• Title/Summary/Keyword: Project Difficulty

Search Result 257, Processing Time 1.233 seconds

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

Buffer Sizing Method of CCPM Technique Using Statistical Analysis (통계분석을 이용한 CCPM 기법에서의 버퍼 산정방법)

  • Liu, Jing-Chao;WhangBo, Taeg-Keun
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.29-36
    • /
    • 2012
  • In CCPM Technique, as the buffer size calculation method, the Cut and Paste(C&P) method and the Root Square Error (RSE) method for all tasks carried out the same treatment, without considering the actual situation and characteristics of the task, the lack of reasonable judgment, is too simple and hasty. In this paper, taking into account the limitations of existing methods, a new method of buffer sizing method based on statistical analysis was introduced. It makes statistical analysis for the relationship between each worker and a variety of tasks, and use the information to predict the next task time. In order to verify the effectiveness of the new method, according to different task difficulty and the number of tasks set up the project. Use C&P, RSE method and new methods to predict the time of the project. Through Monte Carlo Simulation to simulate the project time, a comparison of three methods of performance. The results show that the new method can achieve the managers expect the probability of completion, and for those tasks can be completed ahead of schedule, the new method can save project time.

Weights for Construction Performance Impact Factors of Public Construction Project (공공건설사업 건설성과 영향요인 가중치 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.373-379
    • /
    • 2012
  • Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.

A Study on Teacher-learner Feedback Method for Effective Software Project Execution of Non-Computer Major Students (컴퓨터 비전공자의 효과적인 소프트웨어 프로젝트 수행을 위한 교수자-학습자 피드백 방법에 관한 연구)

  • Jung, Hye-Wuk
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.211-217
    • /
    • 2019
  • The term project executed at the university is a learner-centered learning method in which students select their topics, draw up their plans, and produce results by themselves based on the content they have learned during the semester. Through the term-end project of the subjects relating software, students learn various techniques for the programming language and produce the outcomes of their project by the creative program development process. However, non-computer majors who take software course as liberal arts subjects have difficulty in understanding the programming language, so it is necessary to provide feedback from their professor for encouraging students in carrying out their projects smoothly. Therefore, a feedback method by the discussions between a professor and learners that can be applied to the term-end project of programming subject for the non-computer majors is proposed. The proposed method was apply to the actual term-end projects and the meaningful results were confirmed through the analysis of the project processes and outcomes.

Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects (토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구)

  • Lee Yang-Kyoo;Kang Leen-Seok;Park Jong-Hyuk;Jeon Seong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

A Case Study on Implementation of ITSM using 6 Sigma Technique Focused on Service Desk (6시그마 기법을 활용한 ITSM 정착에 관한 사례 연구 : 서비스데스크를 중심으로)

  • Yoon, Kwan-Sik;Hwang, Kyung-Tae
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.1-14
    • /
    • 2007
  • Recently. interests in IT Service Management (ITSM) are increasing internationally as well as domestically. In order to realize the benefits from ITSM, it is necessary to institutionalize it as a culture of the organization through effective change management. One of the most promising approach of effective change management is a Six Sigma technique. In this study, we analyze a success case in which 6 Sigma was applied to Service Desk function which is one of the most important functions of ITSM. Through the analyses, this study aims to propose a feasible and specific approach to institutionalize ITSM. To accomplish the objective. the study analyzed specific methods of application of 6 Sigma to ITSM. performance of the project and future directions based on interview and project document/deliverable review. This study could not provide detailed performance measures due to lack of previous research on this topic and difficulty of obtaining quantitative data. However. this study has contributed to proposing a direction to institutionalize ITSM in organizations by analyzing a feasibility of 6 Sigma in implementing ITSM.

  • PDF

EFFECTS OF ADOPTING KMS BASED BUSINESS PROCESS MANAGMENT IN DESIGN COMPANIES IN KOREA

  • Jin-Won Hwang;Hyung-Won Choi;Doo-Won Hwang;Young-Woong Song;Hyong-Chul Lim;Yoonki Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1030-1035
    • /
    • 2009
  • The value of intangible assets of a company attracts attention in enterprise management environment drastically changing. Following such a trend, many companies have adopted knowledge management. Especially in construction industry of which success of a project is easily affected by the capacity of various participants and work performers, we may find many cases to which the knowledge managements have been adopted. However, the domestic design companies have tended to be late to introduce the knowledge management or have difficulty in effective use of KMS already constructed. This study suggests KMS based on BPM (Business Process Management) and drives its effects to improve problems mentioned above. We drives the expected effects by studying the existing studies and surveying domestic design companies and suggests Prototype for introducing a real system.

  • PDF

Development of Expert system for Plant Construction Project Management (플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발)

  • 김우주;최대우;김정수
    • Journal of Information Technology Application
    • /
    • v.2 no.1
    • /
    • pp.1-24
    • /
    • 2000
  • Project management in the Construction field inherently has more uncertainty and more risks relative to ones from other area. This is the very reason for why project management is recognized as the important task to construction companies. For getting better performance in the project management, we need a system that keeps the consistencies in a automatic or semi-automatic manner through the project management stages like as project definition stage, project planning stage, project design and implementation stage. But since the early stages such as definition and planning stages has many unstructured features and also are dependent to unique expertise or experience of a specific company, we have difficulty providing systematic support for the task of these stages. This kind of problem becomes harder to solve especially in the plant construction domain that is our target domain. Therefore, in this paper, we propose and also implement a systematic approach to resolve the problem mentioned for the early project management stages in the plant construction domain. The results of our approach can be used not only for the purpose of the early project management stages but also can be used automatically as an input to commercial project management tools for the middle project management stages. Because of doing in this way, the construction project can be consistently managed from the definition to implementation stage in a seamless manner. For achieving this purpose, we adopt knowledge based inference, CBR, and neural network as major methodologies and we also applied our approach to two real world cases, power plant and drainage treatment plant cases from a leading construction company in Korea. Since these two application cases showed us very successful results, we can say our approach was validated successfully to the plant construction area. Finally, we believe our approach will contribute to many project management problems from more broader construction area.

  • PDF

The Task and Role of the Quality Improvement Facilitator (QI전담자의 주요 업무 및 역할 규명)

  • Kim, Moon-sook;Kim, Hyun-ah;Kim, Yoon-sook
    • Quality Improvement in Health Care
    • /
    • v.21 no.2
    • /
    • pp.40-56
    • /
    • 2015
  • Objectives: To outline overall duties of quality improvement (QI) performers within a health care organization, thus describing their key tasks, including task element-related frequency, importance and difficulty in enough detail. Methods: A DACUM (Developing A CurriculUM) workshop took place to outline overall job activities of QI performers. To examine the scope of their duty and task, we performed a questionnaire survey of 338 QI performers from 111 hospitals. Results: The results of our survey showed that for the task assigned to each QI performer, there were 10 duties, 31 tasks and 119 task elements. Respondents cited a project planning as the most frequent/important duty, and a research was the highest level of difficulty in their duty. They also said that the most frequent task was index management, the most important task was a business plan, and the highest level of difficulty was a practical application of QI research. QI performers added that the most frequent task element was receipt of patient safety reporting in patient safety system, the most important task element was an analysis for patient safety and its improvement, and the highest level of difficulty was a regional influence analysis related to the patient safety and its improvement. Conclusion: To ensure that QI performers play a pivotal role as a manager to better improve patient safety and the quality of health care services, proper training program for them should be developed by reflecting the results of our study.

Ensuring Economic Benefits of Mitigation Projects for Improving the Image of Construction Industry

  • Son, Chang-Baek;Shin, Won-Sang;Kim, Dae Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.3
    • /
    • pp.67-74
    • /
    • 2014
  • Over the last several decades, the United States has experienced a great number of natural disasters. To minimize the impact of the natural hazard events, the U.S. government spent a tremendous amount of money through federal assistant programs. To be eligible for the programs, a mitigation project must be cost effective (more benefits compared to project costs). However, the state and local communities suffering from the natural disasters generally have difficulty in collecting reliable evidence for their damages which can be converted later into benefits when a mitigation project is implemented. Therefore, this paper shows the process of conducting a benefit cost analysis with limited data. Besides, it also provides how to apply the limited data to the analysis through a case study. Consequently, this paper help state and local communities get funding from the federal government, which in turns will improve the image of construction industry by preventing people from natural disasters.