C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects (C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축)

  • Kang, Hyoung-Seok;Lee, Sang-Seok;Noh, Sang-Do;Lee, Kwang-Myoung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.2
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

Influence of Climate Change on the Lifecycle of Construction Projects at Gaza Strip

  • El-Sawalhi, Nabil;Mahdi, Mahdi
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.1-10
    • /
    • 2015
  • There is a high confidence based on scientific evidence that climate is changing over time. Now climate change is considered as one of the challenges facing the construction industry. As no project is risk free and climate change has a strong impact on the different phases of the construction project lifecycle. This research aimed at providing a platform of knowledge for the construction management practitioners about the impacts of climate change on the construction projects lifecycle, identify the most dangerous climate change factors on the construction project lifecycle, and identify the most affected phase by climate change factors through the construction projects lifecycle. The study depended on the opinions of civil engineers who have worked in the construction projects field among the reality of Gaza Strip. Questionnaire tool was adopted as the main research methodology in order to achieve the desired objectives. The questionnaire included 127 factors in order to obtain responses from 88 construction practitioners out of 98 representing 89.79% response rate about the influence of climate change on the generic lifecycle of construction projects. The results deduced that the most significant influence on the construction project lifecycle was related to the extreme weather events, rainfall change, and temperature change respectively. There was a general agreement between the respondents that the most affected phase by temperature, rainfall, and extreme weather events is the execution phase. The results also asserted with a high responses scale on the need to alternative procedures and clear strategies in order to face the climate change within construction industry.

A Study on the PLM for Construction Industry (건설산업에서의 PLM 설계에 관한 연구)

  • Noh, Sang-Do;Kim, Gun-Yeon;Lee, Sang-Seok;Kim, Jong-Hwan;Jung, Seung-Ho;Lee, Kwang-Myong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.253-258
    • /
    • 2008
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of the construction to design architecture of C-PLM(Construction Project Lifecycle management) and implement a prototype of C-PLM systems based on commercial PDM system.

  • PDF

Lifecycle Health Assessment Model for Sustainable Healthy Buildings

  • Lee, Sungho;Lim, Chaeyeon;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.369-378
    • /
    • 2014
  • A system to analyze, assess and manage the health performance of resources and spaces throughout the project lifecycle shall be established to ensure sustainable healthy buildings. Decisions made in the planning, design, construction, and operation and management (O&M) phases must help sustain the health performance of buildings at the level specified by clients or the relevant laws. For this reason, it is necessary to develop a model to ensure the consistent management of performance, as such performance varies according to the decisions made by project participants in each phase. The purpose of this research is to develop a Lifecycle Health Assessment Model (LHA) for sustainable healthy buildings. The developed model consists of four different modules: the Health-friendly Resources Database (HRDB) module, which provides health performance data regarding resources and spatial elements; the Lifecycle Health-performance Tree (LHT) module, which analyzes the hierarchy of spatial and health impact factors; the Health Performance Evaluation (HPE) Module; and the Lifecycle Health Management Module, which analyzes and manages changes in health performances throughout the lifecycle. The model helps ensure sustainable health performances of buildings.

The Analysis of Railroad Operating Costs in Korean Railroad Projects

  • SungWook KANG;DongHee KIM;GyuBae KIM
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.12 no.1
    • /
    • pp.35-42
    • /
    • 2024
  • Purpose: A railroad project is a complex system with large construction costs in the initial stage and ongoing operating costs over its lifecycle. Current railroad projects tend to be based on construction options, which leads to huge deficiencies in operating costs. This phenomenon results from a lack of appropriate tools to accurately estimate a railroad project's lifecycle costs. This study attempts to analyze the major components of railroad operating costs and to propose a decision-making system for analyzing the long-term lifecycle costs of railroad projects. Research design, data and methodology: We review the literature and analyze the current status of railroad operating costs in Korea and overseas. Based on previous projects, a framework for project options and operating costs is proposed. The framework is applied to actual railroad projects to demonstrate the validity of the model. Results: Case analysis shows that our framework is comprehensive in analyzing the primary aspects of railroad operating costs and plays an effective role in choosing various railroad project options. This study points out that the railway project operates inefficiently because estimating long-term costs without reflecting specific project options causes many errors. Conclusions: A major contribution of this study is the development of an improved framework for accurately estimating operating costs and providing policymakers and engineering firms with a holistic decision support system. Detailed components in estimating operating costs of the railroad business are discussed. And we present a decision-making tool that policymakers and private businesses can use in planning the railroad business.

Lifecycle and Requirements for Digital Collection Management of Thai Theses and Dissertations

  • Jareonruen, Yuttana;Tuamsuk, Kulthida
    • Journal of Information Science Theory and Practice
    • /
    • v.7 no.3
    • /
    • pp.52-64
    • /
    • 2019
  • This research was aimed at studying the situation, problems, and requirements for digital collection lifecycle management of Thai theses and dissertations. The mixed research method used was composed of: (1) Study of the problem and situation in which the qualitative method was applied. The research site covered 10 higher education institutions where the Thailand Digital Collection (TDC) project is operated. The informants were key administrative officers of the TDC project of each institution. In-depth and structured interviews were conducted on an individual basis to obtain the most accurate answers. (2) Study of requirements based on the quantitative research method to survey the requirements for the digital collection management system for Thai theses and dissertations from 84 purposively-selected TDC project officers and 527 end users selected by accidental sampling, totaling 611 samples. Research findings are as follow: (1) The study of the situation and problems of digital collection lifecycle management shows that Thai higher institutions systematically manage their digital collection. The management lifecycle is consistent with the Guidance documents for lifecycle management of ETDs, which included seven steps: program planning, creation, submission, and ingestion, access and retrieval of digital objects, archiving and preservation, evaluation and assessment, interoperation (creation of institutional collaboration), and development of link data. (2) The study of requirements for digital collection management of Thai theses and dissertations shows five system requirements: acquisition and gathering, digitization, metadata standards, management of rights, and storage and retrieval, all of which are at M (mandatory) and D (desirable) levels.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

Key Technologies for Building Information Modeling (BIM) (건축물 수명주기 관리를 위한 핵심기술들)

  • Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.145-149
    • /
    • 2006
  • Building Information Modeling (BIM) is the process of integrating and re-using information generated and used throughout the lifecycle of a building. BIM may not be very different from other management methods in that it aims to minimize the economic loss and maximize the profit by designing, building, and maintaining a building better, faster, yet cheaper. The major difference between BIM and other methods is that BIM approaches the goal from a system point of view whereas other methods generally approaches the goal from a business management point of view. Since a project cannot succeed without considering both systematic and managerial aspects of a project, the line has been blurred these days. This paper explores a historical background of BIM and discusses the key technologies for successful implementation of BIM.

  • PDF

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.

A Study on the interoperability between Heterogeneous Systems for C-PLM (건설 PLM을 위한 이기종 시스템 간의 상호 연동에 관한 연구)

  • Lee, Sang-Seok;Kim, Jong-Hwan;Kim, Gun-Yeon;Noh, Sang-Do;Jung, Seung-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.259-264
    • /
    • 2008
  • For the success to PLM in construction industries, the creation, management and coordination of all product-related information are essential, and the exchange of product information and data has became an important part of the of the product development. But, it is difficult to exchange, unify and manage the engineering information between different kinds of system. In this paper, introducestandard and method on the interoperability between heterogeneous systems for C-PLM(Construction Project Lifecycle Management), present embodiment case. The result of this paper expect on the interoperability between heterogeneous systems for C-PLM.