Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

Contingency and Management Reserves Estimation Method for Project Budget (프로젝트 예비비 편성 방법에 관한 연구)

  • Kwon, Hyukchun;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

A Research on the core PMO function and operation type for the IT project of financial industry in Korea (금융권 핵심 PMO 기능과 운영형태에 관한 연구)

  • Lee, Jae-Beom;Lee, Jae-Chul;Chang, Yun-Hi
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A PCM PERFORMANCE EVALUATION SYSTEM FOR DESIGN/BUILD PROJECTS

  • Wen-der Yu ;Yin-shung Hsin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.397-402
    • /
    • 2005
  • Professional Construction Management (PCM) services have become more and more popular in Taiwan in the past decade. However, disputes between PCM consultant and the client on the performance of PCM services are also increasing. The evaluation of PCM performance is a tough task due to the lack of "physical product", such as the drawings finished by the architect. This paper is intended to propose a PCM performance evaluation system (PPES) based on Balanced Scorecard (BSC). A case study of PCM consultancy for a real world design/build project is conducted to demonstrate the applicability of the proposed BSC framework