The Strategy for Interconnection Branch Line Construction used Optimization Program (최적화 기법을 적용한 효율적인 철도 연결선 구축 전략)

  • Kim, Yong-seok;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.853-858
    • /
    • 2019
  • One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

Application of the New Technology for an Efficient Cadastral Re-survey Project (지적재조사사업의 효율화를 위한 신 기술 적용 방안)

  • Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6196-6203
    • /
    • 2013
  • This study examined cadastral surveying technology regulated under the "Special Law for the cadastral surveying", and analyzed the related surveying methods currently used. Based on the analysis, this study suggested the efficient application plan future cadastral surveying projects. The new technologies analyzed were GNSS, GPS RTK, Network RTK, GPS Augmentation System, and the mobile and auto sighting TS. As a result of the analysis, this study suggests that if a receiving technology is possible for the integrated receiving of GPS/GLONASS/Galileo systems, both the accuracy of location determination could be enhanced and stable data could be obtained. The Network RTK technology may solve the constraint receiving factors of satellite information in the long term if a GPS Augmentation System is used. Finally, mobile and auto sighting TS technologies can reduce the personnel factors, but can be applied after the offset problem is overcome.

OPTIMISATION OF ASSET MANAGEMENT METHODOLOGY FOR A SMALL BRIDGE NETWORK

  • Jaeho Lee;Kamalarasa Sanmugarasa
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.597-602
    • /
    • 2011
  • A robust asset management methodology is essential for effective decision-making of maintenance, repair and rehabilitation of a bridge network. It can be achieved by a computer-based bridge management system (BMS). Successful BMS development requires a reliable bridge deterioration model, which is the most crucial component in a BMS, and an optimal management philosophy. The maintenance optimization methodology proposed in this paper is developed for a small bridge network with limited structural condition rating records. . The methodology is organized in three major components: (1) bridge health index (BHI); (2) maintenance and budget optimization; and (3) reliable Artificial Intelligence (AI) based bridge deterioration model. The outcomes of the paper will help to identify BMS implementation problems and to provide appropriate solutions for managing small bridge networks.

  • PDF

Experiments for utilizing GNSS in a shore area Sensor Network

  • Hojo, Harumasa;Yasuda, Akio;Fan, Chunming;Yoshida, Masashi;Koike, Yoshikazu;Minami, Masateru
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.2
    • /
    • pp.117-122
    • /
    • 2006
  • Modernized GNSS such as new GPS signals updated GLONASS and coming Galileo promises higher quality and higher reliability for users. Powerful technologies such as Internet, ubiquitous network technology and sensor network has been used to promote a safe and more secure lifestyle. This report describes experimental trials to combine these technologies namely GPS and Sensor Network into a high-performance system. GPS is used to enlarge the communication range, resolving the service area limitations, as a wider service area is required at shore areas compared to urban area. GPS position datum is also used as primary network routing information to get practical Sensor Network. Another application is the under water Sensor Network. Accurate GPS position and time are used to establish stable and high reliability underwater acoustic Sensor Network. This paper describes the background of the project 'Harbor area Marine Ubiquitous Sensor Network', preliminary consideration and testing. Radio and acoustic communication is the main focus of this preliminary experiment.

  • PDF

Analysis of alternative project for demonstration route construction of Urban Transit Magnetic Levitation System (도시형 자기부상철도 시범노선건설 대안설계의 분석)

  • Kim, Byoung-Seop;Lee, In-Yong;Kim, Si-Gon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.581-591
    • /
    • 2010
  • Korea Rail Network Authority ordered Urban Transit Magrev System on the alternative tender lines. The project was contained order with GS Construction and Yooshin Corporation as a result of competition as 5 consortium. Urban Transit Magrev System route was constructed in the whole Yeongjong-dong and Yongyu-dong, Jung-gu, Inchen. The main project is via transportation center in Inchen Int'l airport ~ Work complex ~ Water park ~ Yongyu-station and has Total continuation of 6.1kilometers, Station of 6 spot, Car base of a spot, go out line(a single line) of 380meters. Scale of construction is Major of Roadbed, Railroad, Building, Inspection and Repair facilities. The first Urban Transit Magrev System in Korea is a new symbol of Korea and has polished beauty and creative artistry based on functional perfection. It was designed in harmony with Inchen Int'l Airport improving the dignity of SOC design.

  • PDF

A Health and Safety Improvement Roadmap for the Construction Industry

  • Diugwu, Ikechukwu A.;Baba, Dorothy L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2014
  • Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

A Study on the deployment of IPv6 based VoIP trial service provided by LG Dacom (LG 데이콤의 차세대인터넷(IPv6) 기반 VoIP 시범서비스에 대한 연구)

  • Lee, Dong-Yeal;Kim, Hee-Dong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.163-166
    • /
    • 2007
  • This paper describes a IPv6 trial service provided by LG DACOM and discusses about the output of trial service. MIC has urged public organizations to introduce IPv6 technology into their network. As one of propelling policies, MIC and NIA launched some IPv6 trial project. LG DACOM, MIC's agent in doing IPv6 trial project, has selected three public organizations in order to deploy IPv6 based VoIP trial service. KMA, KISITI and MND gave out their different service requirements. In achieve this project we developed IPv6 supported voice IP phone, video IP phone, media gateway and IP-PBX. Furthermore, two KMA provincial offices adopted trial IP phone as working phone and replaced legacy PBX with IP-PBX. At the same time, public organizations introduced IPv6 technology into their local networks.

  • PDF

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • v.16 no.2
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.