• Title/Summary/Keyword: Project

Search Result 19,681, Processing Time 0.041 seconds

A Study on the Effect of Project Sponsor Roles and Project Manager Competencies on the Project Performance Quality (프로젝트 스폰서 역할과 프로젝트 관리자 역량이 프로젝트 성과 품질에 미치는 영향에 관한 연구)

  • Yun, Gunsang;Yoo, Wangjin;Lee, Joonghwan
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.373-386
    • /
    • 2014
  • Purpose: This paper seeks to analyze the relationship between project sponsor roles and project manager competencies which may account for project performance quality. Methods: After an extensive literature review, the structural equation modeling was conducted test the research model. The data was collected from project manager training course attendees by the questionnaire. Results: The results of structural equation modeling show that project sponsor roles effect on project manager competencies. Project manager competencies have a positive effect on project performance quality. Conclusion: The authors demonstrate that project sponsor external roles are related positively to project performance quality. And project manager professionalism has a positive effect on project manager communication. A number of significant findings are reported including the empirical verification that project sponsor roles, and project manager competencies may all be directly related to project performance quality.

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

A Study on the Influence of SI Project Manager's Leadership Competencies and Project Participants' Individual Competencies on Project Performance (SI 프로젝트 관리자의 리더십 역량과 프로젝트 참여자 개인역량이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lee, Joong-Woo;Lee, Cheol-Gyu
    • Journal of Information Technology Services
    • /
    • v.21 no.4
    • /
    • pp.27-61
    • /
    • 2022
  • In order to improve project performance by analyzing the effects of the project manager's leadership competency and the individual competency of the project participants on the project performance, this study examines the effect. In this study, a research model and hypothesis were established to understand the causal relationship between leadership competency, individual competency, and project performance, and a survey was conducted based on this. Overall, it was found that the leadership competency of the project manager and the individual competency of the project participants had a positive effect on the project management performance, the project leadership competency had a positive effect on the completion performance, and the project participant individual competency had a negative effect on the completion performance. As a result of analyzing the effect of the project manager's core competency on the project management performance according to the amount or period of the project type, which is the moderating variable, it was found that there was no moderating effect on the management performance. For the success of the SI project, it is most important to understand the project characteristics well and select a PM suitable for the characteristics, and methods for nurturing excellent project managers should be further studied. In addition, it is expected that it will be possible to identify the effect of project manager leadership competency and participant competency on project performance based on sophisticated research design for more competent PM selection.

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

The Impact of Project Governance Factors on IT Project Objectives Performance (프로젝트 거버넌스의 구성요인들이 IT 프로젝트 목표 성과에 미치는 영향)

  • Jung-Soo Kim;Seung-Chul Kim;Hee Kyung Kim;Chang Won Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.241-250
    • /
    • 2023
  • Companies are paying attention to project governance to realize their goal strategies, project success, and project value in a rapid and complex environment due to the development of information technology. This study aims to explore project governance and factors from literature review and practice guides related to project governance and empirically analyze the impact of project governance factors on IT project objective performance. The survey was conducted on project managers, project team members, and project management members with experience in carrying out business IT projects within two years at companies in various industries in Korea. The main conclusion is as follows. Among the project governance factors, disclosure and reporting that uses and reports using appropriate and reliable information about projects related to decision-making activities positively impact the achievement of IT project objectives: business success and stakeholder satisfaction. Among the project governance factors, project sponsorship, a role that effectively connects management and projects, and a project management framework that provides tools, procedures, resources, and techniques for projects positively impact IT project objective performance. This study is of academic and practical significance in that it identifies the definition and factors of project governance through companies in various industries in Korea and the positive impact of project governance factors on IT project objective performance.

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

The Impacts of Project Governance, Agency Conflicts on the Project Success : From the Perspective of Agency Theory (프로젝트 거버넌스가 대리인 갈등 및 프로젝트 성공에 미치는 영향 : 대리인 이론 관점)

  • Jeong, Eun-Joo;Kim, Bo-Ram;Jeong, Seung-Ryul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.11-20
    • /
    • 2018
  • Recently companies have increased the new projects to improve and innovate the business process in order to adopt the advanced technologies such as IoT (Internet of Things), Big Data Analysis, Cloud Computing, mobile and artificial intelligence technologies for sustainable competitive advantages under rapid technological and socioeconomic external environmental changes. However, there are obstacles to achieve the project goals, corporate's strategy and objectives due to various kind of risks based on characteristics of projects and conflicts of stakeholders participated on projects. Hence, the solutions are required to resolve the various kind of risks and conflicts of stakeholders. The objectives of this study are to investigate the impact of the project governance, agency conflicts on the project success based on agency theory by using the statistical hypothesis testing the relationship among those variables. As a result of hypothesis testing, we could find that the project governance impacts positively on project success and negatively on the agency conflicts. Further, the agency conflicts impacts negatively on the project success. Finally, we could find that the agency conflicts such as goal conflict, different risk attitude and information asymmetry between project manager and team members impact negatively on the project success. Meanwhile, the project governance impact positively on the project success, negatively impact on the agency conflicts such as goal conflict, different risk attitude and information asymmetry between project manager and project team members. In order to increase the project success rate, the project governance institutions such as PGB (Project Governance Board), EPMO (Enterprise Project Management Office), PSC (Project Steering Committee) are needed to prevent or reduce the agency conflicts between project manager and team members.

CRITICAL SUCCESS FACTORS FOR PROJECT SUCCESS OF CONSTRUCTION PROJECTS BASED ON DIFFERENT PROJECT OBJECTIVES

  • Hamimah Adnan;Faridah Yusuf;Mohd Arphian Salleh
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.611-624
    • /
    • 2007
  • Every construction project expects a success. In order to attain success for every project involved, issues that are related to the success of a construction project must be identified. This paper identifies those key factors, which contribute to the success of construction projects. The main factors crucial to project success were identified from a literature review and through a questionnaire survey administered to local contractors. A follow-up interview was conducted to validate the first survey and to evaluate the perception of the local contractors. An Analytical Hierarchy Model was used to obtain the final Critical Success Factors. The identification of the critical factors related to the success of construction projects will contribute to the achievement of a particular objective which will accomplish the success of the project. Aspects that affect the success of the project are the project characteristic, contractual arrangement, parties involved in a construction project and finally, and the aspect of the project interactive processes.

  • PDF