• Title/Summary/Keyword: Project Integration Management

Search Result 332, Processing Time 0.023 seconds

A Study on Quality Management and Assessment Model for System-Integration Organization

  • Lee, Byung Yong;Jung, Soo Il
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.68
    • /
    • pp.85-94
    • /
    • 2001
  • Most of customers want to know how to develop the computer system they want to get to use according to the their requirements. This study presents a Computer Integration management System for Quality (CISQ) model for system-integration organizations, which need to demonstrate their capability to consistently provide computer integrated system that meets customer satisfaction and applicable regulatory requirements. The Plan.Do.Check.Act(PDCA) cycle called by Doming wheel expresses the basic concept of continuous improvement action in order to emphasize on achieving business goal. It is useful for providing full competence of a system-integration organization to integrate management systems based on the international management system, and to take an advantage in its market. This study specifies International Certification Network Business Excellence Concept(IBEC) approach to ensure a harmonized integration of the variety of management systems and thereby produce synergy effect. The end part of this study specifies a Assessment Model including an assessment concept adding to the compliance audit according to the CISQ for the continuous improvement. A simple application on Failure Modes and Effects Analysis(FMEA) in testing phase in project life cycle has been done.

  • PDF

A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구)

  • Lee, Tae Hyung;Choi, Sung Hoon;Kim, Sang Soo;Park, Choon Soo;Kim, Ki Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF

A Methodology of Implementing the Business Process-based Knowledge Management System and its Case Study (BPM 기반의 KMS 통합 구축 방안 및 적용사례: 'H'중공업 영업 및 견적업무 프로세스를 중심으로)

  • Kim, Tae-Chul;Jang, Gil-Sang
    • The Journal of Information Systems
    • /
    • v.18 no.3
    • /
    • pp.299-326
    • /
    • 2009
  • R In today's competitive and global business management, Concern of an enterprise is to strengthen the core competency and improve it's internal business process. Therefore, Interest in BPM(Business Process Management) has grown rapidly. BPM is recognized as best solution to meet the needs of organizations that seek the cost down, integration of information, reducing of risk, improvement of productivity. In the past, the company have usually made huge investments in knowledge management systems which are based on repository keeping tacit knowledge. But this paper shows feasibility of implementation of business process-based knowledge management system that could link knowledge with business process. From an academic point of view, Although There could be several ways to build the business process-based KMS. In this paper, when BPM project and KMS project were started at the same time, the way of how to provide workers with task-related knowledge was discussed. As an case study, an estimate process of H company was analyzed and process modelling was carried out and conceptional architecture framework was depicted.

  • PDF

Research for improving quality of SI(System integration) development project (시스템 통합(SI) 구축 사업 품질 향상을 위한 연구)

  • Kim, Seok-Kwan;Ryu, Gab-Sang
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.3
    • /
    • pp.215-220
    • /
    • 2018
  • This paper limited the participation of large corporations in the mass information market by revising the Software Industry Promotion Act in order to increase business opportunity, equality of opportunity, and capacity building for small and medium sized IT companies. However, it is a fact that the medium and small SW companies have insufficient business capacity and expose various problems such as quality degradation of public information business, inadequate risk management, and deterioration of schedule management. In order to solve this problem, this paper derived the factors of quality deterioration in the system integration project and proposed to carry out the project by using some activities of VISUALIZATION, rigorous test management and Agile Methodology as a solution. Applying these measures to healthcare IT projects developed by midsize / small-sized IT companies has improved communications, improved quantitative progress management and improved project visibility. In addition, it contributed to minimizing defect resolution time, improving the requirement coverage ratio, and shortening unnecessary meeting time.

Developing a Real-time Cashflow Management System for National R&D Management (국가 연구 개발 프로젝트 실시간 자금 관리 시스템 개발에 관한 연구)

  • Han, Seung-Youp;Lee, Hyejung;Lee, Jungwoo
    • Journal of Information Technology Services
    • /
    • v.13 no.3
    • /
    • pp.343-357
    • /
    • 2014
  • As science and technology infiltrates every aspects of modern society in terms of economic and social growth and development, funding for research and development (R&D) is growing rapidly. Republic of Korea is not an exception in this trend and the R&D funding in Korea has been grown about 10% every year, recently. However, as the scope and size of funding grows exponentially, need for monitoring and managing these R&D projects becoming more and more imminent. Though different types of project management systems were developed by a variety of agencies and departments and used in monitoring and managing, these systems were developed as standalone silo type systems. These systems are not connected to each other while the same researchers may involved in different projects across agencies and department. Also, these management systems are not linked to the banking systems in which real transactions of funding occurs, such as cost reimbursement and financial audit of each R&D accounts. Historically, a few fraud and malappropriation cases were found and indicted. However, as the number of these incidents grows along with the growth of R&D funding, a large scale integration/linking of project management systems and banking systems. Realizing the importance of systems integration among agencies as well as with the banking systems, situational requirements analyses were conducted concerning the current state of R&D management system. As a results, a Real-time Case Management System (RCMS) was proposed as a solution to current problems. In this paper, the collected systems requirements were documents with analyses of the situation, the architecture of the integrated systems with more user-friendly technological alternatives. This large scale linkage requires interface standardization as well as modularization of interfaces. Proposed systems architecture is introduced here with technical details of Jex Framework used,, followed by resulting technical and economic performance of the Realtime Cashflow Management System (RCMS).

A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology (블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구)

  • Kim, Ki-Ho;Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

A Model for Construction Data Integration Based on Growth of Construction Object throughout the Overall Project Phases (프로젝트 단계별 건설객체의 성장에 근거한 건설데이터 통합 모델)

  • Kim Woo-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.143-150
    • /
    • 2003
  • Using integrated construction project data is necessary for efficient management of construction projects. Recently IFC(Industry Foundation Classes) are proposed as integration method based on interoperability and there have been several cases of system integration based on IFC. The concept of interoperability proposes the construction object as data sharing protocol between systems for system integration and independence of each system. This study proposes system development strategy by phases considering work scope and procedure of processes based on the concept of interoperability. This is proposed to overcome tendency of developing system which doesn't support real work processes as result of inclining to the format of IFC instead of properly using IFC's interoperability concept to real work scope and procedure.

  • PDF

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

Concept and Issues in Supply Chain Management for Plant Engineering Project (플랜트 엔지니어링 프로젝트의 공급망관리 : 개념과 이슈)

  • Cheong, Heung Gyo;Park, Seong-Taek;Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.10 no.9
    • /
    • pp.213-224
    • /
    • 2012
  • Supply chain management for complex project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering and closing contracts. Working with suppliers and subcontractors requires continuous integration activities during project execution. This article examines the concept and issues concerning supply chain management in plant engineering Project, of which has not been taken seriously by industry. We propose the technological infra, social infra and information system connecting all participants in supply chain, as the major fields of research requiring industry attentions, and give a brief summary of research in each proposed areas.