• 제목/요약/키워드: Project Management Capability

검색결과 223건 처리시간 0.026초

전산지원 시스템공학을 응용한 경량전철 시스템 개발 (Application of Computer-Aided Systems Engineering to Light Rail Transit System Development)

  • 박중용;박영원;이중윤;안장근;목재균;이우동
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.435-435
    • /
    • 2000
  • Light Rail Transit (LRT) system is a complex and large system in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating effectively among all of the stakeholders. This paper shows not only the methodology and the results of computer-aided systems engineering including requirement management, functional analysis and architecting LRT system, but also propose a tool to help manage a project by linking WBS (Work Breakdown Structure), work organization and PBS (Product Breakdown Structure). The application of computer-aided tool RDD-100 provides the capability to model product design knowledge and decisions about important issues such as architecting the top-level system. The product design knowledge will be essential in integrating the following life-cycle phase activities over the life of the LRT system. Additionally, when a new generation train system is required, the reuse of the database can increase the system design productivity and effectiveness significantly.

  • PDF

지능형로봇 기술개발 현황 (State of R&D Projects for Intelligent Robots)

  • 박현섭;고경철;김홍석;이호길
    • 로봇학회논문지
    • /
    • 제2권2호
    • /
    • pp.191-195
    • /
    • 2007
  • Abstract MOCIE(Ministry of Commerce, Industry and Energy) handles 6 Projects for Intelligent Robot, whose budget is around 40 Million dollars per year. In this paper we have tried to analyze the state of robot technology of the projects. Each sub-projects has been divided according to the technological classification. Two major projects of Next Generation Growth Engine and 21C Frontier show different state each other. The former is focused on the product while the latter on the technology. Output of 21C Frontier should be linked to the Next Generation Growth Engine, otherwise, it will fail to advance. The project management handles only the quantitative performance such as business results, number of prototype, and number of patents and papers. Technological Capability is essential and it should be managed. This paper proposes efficient classification of robot technology and technology index.

  • PDF

공간데이터 구축공정 및 이력 관리시스템 개발 (A Management System for the Process and Metadata of Spatial Data Construction)

  • 최병길;조광희;이형수;조태인
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 추계학술발표회 논문집
    • /
    • pp.355-360
    • /
    • 2004
  • This study is aimed at developing the system to manage the process and metadata of spatial data construction. The process of spatial data construction is standardized by analyzing knowhow of major firms and the provisions of MOCT(Ministry of the Construction and Transportation), and by appling the development methodology of information system. The system from this study has the capability to manage efficiently the process and metadata of spatial data construction. The process is shown by using index map. Also, it is shown by using Gantt chart and PERT chat after developing the interface for MS Project. The metadata is generated from the process, and managed systematically.

  • PDF

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구 (A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate)

  • 이윤홍
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.90-102
    • /
    • 2018
  • 2000년 정부는 가계부채 증가와 미국 기준금리 인상을 대비하여 2017년부터 부동산규제를 강화하였고, 이로 인해 대형건설사 민간개발사업 수주확대는 위축될 것으로 예상된다. 해외플랜트 사업에서도 계속된 원가상승으로 부실이 이어지고 있어 대형건설사의 신용등급은 현 상태를 유지하기는 어려울 것으로 예상된다. 본 연구는 정부의 부동산정책과 국내외 적인 경제상황으로 앞으로 변화할 수 있는 문제점을 짚어보았다. 정부정책과 대내외적인 경제 환경 요소는 부동산정책, 기준금리, 부동산가격 상승률, 미분양을 연구하였고, 대형건설사 재무제표에서는 매출액, 시공능력, 민간개발사업 매출액, 영업이익, PF우발채무를 종합하여 외부 신용등급의 변화를 나타냈다. 본 연구는 실무 전문가 30명의 설문조사를 통해 위험요소가 대형건설사의 외부 신용등급에 미치는 영향을 분석하였다.

중국기업의 사내벤처 운영과정과 성공요인: 하이얼(Haier) 중심으로 (Operational Process and Success Factors of Corporate Venture in a Chinese Company: A Case Study of Haier)

  • 호우위로;김원경;허문구
    • 아태비즈니스연구
    • /
    • 제14권4호
    • /
    • pp.87-113
    • /
    • 2023
  • Purpose - Focusing on Haier, a successful corporate venture in China, we analyse the operating mechanism and success factors of corporate venture, and reveal the necessary factors for the successful implementation of corporate venture. Design/methodology/approach - This study is a single case study centred on Haier, a successful corporate venture in China. Findings - The operational process of Haier's corporate venture includes six key aspects: project selection, team building, resource allocation and support, project implementation, risk control measures, performance evaluation and rewards. In terms of success factors, the support of top management with leadership capability of value creation and sharing is very important for the success of corporate venture. Secondly, a multi reward mechanism can be introduced to motivate employees and improve performance. Thirdly, it is important to integrate corporate culture into the operating mechanism of an corporate venture. Fourthly, flexible operations that break down rigid organisational boundaries and transform the organisation into a more open platform for entrepreneurship can increase the likelihood of success. Finally, empowering employees with operational discretion can also have a positive impact on the success of an Corporate Venture. Research implications or Originality - This study contributes to theory and practice by analysing the success conditions of corporate venture, providing new understanding and drawing new perspectives, especially from the experience of Haier. The results suggest strategies and flexibility for successfully pursuing corporate venture, and provide important experience for international companies to help them gain competitive advantage in global competition. It also helps corporate leaders to promote new directions and innovations and improve their strategies to respond to dynamic environments.

A BIM and UWB integrated Mobile Robot Navigation System for Indoor Position Tracking Applications

  • Park, JeeWoong;Cho, Yong K.;Martinez, Diego
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.30-39
    • /
    • 2016
  • This research presents the development of a self-governing mobile robot navigation system for indoor construction applications. This self-governing robot navigation system integrated robot control units, various positioning techniques including a dead-reckoning system, a UWB platform and motion sensors, with a BIM path planner solution. Various algorithms and error correction methods have been tested for all the employed sensors and other components to improve the positioning and navigation capability of the system. The research demonstrated that the path planner utilizing a BIM model as a navigation site map could effectively extract an efficient path for the robot, and could be executed in a real-time application for construction environments. Several navigation strategies with a mobile robot were tested with various combinations of localization sensors including wheel encoders, sonar/infrared/thermal proximity sensors, motion sensors, a digital compass, and UWB. The system successfully demonstrated the ability to plan an efficient path for robot's movement and properly navigate through the planned path to reach the specified destination in a complex indoor construction site. The findings can be adopted to several potential construction or manufacturing applications such as robotic material delivery, inspection, and onsite security.

Development and Application of Failure-Based Learning Conceptual Model for Construction Education

  • Lee, Do-Yeop;Yoon, Cheol-Hwan;Park, Chan-Sik
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.11-17
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning conceptual model.

Online Monitoring of Ship Block Construction Equipment Based on the Internet of Things and Public Cloud: Take the Intelligent Tire Frame as an Example

  • Cai, Qiuyan;Jing, Xuwen;Chen, Yu;Liu, Jinfeng;Kang, Chao;Li, Bingqiang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제15권11호
    • /
    • pp.3970-3990
    • /
    • 2021
  • In view of the problems of insufficient data collection and processing capability of multi-source heterogeneous equipment, and low visibility of equipment status at the ship block construction site. A data collection method for ship block construction equipment based on wireless sensor network (WSN) technology and a data processing method based on edge computing were proposed. Based on the Browser/Server (B/S) architecture and the OneNET platform, an online monitoring system for ship block construction equipment was designed and developed, which realized the visual online monitoring and management of the ship block construction equipment status. Not only that, the feasibility and reliability of the monitoring system were verified by using the intelligent tire frame system as the application object. The research of this project can lay the foundation for the ship block construction equipment management and the ship block intelligent construction, and ultimately improve the quality and efficiency of ship block construction.

REQUIREMENTS FOR AUTOMATED CODE CHECKING FOR FIRE RESISTANCE AND EGRESS RULE USING BIM

  • Jiyong Jeong;Ghang Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.316-322
    • /
    • 2009
  • The more repetitive, complex and objective the work, the more effective automation is. Code checking is an example of this. Checking building codes through a thick set of drawings is error-prone and time-consuming. In order to overcome this problem, several organizations have initiated efforts to automate building-code checking. Initiated study mainly focused on checking codes for invalidation, required size and crash, and then area of checkable codes have been expanding. But, it has not been considered for codes regarding anti-disaster/egress, which is also issued these days. This study is about how to automatically check codes for anti-disaster and egress based on Korea building codes. The codes can be categorized as five sections: egress way, material/capability, principals of evacuation, evacuation stairway and fire protection partition. To check automatically, there are problems, such as expression of codes for egress and limitation of extractable information from the BIM model. This paper shows what problems exist and assignments to be resolved. Also, current developing processes are presented, and suggestions are made about the direction for the work that remains.

  • PDF