SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards (IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동)

  • Baek, Young-Goo;Park, Hee-Jun;Gu, Jung-Suh;Seo, Do-Seok;Lee, Key-Seo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

Introduction to SE Process Application on the development project of the Korean High-speed Train(HSR 350-x) (한국형 고속열차(HSR 350-x) 개발사업의 시스템엔지니어링 프로세스 적용사례 소개)

  • Park, Choonsoo;Lee, Tae Hyung;Choi, Sunghoon;Kim, Kihwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.15-26
    • /
    • 2008
  • The Korean High-speed train was developed during 1996 to 2007. This development project consists of many sub-projects and the train-system includes a lot of sub-systems. In order to promote the project on planned cost and time effectively, we tried to apply systems engineering process during the whole life-cycle. The purpose of this paper is to introduce the systems engineering process applied to this project. Activities carried out in each phase such as pre-design, detailed-design, integration & verification are described.

  • PDF

Probability- based Life Cycle Cost Analysis of Railroad Structures (확률적 방법에 의한 철도시설물의 LCC 분석)

  • Sho Byung-Choon;Choi Young-Min;Cho Sun-Kyu;Shin Kyung-Chul;Jung Jae-Dong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF

Effects of polysaccharides derived from Orostachys japonicus on induction of cell cycle arrest and apoptotic cell death in human colon cancer cells

  • Ryu, Deok-Seon;Baek, Geum-Ok;Kim, Eun-Young;Kim, Ki-Hoon;Lee, Dong-Seok
    • BMB Reports
    • /
    • v.43 no.11
    • /
    • pp.750-755
    • /
    • 2010
  • Crude Orostachys japonicus polysaccharide extract (OJP) was prepared by hot steam extraction. Polysaccharides (OJPI) were separated from OJP by gel filtration chromatography and phenol-sulfuric acid assay. The average molecular weight of the OJPI was 30-50 kDa. The anti-proliferative effect of OJPI on HT-29 human colon cancer cells was investigated via morphology study, cell viability assay, apoptosis assay, cell cycle analysis, and cDNA microarray. OJPI inhibited proliferation and growth of HT29 cells and also stimulated apoptosis in a dose- and time-dependent manner. In cell cycle analysis, treatment with OJPI resulted in a marked increase of cells in the G0 (sub G1) and G2/M phases. To screen for genes involved in the induction of cell cycle arrest and apoptosis, the gene expression profiles of HT-29 cells treated with OJPI were examined by cDNA microarray, revealing that a number of genes were up- or down-regulated by OJPI. Whereas several genes involved in anti-apoptosis, cell proliferation and growth, and cell cycle regulation were down-regulated, expression levels of several genes involved in apoptosis, tumor suppression, and other signal transduction events were up-regulated. These results suggest that OJPI inhibits the growth of HT-29 human colon cancer cells by various apoptosis-aiding activities as well as apoptosis itself. Therefore, OJPI deserve further development as an effective agent exhibiting anticancer activity.

A Study on Deduction of Reasonable Inspection Time in Educational Facilities Based on Regression Analysis (회귀분석을 이용한 합리적인 교육시설물 점검시간의 산정 기준 도출에 관한 연구)

  • Seok, Hyun-Su;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.34-42
    • /
    • 2007
  • The investment of BTL(Build-Transfer-Lease) projects for the educational facilities has been increased since 2005. However, many trial errors and problems have been occurring due to the lack of inspection criteria in maintenance cost for the lift cycle of the facilities. Thus, purpose of this study is to derive regression equation for the daily inspection and the regular inspection through analysis of CAD data in order to set the inspection criteria. It is possible to calculate economical maintenance cost of BTL project in educational facilities using criteria of inspection time through the regression equation developed in this study.

Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam

  • VO, Khoa Dang;NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.635-644
    • /
    • 2020
  • The construction industry in developing countries like Vietnam, which incorporates small and medium construction enterprises, is typically more prone to disputes and contract dispute-related lawsuits. A dispute may occur at any time in the life cycle of the project. It is sometimes solved with the intermediation of a lawyer or directly by stakeholders. Understanding the causes of disputes in a construction project not only improves the efficiency of a company but also increases the success of projects. This study was carried out using a questionnaire survey at construction projects in Ho Chi Minh City. Sample data with 117 observations were analyzed to find the disputing factors in construction projects: diversity of working style among the parties; reluctance to work; and poor teamwork. Correlation coefficient on a rank of factors between design consultant and contractor; Design consultant and project owners are positively correlated. The Exploratory Factor Analysis (EFA) analysis identified six groups of factors in construction disputes: cooperation, technology, economics, productivity, information, and behavior. The findings are useful for enterprise practice and provide participants with an overview of sources of dispute. Thus, a more complete risk management plan can be formulated, which will accelerate project progress and improve the likelihood of success.