• Title/Summary/Keyword: Project Difficulty

Search Result 255, Processing Time 0.029 seconds

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

MANAGEMENT OF DIGITAL DESIGN DATA IN BUILDING DESIGN AND CONSTRUCTION UNITS

  • Linas Gabrielaitis ;Romualdas Bausys
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.725-730
    • /
    • 2005
  • The problem of managing digital design data including drawings, specifications and other technical data in building design and construction units is a real challenge, especially when there is a need to structure the design information across building design companies. The main difficulty in this information management is the shortage of unified rules (or standards) on how the digital design data should be gathered, archived, and preserved in the most efficient way for building design and construction units. The most important issue, which addressed in this work, is the standardized reference of all design data definitions.

  • PDF

Estimating the Physical Demand of Waterproofing Worker

  • Lim, Tae-Kyung;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.101-103
    • /
    • 2015
  • Scientific methods that measure the physical demand requirements of a construction operation have not been arrived at maturity in construction community. It is attributed to the difficulty involved in performing controlled experiments on the operation and its' volatile jobsite environment. This paper presents a method that measures the physical demand requirement of the waterproofing activity and verifies the differences between various operations (e.g., a primer painting and a polyurethane coating) consisting of the activity. Two hypotheses, which are involved in the operations, are summarized as follows: [Hypothesis 1] when one performs the same amount of work; the one's average heart rate required for the polyurethane coating operation is higher than that required for the primer painting operation. [Hypothesis 2] when one performs the same amount of work, the one's break time required for the polyurethane coating operation is longer than that required for the primer painting operation.

  • PDF

The Preliminary Feasibility on Big Data Analytic Application in Construction

  • Ko, Yongho;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.276-279
    • /
    • 2015
  • Along with the increase of the quantity of data in various industries, the construction industry has also developed various systems focusing on collecting data related to the construction performance such as productivity and costs achieved in construction job sites. Numerous researchers worldwide have been focusing on developing efficient methodologies to analyze such data. However, applications of such methodologies have shown serious limitations on practical applications due to lack of data and difficulty in finding appropriate analytic methodologies which were capable of implementing significant insights. With development of information technology, the new trend in analytic methodologies has been introduced and steeply developed with the new name of "big data analysis" in various fields in academia and industry. The new concept of big data can be applied for significant analysis on various formats of construction data such as structured, semi-structured, or non-structured formats. This study investigates preliminary application methods based on data collected from actual construction site. This preliminary investigation in this study expects to assess fundamental feasibility of big data analytic applications in construction.

  • PDF

Feature Template-Based Sweeping Shape Reverse Engineering Algorithm using a 3D Point Cloud

  • Kang, Tae Wook;Kim, Ji Eun;Hong, Chang Hee;Hwa, Cho Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.680-681
    • /
    • 2015
  • This study develops an algorithm that automatically performs reverse engineering on three-dimensional (3D) sweeping shapes using a user's pre-defined feature templates and 3D point cloud data (PCD) of sweeping shapes. Existing methods extract 3D sweeping shapes by extracting points on a PCD cross section together with the center point in order to perform curve fitting and connect the center points. However, a drawback of existing methods is the difficulty of creating a 3D sweeping shape in which the user's preferred feature center points and parameters are applied. This study extracts shape features from cross-sectional points extracted automatically from the PCD and compared with pre-defined feature templates for similarities, thereby acquiring the most similar template cross-section. Fitting the most similar template cross-section to sweeping shape modeling makes the reverse engineering process automatic.

  • PDF

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - (공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 -)

  • Park, Jun-Soo;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

The Meaning and Usefulness of Simulation Method for Business Process Reengineering -Focused on the Korean Supreme Court BPR Project (1994-2003)-

  • Hong, Sung-wan;Roh, Tae-hoon;Kang, Sung-min;Lee, Jung-woo;Kang, Ga-na
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.170-202
    • /
    • 2001
  • Simulation is used to reduce a risk involved in the new project and decision-making in an organization and to save cost and time by forecasting different situations. The objectives of this research are to acknowledge the need of simulation through the real life sample and to encourage the use of the simulation method in the future consulting project by continuously making the necessary improvements. This research analyzed the effectiveness of the simulation based on the sample use of simulation method in 1994 and 1997 for the BPR project of certification issuance process at the Supreme Court. In order to evaluate the value of the proposed simulation model, we examined the gap, which existed between the simulation result and the operational data collected by visiting the actual sites where AROS (Automated Registry Office System: automation system developed by LG-EDS Systems) is being utilized. We also identified the causes for the existing gap. According to the analysis result, (1) the gap came from the status change of thinking that the concentration of certification issuance request has eased after the computerization, (2) the gap existed in the operational process because they failed to consider the situational factors of each registry office in the simulation model, and (3) lastly the gap came from the difficulty of formulating the mathematical model for predicting the complex and diverse behavior pattern of individuals requesting the certification issuance. In order to narrow the existing gaps, we made a proposal to improve the certification issuance process where software of certification issuance vending machine was upgraded in order to help the people to use the service conveniently, more part time workers were hared when there was a overload of certification issuance request, and the quality of the certification Issuance vending machine is improved, In this research, we examined an efficient way of resource allocation based on the simulation conducted in 1994 and 1997. By reflecting changes since the simulation of 1994 and allocating the clerk and machine based on the predicted results of the simulation, we maximized the efficiency of the certification issuance process. In conclusion, this research examined the future usability of simulation method based on the analysis result and identified the key issues to consider when using the simulation method in the future consulting project.

  • PDF

An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA (IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석)

  • Ha, Sung-Wook;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.59-67
    • /
    • 2015
  • Overseas expansion of domestic construction over the past 10 years has been fast growing. But as a result of simple construction business practices and a focus on EPC, sales margins was reduced. Domestic construction companies have been trying to redirect business to high-value-added-areas but have faced difficulty because there areas are current monopolized by global leading companies in the field of PMC. They have recently carried out 16 PMC related project in order to expand their experience and increase their competitiveness. Most of these construction companies that do PMC overseas have been focusing on the civil engineering sector. analyzing the important and performance result 50 separate PMC tasks in detail using IPA, it became clear that domestic construction companies should also focus on tasks and were analyzed in order to advance to overseas architecture PMC sector overseas. There are large gaps in the importance and performance result of both the planning and pre-construction phase. Importance compared to the current performance levels in the planning phase gap is largest, pre-construction phase has been analyzed in the following order. In particular, one should strengthen detailed tasks in the planing phase. This study is expected to be used as a basic to determine the performance level and tasks items. It is expected strengthen the capacities of domestic companies in the PMC field, for especially in the high value-aded-areas as indicated in the results of the analysis from this study.

Exploring the roles of Korean public health doctors in the development of Korean medicine health promotion project (한의약건강증진사업 발전을 위한 공중보건한의사 역할 탐색)

  • Jin, Sungmi;Park, Sunju
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.21 no.3
    • /
    • pp.11-18
    • /
    • 2017
  • Objectives : In an effort to suggest a developmental plan of Traditional Korean Medicine health promotion project(TKM-HPP), this study was conducted to identify the problems experienced by public health Traditional Korean Medicine(PH-TKM) doctors in duty and to analyze successful cases of the health promotion project. Methods : Two PH-TKM doctors in duty at the Public Health Centre branch and Public Health Centre respectively, and one TKM doctor in charge of Public Health Centre participated in the in-depth interview. The research procedure was as follows; 1) inform study objectives and interview questions to participants, 2) in-depth interview with semi-structured questions, and 3) post-confirmation and verification. The interview was recorded and transcripted. In-depth interview was composed of 6 subsections: 1) Introducing participants and share purpose of interview, 2) Confirmation of the job status and difficulty of public health centre, 3) Reflecting and sharing experiences of public health clinic job performance cases, 4) Current status and improvement needs of TKM-HPP, 5) Discussions on improvement of TKM-HPP in public health center, 6) Sharing and reconfirmation of interview results. Thematic analysis was conducted from the narratives. Results : The study showed that; 1) the support from the local government was critical for the successful TKM-HPP and participation of the PH-TKMs; 2) the major problems experienced by PH-TKMs were lack of training for TKM-HPP in the field and lack of knowledge at local government level; 3) the suggestions to provide PH-TKMs with manual to educate residents effectively and redefine roles of PH-TKMs in the project. It also suggests that TKM-HPP model should be developed by the district in a way of reflecting regional characteristics. Conclusions : Firstly, more efforts should be made on the projects rather than medical treatment in public health centers, except for areas where medical institutions are scarce. Secondly, in order to facilitate participation of PH-TKM doctors, each local office should reduce medical care and increase efforts related with projects. Thirdly, the institution has to develop feasible TKM-HPP plans that can be carried out by PH-TKMs by the manual. Lastly, pre-training should be provided to PH-TKMs to understand contents of TKM-HPP related to public health centre work before the placement.