cost Analysis for korea High-Speed Railway System (한국형 고속전철 시스템의 추정/투입비용 분석)

  • Lee, Tae-Hyeong;Park, Chun-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Deriving of Major Risk Factors for Planning Phase of u-City Project (U-City사업 계획단계에서의 핵심 리스크 요인 도출)

  • Kim, Ho-Ki;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.139-148
    • /
    • 2011
  • u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.