International Journal of Internet, Broadcasting and Communication
/
v.16
no.3
/
pp.298-304
/
2024
The smart factory promotion project is a project that uses ICT technology to improve the production process and the entire management environment system. In Korea, the smart factory promotion project has been continuously implemented since 2014, and the Smart Factory Promotion Team is supporting it nationally. The smart factory promotion project has shown positive results in some companies even in difficult environments such as the COVID-19 situation. In order for each company to promote the smart factory project, it must receive business approval through an evaluation based on the business plan. In order to receive business approval, it is important that the main contents described in the business plan (introduction (business) goals, qualitative goals, quantitative goals, functional composition diagram, etc.) are described consistently. In this study, we studied the cases of several companies to determine whether the main contents of the companies' business plans were consistent. The main contents to be maintained in consistency were the purpose and necessity of introduction, quantitative goals, qualitative goals, functional composition diagram, and expected effects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.1
/
pp.202-210
/
2014
This paper is to discover selection indicator for academia-industrial cooperation R&D project. Existing Project lacks careful consideration for participant enterprise. But, This project must be focused on enterprise for the goal of project is to improve business competition. Therefore, we analyze the survey result of enterprise satisfaction and deduct the factor of satisfaction by statistical analysis like One-way ANOVA and Regression. The study says that collaboration time, the time of planning of commercialization, technology transfer and the level of goal achievement improve enterprise satisfaction. And it implies needs for plan of manpower input and commercialization at the selecting phase. This paper is significant that it can improve project system by satisfaction. We expect that this result is utilized by planning and management.
International Journal of Computer Science & Network Security
/
v.22
no.10
/
pp.262-270
/
2022
In the past two decades, there has been an increasing interest in project knowledge management, as knowledge is a crucial resource for project management success. Knowledge capture and sharing are two effective project management practices. Capturing and sharing project knowledge has become more efficient due to technological advances. Nevertheless, present technologies face several technical, functional, and usage obstacles and constraints. Thus, Blockchain technology might provide promising answers, yet, there is still a dearth of understanding regarding the technology's proper and practical application. Consequently, the goal of this study was to fill the gap in the literature about the adoption of Blockchain technology and to investigate the project stakeholders' acceptance and willingness to utilize the technology for capturing and sharing project knowledge. Due to this inquiry's exploratory and inductive characteristics, qualitative research methodology was used, namely the Grounded Theory research approach. Accordingly, eighteen in-depth, semi-structured interviews were conducted to collect the data. Concurrent data collection and analysis were undertaken, with findings emerging after three coding steps. Four influencing factors and one moderating factor were identified as affecting users' acceptance of Blockchain technology for capturing and sharing project knowledge. Consequently, the results of the study aimed to fill a gap in the existing literature by undertaking a comprehensive analysis of the unrealized potential of Blockchain technology to improve knowledge capture and sharing in the project management environment.
This study aims to identify the structural relationship between mastery-approach goal orientation, instructor support, problem solving, collaborative skills, and course satisfaction among students who participated in project-based learning. To achieve the purpose of this research, researchers have conducted surveys between June and December in 2019. A total of 283 cases were selected for analysis. According to the study, mastery-approach goal orientation and instructor support have positive effects on problem solving and course satisfaction. Instructor support has positive effects on collaboration skills, and problem solving has positive effects on collaboration skills and course satisfaction. Also, the mediating effect of problem solving in the relationship among mastery-approach goal orientation, instructor support, collaboration skills, and course satisfaction was found to be statistically significant. However, the path between mastery-approach goal orientation and collaboration skills was not statistically significant. Based on these findings, academic and practical implications were suggested.
The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.145-149
/
2006
Building Information Modeling (BIM) is the process of integrating and re-using information generated and used throughout the lifecycle of a building. BIM may not be very different from other management methods in that it aims to minimize the economic loss and maximize the profit by designing, building, and maintaining a building better, faster, yet cheaper. The major difference between BIM and other methods is that BIM approaches the goal from a system point of view whereas other methods generally approaches the goal from a business management point of view. Since a project cannot succeed without considering both systematic and managerial aspects of a project, the line has been blurred these days. This paper explores a historical background of BIM and discusses the key technologies for successful implementation of BIM.
We overview the GRAPE (GRAvity piPE) project. The goal of the GRAPE project is to accelerate the astrophysical N-body simulations. Since almost all computing time is spent for the evaluation of the gravitational force between particles, we can greatly accelerate many N-body simulations by developing a specialized hardware for the force calculation. In 1989, the first such hardware, GRAPE-1, was completed, with the peak speed of 120 Mflops. In 2003, GRAPE-6 was completed, with the peak speed of 64 Tflops, which is nearly 106 times faster than GRAPE-l and was the fastest computer at that time. In this paper, we review the basic concept of the GRAPE hardwares, the history of the GRAPE project, and two ongoing projects, GRAPE-DR and Project Milkyway.
Risk Management is one of the most important factors in web design project management. The purpose of risk management is to identify reasons of risk to avoid risky situation and successfully achieve final goal of the project. This paper first describes concept of the web design project management and its processes. Secondly this study presents planning principles for systematic risk management process. Also it suggests a model of risk management. Finally this paper demonstrates utility of the risk management model through case studies based on the suggested risk management model.
Journal of the Korean Professional Engineers Association
/
v.43
no.4
/
pp.44-49
/
2010
Th Rach Gia Bypass Project, to be implemented under EDCF Loan VNM-12, constitutes a strategically important part of the Greater Mekong Sub-region Southern Coastal Corridor Project(the GMS-SCCP). The main goal of the GMS strategy is to promote sustainable economic growth, improve employment, and achieve poverty reduction by tapping the comparative advantages of Vietnam, Cambodia and Thailand. As a project manager who once took a responsible position for the completion of RGBP's detailed design, I would like to briefly introduce what our design team including the local sub-contractors had performed for the D/Design of this Project last year, especially in the field of highway, bridge and soft soil treatment method widely used in Mekong Delta area. With the performance of nearly two Projects due to the V.O. in one year on the prescribed time, it was a hard year but a rewarding one. To expand our horizon more about overseas projects, several recommendations for the brighter future of overseas projects are shown herein this paper.
Journal of Korean Society of Industrial and Systems Engineering
/
v.33
no.1
/
pp.91-97
/
2010
Six Sigma is widely recognized as a process improvement methodology. In these days, many organizations today are considering how to choose six sigma project. This study is to provide six sigma project selection criteria by comparing public corporate with private corporate using AHP. In this exploratory study, criteria to select six sigma project is developed and suggested to fit goal of each organizations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.