• 제목/요약/키워드: Project Integration Management

검색결과 331건 처리시간 0.022초

관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구 (A study on the integrated data modeling for the plant design management system and the plant design system using relational database)

  • 양영태;김재균
    • 한국해양공학회지
    • /
    • 제11권3호
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

조직간 정보시스템 통합을 위한 갈등관리모형: 은행업종의 인수.합병을 중심으로 (A Study on Conflict Management Model for IS Integration: Focusing on Banking Industry under M&A)

  • 김상훈;최점기
    • 한국IT서비스학회지
    • /
    • 제5권1호
    • /
    • pp.83-95
    • /
    • 2006
  • The main objectives of this study are (1) to identify the conflict types in IS integration process with respect to M&A, (2) to propose the ways to manage the origin of conflict to be expected, and (3) to develop the conflict management model which establishes the relationship among the M&A strategy, the IS integration strategy and change management process that influence the source of conflict. In order to achieve these research objectives, this study focuses on banking industry under M&A with the viewpoint of change management instead of existing technology-oriented IS integration strategy. The findings of this study are thought not only to be useful as a practical guideline in carrying out IS integration project under M&A but also to provide significant basis for constructing the theoretical framework of effective IS integration strategy.

통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구 (A study on the Plan for Organization Activation use analysis of Success factor Integration Information System)

  • 박종기;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2006년도 추계공동학술대회
    • /
    • pp.367-372
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about internal problems of Project team.

  • PDF

통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구 (A study on the Plan for Organization Activation use analysis of Success factor Integration Information System)

  • 박종기;강경식
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.231-242
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about Internal problems of Project team.

SI 프로젝트 범위 증감(Escalation/De-escalation)에 영향을 미치는 위험요소에 대한 연구 (Exploring on Risk Factors of SI Project Escalation and SI Project De-escalation)

  • 김상윤;백승익;최덕선;오수진
    • 한국IT서비스학회지
    • /
    • 제3권2호
    • /
    • pp.53-64
    • /
    • 2004
  • For many reasons, SI(Systems Integration) projects can fail. Sometimes, they can result in considerable financial losses to the organizations that undertake them. These projects are abandoned or redirected. However, the cost of project abandonment or redirection can represent a tremendous waste of organizational resources. By managing failure factors carefully, project managers can prevent projects from failing. Types of project failure can be categorized into escalation and de-escalation. Project escalation is that, as projects progress, the project scopes keep increasing. Project de-escalation is that, as projects progress, the project scopes keep decreasing. This study examine relative importance of risk factors that cause project escalation and de-escalation.

R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로 (A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management)

  • 원종호;최성용;김희경;박소현
    • 한국IT서비스학회지
    • /
    • 제22권3호
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구 (A Study on Project Management Scheduling Module Development using the Rule and CBR)

  • 신호균;김영준;전승호
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2004년도 춘계학술대회
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

A Simulation Model Construction for Performance Evaluation of Public Innovation Project

  • 고찬
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2006년도 춘계학술대회
    • /
    • pp.87-109
    • /
    • 2006
  • The purpose of this paper is to examine the present performance evaluation methods and to make Monte Carlo Simulation Model for the IT-based Government innovation project. It is suggested the proper ways in applying of Monte Carlo Simulation Model by integration of present evaluation methods. It develops the theoretical framework for this paper, examining the existing literature on proposing an approach to the key concepts of the economic impact analysis methods. It examines the actual conditions of performance evaluation focusing on the It-based Government Innovation project. It considers how the simulation model is applied to the performance management in the public innovation project focusing on the framework, process and procedure of performance management.

  • PDF

CMMI 기반 프로세스 지원 시스템 설계 (Design of Process Support System based on CMMI)

  • 최동희
    • 한국군사과학기술학회지
    • /
    • 제12권3호
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.