• Title/Summary/Keyword: Project Goal

Search Result 626, Processing Time 0.026 seconds

An exploratory study on the collaboration mechanism in project-based business : focused on supply chain institutions and operational efficiency (프로젝트형 사업에서 협업기제에 대한 탐색적 연구 : 공급망 제도와 운영효율성을 중심으로)

  • Cho, Namhyung
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.10
    • /
    • pp.173-183
    • /
    • 2019
  • The purpose of research is to explore the direction of building a collaborative supply chain, which may enhance the competitiveness of firms and their project-based supply chain. Large-scale plants or large-scale buildings construction is referred to as a EPC project. To identify a collaboration mechanism in the project-based supply chain, the empirical research was conducted on the interrelationship between the absorption capacity of firms participating in the EPC project, the incentive norms, the goal congruence with supply chain, and the ability of respond to changes of the task of supply chain. PLS-SEM was used as an analysis method to verify the research model. It is expected that the results will help inform the need for SCM, the importance of the incentive norms and the goal congruence in the supply chain of EPC project.

The Effect of the Project Managers' IT Competency and Managerial Competency on the Success of SI Projects : Focusing on the Moderating Effect of Project Size (SI 프로젝트에 있어서 프로젝트 관리자의 정보화 역량과 관리 역량이 프로젝트 성공도에 미치는 영향에 대한 연구 : 프로젝트 규모의 조절효과를 중심으로)

  • Lee, Choong C.;Park, Joo-Yeon;Choi, Jeong-Hoon
    • The Journal of Information Systems
    • /
    • v.21 no.4
    • /
    • pp.31-54
    • /
    • 2012
  • Information Systems have played a strategic role in achieving business goal and become an essential tool in today's business environment. Thus, the number of developing SI project has increased and it becomes complex and sophisticated. It is known that project manager's leadership could lead the project success. In this study, project manager's competencies are divided into two types, information competency(information-oriented mind, information utilization competency, information development competency) and managerial competency(project management, human relationship, project expertise. The purpose of this study is to examine the effect of information competency and managerial competency on the SI project success and to find out the moderating effect of project size. The result of this study reveals that information utilization competency, project management competency and human relationship have a strong relationship with both customers and suppliers side of projet success. Moreover, the relationship between managers' competencies and project success is shown to be different by project size. The result of this study implies that each managers' competencies has to be developed and applied according to project's complexity and size.

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

A Process of the Risk Management for a Space Launch Vehicle R&D Project (우주발사체 개발사업의 위험관리 프로세스)

  • Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • Many countries concentrated on the space developments to enhance the national security and the people's quality of life. A space launch vehicle for accessing the space is a typical large complex system that is composed of the high-technology like high-performance, high-reliability, superhigh-pressure, etc. The project developing large complex system like space launcher is mostly conducted in the uncertain environment. To achieve a goal of the project, its success probability should be enhanced consistently by reducing its uncertainty during the life cycle: it's possible to reduce the project's uncertainty by performing the risk management (RM) that is a method for identifying and tracing potential risk factors in order to eliminate the risks of the project. In this paper, we introduce the risk management (RM) process applied for a Space Launch Vehicle R&D Project.

An Empirical Study on Failure Factors of Information System Development Projects for SMEs (중소제조업체의 정보시스템 개발 실패 요인에 관한 실증연구)

  • Hong, Soon-Goo;Choi, Il-Yong
    • Journal of Information Technology Services
    • /
    • v.8 no.4
    • /
    • pp.41-55
    • /
    • 2009
  • Due to the global business environments and severe competitions, SMEs have carried out IS projects for their competitive advantages. However, numerous organizations have faced with difficulties in the IS project management such as large amounts of IT expenses and uncertainties in project implementations. Thus, this study is intended to discover critical risk factors in the IS project management. To achieve this research goal, we have mailed questionnaires to SMEs and SI companies that experienced IS project failures and 63 usual data were collected. The result of analysis with step wise regression showed that 6 factors are related with IS project failures. The study contributes to the literature in two ways. First, this paper empirically identifies IS risk factors for SME manufactures. Second, this research result can be utilized as a checklist for the successful IS implementations. Limitations and future research topics are also discussed.

A Case Study on EAI Implementation for Enterprise Process Integration: Focusing on EAI Project in Deakyo Co (기업 프로세스 통합을 위한 EAI 구축사례: 대교(주)의 EAI 프로젝트를 중심으로)

  • Yoon, Cheol-Ho;Choi, Hea-Seong
    • Journal of Information Technology Services
    • /
    • v.5 no.3
    • /
    • pp.109-119
    • /
    • 2006
  • The company cannot optimize its computing environment just with individual solutions such as ERP(enterprise resource planning), SCM(supply chain management), CRM(customer relationship management), and KM(knowledge management). EAI(enterprise application integration) has emerged as an alternative that can optimize computing environment of the company through integrating such solutions and systems of distributed computing and mainframe environment. This paper reports the case study of Deakyo Co. in successfully implementing EAI. It describes project goal, project organization, project plan, the implemented EAI configuration and its features, the EAI effectiveness to the firm, and the critical success factors of the EAI project. This case study is thought to be useful as a practical guideline in carrying out EAI project of the company and to provide significant basis for constructing the theoretical framework of EAI project methodology.

A Study on the Methods of Improving the Lifelong Learning City Project Based on the Community Development Theory (지역사회개발론에 근거한 평생학습도시 사업 개선 방안 탐색)

  • Yang, Heung-Kweun
    • The Korean Journal of Community Living Science
    • /
    • v.19 no.2
    • /
    • pp.245-265
    • /
    • 2008
  • The Lifelong Learning City Project has made quantitative expansion as well as qualitative growth since 2001 but the project has been criticized by academic scholars and field practitioners. The Lifelong Learning City Project is a national policy project which has been promoted by the Ministry of Education and Human Resources Development and should be required to make production profits proportional to the amount of public finance. The Lifelong Learning City Project is a community development project intended to promote growth and progress by supporting the community in lifelong learning endeavors. Therefore, the community development theory could offer guidelines to the Lifelong Learning City Project. Based on this assumption, this study intends to investigate the Lifelong Learning City Project at the national, city, and county levels using the community development theory. The improvement methods of the Lifelong Learning City Project are role allotment between national and wide level projects supporting organizations, and the establishment of a system and a long term project policy. In addition, the project is to have a more systematic performance. It is to enhance opportunities for community members' participation, and practice in planning, performance of learning, and the proper performance in regard to the community conditions and specificity. The most important goal of the Lifelong Learning City Project is to support the empowerment of community members by making opportunity planning, practicing and sharing lifelong learning more accessible.

  • PDF

The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects (원자력 발전소 건설 프로젝트에서 갈등이 협력과 성과에 미치는 영향에 관한 연구)

  • Yu, Yeong Seok;Jo, Dong Hyuk;Choi, Hye Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.553-569
    • /
    • 2019
  • Purpose: The purpose of this study is to identify the impact of conflicts and cooperation on project performance in the nuclear power plant construction project, thus contributing to the successful performance of project participants and the achievement of project objectives. Methods: This study used a method of conducting a survey of participants in the nuclear power plant construction project and verifying the hypothesis statistically. Results: The results of this study are as follows; First, role conflicts and relationship conflicts have negative effects on collaboration. Second, role conflicts have a negative effects on project performance, but conflict in relation has no significant effects on project performance. Third, collaboration has a positive effects on project performance. Finally, the communication quality in the relationship between conflict and collaboration has been shown to have a Moderated effect. Conclusion: In order to achieve the goal in the nuclear power plant construction project, the level of collaboration should be improved based on conflict management among project participants.

Verification specifications and results of the railway total safety technology development project adopting systems engineering (시스템 엔지니어링을 적용한 철도종합안전기술개발사업의 2차년도 성과물 검증 기준 및 결과)

  • Han, Soon-Woo;Yoon, Hyuk-Jin;Shin, Jung-Moo;Kim, Sang-Ahm;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1209-1215
    • /
    • 2007
  • To establish the national railway safety system, the railway total safety technology development project has been promoted by Ministry of Construction and Transportation (MOCT) since August 2004. The project is mainly focused on the prevention of a critical railway accident and the reduction of accident/mortality rate. To achieve its goal effectively, the project is composed of 15 sub-projects each of which can be categorized into three different technological area. This work deals with the verification results for the outcomes of the sub-projects carried out at the 2nd year of the project. A new verification procedure is developed and applied to the project based on the system engineering. Three criterions - The suitability of the realization of a function, the suitability of a physical structure, the suitability of a design analysis report - are used for the verifications. The verification results are investigated by calculating standard deviations of scores of each results.

  • PDF

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF