• Title/Summary/Keyword: Project Cargo

Search Result 64, Processing Time 0.031 seconds

A Study on Concatenation of Air & Sea Logistics' Information Using Telematics System;Case of Inchoen u-City (텔레매틱스 시스템을 이용한 항공 및 항만 물류 정보 연계에 관한 연구;인천 첨단물류도시 대상)

  • Hong, Seung-Beom;Kim, Woong-Yi
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.15 no.4
    • /
    • pp.100-107
    • /
    • 2007
  • We proposed the concatenation of logistics' Information to constructing the intelligent logistics city that is to manage efficiently cargo distribution as providing at real-time information of cargo location trace and management through the Telematics/RFID. Case of the Incheon of the "Air Logistics Hub", this area is on an increasing trend on the quantity of cargo transport of the Air & Sea cargo system until 2006. As intelligent project of the Air's and the Sea's field is independently developed at each area, it is a problem on the concatenation of logistics' information such as freight location trace and management, operation management and route information of cargo vehicles. Therefore, we propose the advanced transport service model for the concatenating smoothly of Air & Sea cargo system. In this paper, we only manage the model of Air & Sea cargo system of the advance logistics city.

  • PDF

Inchon International Airport's Role in the 21st Century as Northeast Asia's Hub Airport (인천국제공항의 21세기 동북아 중추공항으로서의 역할)

  • Lee, Sun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.14-22
    • /
    • 2001
  • Kimpo International Airport, located within the Seoul metropolitan district, experienced a sudden surge of passengers and cargo in recent years. In 1990, MOCT sponsored feasibility studios and Youngjong Island location was selected as the most suitable choice among four proposed sites to build a new airport. The construction work was then commenced in November 1992. Phase I project facilities are scheduled to start its operation in March 2001 with an annual capacity of 27 million passengers and 1.7 million tons of cargo for both enplaning and deplaning from International liners. Kimpo International Airport will remain in operation primarily for domestic passengers and cargo only. Phase II project construction work will add two more runways with its related facilities by 2005. Inchon International Airport will then conveniently serve 100 million passengers for enplaning and deplaning, and 7 million tons of inbound and outbound cargo annually in its full capacity. All the airport facilities In phase I and phase II periods are constructed to meet international standards. A fully integrated transportation network and logistics function systems should be accomplished prior to the full operation of the airport. With these sccomplishments, the state-of-the-art airport is poised to meet the needs of a rapidly growing worldwide air transport industry, and will more than adequately fulfill its role as a hub airport for the Northeast Asia region.

  • PDF

A Study on the Ship Cargo Hold Structure Data Model Based on STEP (STEP을 근거로 한 선체화물창부 구조 데이터 모델에 관한 연구)

  • 박광필;이규열;조두연
    • Korean Journal of Computational Design and Engineering
    • /
    • v.4 no.4
    • /
    • pp.381-390
    • /
    • 1999
  • In this study, a pseudo ship structure data model for the :.hip cargo hold structure based on STEP is proposed. The proposed data model is based on Application Reference Model of AP218 Ship Structure which is the model that specifies conceptual structures and constraints used to describe the information requirements of an application. And the proposeddata model refers the Ship Common Model framework for the model architecture which is the basis for ongoing ship AP development within the ISO ship-building group and the ship product definition information model of CSDP research project for analyzing the relationship between ship structure model entities. The proposed data model includes Space, Compartment. Ship Structural System, Structural Part and Structural Feature of cargo hold. To generate this data model schema in EXPRESS format, ‘GX-Converter’was used which enables user to edit a model in EXPRESS format and convert schema file in EXPRESS format. Using this model schema, STEP physical file containing design data for ship cargo hold data structure was generated through SDAI programming. The another STEP physical file was also generated containing geometry data of ship cargo hold which was extracted and calculated by SDAI and external surface/surface intersection program. The geometry information of ship cargo hold can be then transferred to commercial CAD system, for example, Pro/Engineer. Examples of the modification of the design information are also Presented.

  • PDF

The Aim to Provide Information of the Carrier for Dangerous Cargo in International Maritime Transportation (국제해상운송에서 위험화물에 대한 운송인 정보 제공 방법에 관한 연구)

  • Hwang, Ki-Sik;Jeong, Keum-Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.7
    • /
    • pp.881-888
    • /
    • 2019
  • Dangerous cargo in maritime transportation is increasing in international trade. The types and forms of dangerous cargo are very diverse, complex, and the scope is expanding widely. For this reason, it is increase risk of accident threatens the safety of ships and other cargoes, as well as serious damage. Carriers' require special care and handling of dangerous cargo and have a duty of care for safe transport. The shipper is obliged to notify the carrier of the nature and characteristics of the dangerous cargo prior to loading on the ship, the responsibility of the carrier varies depending on the notification or not. This study compares and analyzes the concept and classification of dangerous cargoes, the provisions of the Hague rules, Hamburg Rules and Rotterdam Rules about Carriers' Dangerous Cargo Liability Regulations, after reviewing case studies. We intend to provide information to dangerous cargo handling, the carrier.

Additional LNG Stations location problem for LNG cargo vehicle convert in Korea (LNG 가스 화물 차량전환 수요 변화에 따른 LNG 충전소 추가 건설 문제 연구)

  • Shin, Jae Young;Park, Jongwon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.79-81
    • /
    • 2012
  • The concern of Global warming and greenhouse gas emission has been issuing so many countries are trying to establish environmental friendly logistics policies. With this trend, several technical and operational methods are developed to realize green logistics way. In Korea, government promoted converting LNG cargo vehicles and constructed LNG station at Dajeon, Pohang, Gwangyang, Incheon, and Donghae as a national project. In spite of economic and environmental advantages, this project was not successful enough, even the project was cancelled. So, this paper seeks the reason why the project was failed and find if there were enough capacity and numbers of LNG stations, then analyze the problem.

  • PDF

Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port (부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석)

    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.313-322
    • /
    • 1999
  • Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

  • PDF

RUSSIA-NORTH KOREA-SOUTH KOREA: TOWARDS COOPERATION IN THE FIELD OF TRANS-KOREAN RAILWAY PROJECT

  • Sivokon, Vyacheslav V.
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.153-157
    • /
    • 2002
  • The improvement of the situation on the Korean Peninsula, following the June 2000 Summit, has opened up the possibility of reconstructing the railway between the North and the South. The interconnection of the railway systems would allow cargo transportation from the south of the Korean Peninsula to Russia, China and Europe. This could open up a faster and more economical cargo transportation route than the all-water route.(omitted)

  • PDF

The problems of the Asia-North America Container Routes - Los Angeles and Panama -

  • Rodriguez silva, Esther;Kubo, Masayoshi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.08a
    • /
    • pp.54-63
    • /
    • 2004
  • There are two principal routes for the Asia-North America containerized cargo, that of Asia-West Coast and Asia-East Coast. On the West Coast, the Asia-Los Angeles, dominate the commerce, whereas on the Asia-East Coast it's the Panama Canal. Each of these routes has different characteristics. All are similar in that each is the door to the commerce of containerized cargo originating in Asia; each combines maritime and overland transportation; each has important intermodal connections and is able to distribute cargo throughout the West and East Coasts of the United States. Each route also has its port of preference that has the necessary infrastructure, equipment and intermodal connections. For example, in the case of the Port of Los Angeles, in spite of some of its advantages, it has several serious problems due to the interminable containerized cargo traffic that must be solved rapidly and satisfactorily in order to progress. In this paper, we would like to show the problems of two main routes.

  • PDF

A Study on Status Analysis and Improvement of Heavy Cargo Logistics (중량물 물류 실태 분석 및 개선 방안에 관한 연구)

  • Park, Du-Seon;Lee, Cheong-Hwan;Choi, Kyung-Hoon;Park, Gyei-Kark
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.3
    • /
    • pp.35-52
    • /
    • 2017
  • Interest and demand in heavy cargo logistics is increasing and becoming more diverse as economic scales have expanded and manufacturing activity has increased. Although cargo moves via maritime and/or land transportation, there is currently insufficient research on the actual condition of heavy cargo logistics. The purpose of this study is to carry out an in-depth analysis of heavy cargo laws, systems, logistics patterns, and current transportation status. By proposing measures to solve existing problems, this study aims to make an important and ongoing contribution to the scarcely studied field of heavy cargo logistics. The result of regression analysis on the main seven factors show that transportation frequency and law/system structure have a positive effect on working conditions. Furthermore, the result of correlation analysis on the main seven factors show that the cargo weight variable is highly positively correlated with cargo size. Also, the working conditions variable is highly positively correlated with the law/system structure. Detailed proposal measures to solve existing problems are summarized as follows. First, it is necessary to establish a clear concept of heavy cargo as numerous existing definitions differ. Second, laws and provisions relating to maritime and land transportation of heavy cargo need to be established and consolidated as current applicable legislation is insufficient. Third, the classification system for heavy cargo transportation needs improvement. Fourth, it is necessary to improve transportation performance statistics and the aggregate criteria system. Finally, the management system of heavy cargo also needs improvement.

Implementation of Automatic Gate System under AVI/AEI (화물차량 및 화물 인식 중 자동 게이트 시스템의 구현)

  • Hong, S.B.;Hong, G.Y.;Lim, W.Y.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.12 no.2
    • /
    • pp.43-58
    • /
    • 2004
  • Up-to-date cargo transport system, CVO(Commercial Vehicle Operations) is the system to manage efficiently cargo distribution as providing at real time the information of cargo location and situation through ITS and GPS technology. In this paper, we proposed the Gate Automation System of harbors among AEI/AVI. To implement his system, we use the DSRC/RFID(Dedicated Short Range Communication / Radio Frequency IDentification) which adopts an wireless communication between RSE(Road-side Equipment) and OBE(on-Board Equipment) on a vehicle. When constructing the Gate automation system of harbors, the business application ability are reviewed practically and the logistics facilities to be constructed in the near future may use this project results according to the international standard and it could help complete integrated logistics system.

  • PDF