• Title/Summary/Keyword: Project Activity

Search Result 845, Processing Time 0.028 seconds

ENHANCING UTILIZATION OF BUILDINGS THROUGH INTEGRATED ANALYSIS OF SPACE, USER, AND USER ACTIVITY

  • Tae Wan Kim;Martin Fischer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.570-575
    • /
    • 2013
  • Enhancing utilization of buildings is gaining in importance in response to a challenging economy; thus, there is a need for a method that analyzes space, user, and user activity in an integrated way to provide project stakeholders with utilization information to support their decision-making about buildings. Conventional methods, such as architectural programming and post-occupancy evaluation, lack a formal relationship between user activity and other information, and therefore, are coarse-grained. This relationship has been formalized by two relatively new methods that provide fine-grained utilization information: workplace planning and space-use analysis. We characterize these two methods with focuses on their usage in different phases (i.e., planning, design, occupancy), required information that needs to be gathered, and the achievement and limitations in terms of three criteria, i.e., consistency, efficiency, and transparency. This characterization would not only help project stakeholders select and use a method that best meets their purposes for enhancing utilization of their buildings, but also provide researchers with promising research topics regarding enhancing utilization of buildings.

  • PDF

Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study- (연구과제 선정.평가 체계설계에 관한 연구)

  • 용세중;최덕출;한종우;정용훈;이원영
    • Journal of Technology Innovation
    • /
    • v.2 no.1
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

STOCHASTIC ACTIVITY NETWORKS WITH TRUNCATED EXPONENTIAL ACTIVITY TIMES

  • ABDELKADER YOUSRY H.
    • Journal of applied mathematics & informatics
    • /
    • v.20 no.1_2
    • /
    • pp.119-132
    • /
    • 2006
  • This paper presents an approach for using right-truncated exponentially distributed random variables to model activity times in stochastic activity networks. The advantages of using the right-truncated exponential distribution are discussed. The moments of a project completion time using the proposed distribution are derived and compared with other estimated moments in literature.

Synthesis of Novel 2'-Spirocyclopropanoid 4'-Deoxythreosyl Phosphonic Acid Nucleoside Analogues

  • Shen, Guang Huan;Hong, Joon Hee
    • Bulletin of the Korean Chemical Society
    • /
    • v.34 no.3
    • /
    • pp.868-874
    • /
    • 2013
  • Efficient synthetic route to novel 2'-spirocyclopropanoid 4'-deoxythreosyl phosphonic acid nucleosides was described from 1,4-dihydroxy-2-butene. Cyclopropane moiety was prepared via ester enolate alkylation using (2-chloroethyl)dimethylsulfonium iodide. Synthesized nucleoside analogues 16, 19, 23 and 26 were tested for anti-HIV activity as well as cytotoxicity. However, none of them showed any anti-HIV activity or cytotoxicity up to 100 ${\mu}M$.

Prediction/Investment Cost Analysis for korea High-Speed Railway System (한국형 고속전철 시스템의 추정/투입비용 분석)

  • Lee, Tae-Hyeong;Park, Chun-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

Modeling the Cardiac Na+/H+ Exchanger Based on Major Experimental Findings

  • Cha, Chae Young;Noma, Akinori
    • Molecules and Cells
    • /
    • v.28 no.2
    • /
    • pp.81-85
    • /
    • 2009
  • $Na^+-H^+$ exchanger (NHE) is the main acid extruder in cardiac myocytes. We review the experimental findings of ion-dependency of NHE activity, and the mathematical modeling developed so far. In spite of extensive investigation, many unsolved questions still remain. We consider that the precise description of NHE activity with mathematical models elucidates the roles of NHE in maintaining ionic homeostasis, especially under pathophysiological conditions.

A Field Study on the Loss Factors of IS Development Project in the Public Sector: Perspectives of Project Management (공공부문 IS 개발 프로젝트 손실요인에 대한 현장연구: 프로젝트 관리를 중심으로)

  • Jang, Sung-Bong
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.65-84
    • /
    • 2004
  • This research analyzes the causes of delay and resulting additional expenses on the IS project in the public sector, and then proposes some solutions to the problem. Through a field study, the research found that the causes include employer's attitude, the leadership and risk management ability of the project manager, and qualifications of project members. In order to avoid those problems, the project manager should secure various communication channels and good relationship between the employee and the contractor.

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

Fuzzy-MOEH : Resource Constraints Project Scheduling Algorithm with Fuzzy Concept (Fuzzy-MOEH : 퍼지 개념을 이용한 자원제약 프로젝트 스케줄링 알고리즘)

  • Koh, Jang-Kwon;Shin, Ye-Ho;Ryu, Keun-Ho;Kim, Hong-Gi
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.7 no.4
    • /
    • pp.359-371
    • /
    • 2001
  • Project scheduling under resource constraint conditions have contained to many uncertain factors and it is perfonned by human experts. The expert identifies the activities of the project, decides the precedent relationships between these activities, and then construct the schedule using expected activity's duration. At this time, most of the scheduling methods concentrate on one of scheduling factor between activity duration and cost. And the activity duration, which is the most important factor in scheduling, is decided by heuristic of expert. Therefore it may cause uncertainty of activity duration decision and the use of this activity duration may increase the uncertainty of constructed schedule. This paper proposes Fuzzy-MOEH scheduling algorithm, which is the aggregation of the fuzzy number for deciding activity duration and applies the cost function for solving the problems of previous scheduling methods. This paper also analyze the utility and property of Fuzzy-MEOH algorithm through the comparison between Fuzzy-MEOH algorithm and existing MEOH algorithm.

  • PDF