• 제목/요약/키워드: Project Phase

검색결과 1,152건 처리시간 0.024초

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구 (A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center)

  • 정재진;유병기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.32-39
    • /
    • 2003
  • 지방자치단체에서 공공공사 발주시 발주자는 사업추진에 대한 전문성 및 관리능력이 취약하며, 사업추진을 위한 전문조직을 갖추어 운영하는 것에 대한 부담과, 현행 책임감리 업무의 한계성에 대한 대안으로 건설사업관리(CM)용역의 발주를 선호하는 추세이다. 그러나 설계${\cdot}$시공일괄공사의 여건에서는 대형건설사업의 수행 및 CM적용 사례가 많지 않고, 일괄공사의 특성에 따른 문제 등으로 통상적으로 설계단계의 업무와 책임감리업무를 혼합한 형태로 CM업무가 수행되고 일어 전반적인 CM업무가 적용된다고 될 수 없다. 따라서 일괄공사에 적절하고 체계적인 CM방식이 정착되기 위하여는 앞으로도 많은 실험적 적용과 경험축적을 필요로 하고 있으며 이를 바탕으로 한 현실적인 적용방안의 모색이 요구되고 있다. 본 연구에서는 광진구민회관의 CM적용사례를 요약하여 실시설계관리, 설계${\cdot}$시공VE수행, Fast-Track적용, PMIS 운영 등에 대한 실무적용상의 문제점과 이에 대한 각각의 개선방향을 제시하고, 결론에서는 일괄공사에서 효율적으로 CM임무를 수행할 수 있는 방안을 제시하였다.

  • PDF

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • 김현정;이진국
    • 한국실내디자인학회논문집
    • /
    • 제24권5호
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안 (A Process Model for Project Management of Design-Build System and Method for Constitution of Database)

  • 김의석;김창교;이경국;박상준;손보식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.242-245
    • /
    • 2004
  • 공공 건설사업 발주 정책의 변화 및 대형화, 복잡화되고 있는 건축 프로젝트의 특성에 따라 향후 건설시장은 디자인 빌드 방식의 건설사업이 더욱 증가할 것으로 예상된다. 그러나 디자인 빌드의 증가와 더불어 운영관리 측면에서의 문제점이 나타나고 있다. 디자인 빌드 방식은 일괄사업자가 설계와 시공에 대한 책임을 전담하게 되므로 많은 리스크 요인이 존재하며, 기본설계에서 실시설계를 거쳐 시공단계에 이르는 업무 프로세스가 명확히 규명되어 있지 않아 사업의 진행에 따른 사업 수행자의 일관되고 체계적인 관리가 어려운 실정이다. 이에 본 연구에서는 디자인 빌드 프로젝트의 효과적인 수행을 위한 프로세스 모델을 개발하고, 관련지식의 체계적인 축적 및 활용을 위한 데이터베이스의 구축방안을 제시하고자 한다.

  • PDF

소프트웨어 개발 세부단계 노력 추정 모델 (A Model for Software Effort Estimation in the Development Subcycles)

  • 박석규;박영목;박재흥
    • 한국컴퓨터산업학회논문지
    • /
    • 제2권6호
    • /
    • pp.859-866
    • /
    • 2001
  • 성공적인 프로젝트 계획은 활용 가능한 일정과 더불어 프로젝트를 완수하는데 요구되는 노력을 얼마나 정확히 추정하느냐에 달려있다. 새로운 또는 보다 나은 모델 개발에 많은 연구가 이루어졌지만 현존하는 소프트웨어 노력 추정 모델들은 개발 전순기에 대해 투입되는 총 개발노력과 단위시간당 소요되는 인력인 노력 함수만을 제공한다. 또한, Putnam은 세부단계별로 일정한 개발노력 투입 비율을 제시하였다. 그러나 소프트웨어의 규모, 복잡도와 운영환경의 영향으로 인해 프로젝트 별로 투입되는 총 개발노력의 규모에 차이가 발생하며, 그 결과, 개발 세부단계별로 투입되는 노력의 규모도 프로젝트마다 차이가 발생한다. 본 논문은 총 개발노력 변동에 따른 소프트웨어의 명세화, 구축과 시험단계에 투입될 개발노력을 추정하는 선형과 다항식 모델을 제시하였다. 이 모델들은 128개의 다른 소프트웨어 프로젝트들로부터 유도되었다. 제안된 모델은 프로젝트의 일정과 노력 할당 관리에 실질적인 지침을 제공할 것이다.

  • PDF

Feasibility Evaluation of High-Tech New Product Development Projects Using Support Vector Machines

  • 신택수;노전표
    • 한국지능정보시스템학회:학술대회논문집
    • /
    • 한국지능정보시스템학회 2005년도 공동추계학술대회
    • /
    • pp.241-250
    • /
    • 2005
  • New product development (NPD) is defined as the transformation of a market opportunity and a set of assumptions about product technology into a product available for sale. Managers charged with project selection decisions in the NPD process, such as go/no-go choices and specific resource allocation decisions, are faced with a complicated problem. Therefore, the ability to develop new successful products has identifies as a major determinant in sustaining a firm's competitive advantage. The purpose of this study is to develop a new evaluation model for NPD project selection in the high -tech industry using support vector machines (SYM). The evaluation model is developed through two phases. In the first phase, binary (go/no-go) classification prediction model, i.e. SVM for high-tech NPD project selection is developed. In the second phase. using the predicted output value of SVM, feasibility grade is calculated for the final NPD project decision making. In this study, the feasibility grades are also divided as three level grades. We assume that the frequency of NPD project cases is symmetrically determined according to the feasibility grades and misclassification errors are partially minimized by the multiple grades. However, the horizon of grade level can be changed by firms' NPD strategy. Our proposed feasibility grade method is more reasonable in NPD decision problems by considering particularly risk factor of NPD in viewpoints of future NPD success probability. In our empirical study using Korean NPD cases, the SVM significantly outperformed ANN and logistic regression as benchmark models in hit ratio. And the feasibility grades generated from the predicted output value of SVM showed that they can offer a useful guideline for NPD project selection.

  • PDF