• Title/Summary/Keyword: Progress Management System

Search Result 701, Processing Time 0.034 seconds

The research about RTPM system construction that apply use case modeling methodology

  • Eun Young-Ahn;Kyung Hwan-Kim;Jae Jun-Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.464-471
    • /
    • 2009
  • Robot and application of IT skill of construction industry are slow comparatively than another thing industry by the feature. This research proposes progress management and real time information gathering through construction automation and RFID focused on steel structure construction. Building for RTPM system, must consider various variables and surrounding situation in construction field and it is the most important and difficult matter that draw right requirement and grasp relation between this requirements to accomplish one suitable task considering these environment. Therefore, in this study analyzes requirement and target for RTPM system based on scenario that is easy to draw requirement and apply this to use case model. Presented method suggests that represent relation between goals and way that refines goal systematically from requirement of RTPM system. And it could express for visualization through the Way that attaches nonfunctional elements of system with system internal goal.

  • PDF

A Small and Medium Enterprises Sized Project Performance Management System in Management Information System Environment (MIS 환경에서의 중소기업형 프로젝트 성과관리 시스템)

  • Kim, Seok-Hun;Jung, Jin-Young;Ahn, Woo-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.13 no.6
    • /
    • pp.964-970
    • /
    • 2009
  • In this paper, according to the company's business objectives through the execution plan of project-specific progress and to achieve effective management of performance management in conjunction with a project management system can be developed. Goal-based Medium Enterprises Sized project performance management system eophyeong advancement of the strategic project management and corporate performance management for the systematic integration and implementation of an individual were to be applied. Organizations to perform a systematic strategy to manage the administration transparent, objective, you evaluate, say he reflects the integration and implementation of management systems between organizations and the unit responsible for the detailed performance indicators and grant to refine your business can benefit there is.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

Technological Innovation System for Energy Transition in Small Island Developing States: Adaptive Capacity, Market Formation and Policy Direction in the Maldives

  • Mohamed, Shumais
    • Asian Journal of Innovation and Policy
    • /
    • v.11 no.3
    • /
    • pp.293-319
    • /
    • 2022
  • By analyzing the adaptive capacity, market formation and policy direction as functional areas of Technological Innovation System (TIS), the article evaluates the progress of renewable energy transition in the Maldives, with the inclusion of ideas from Mauritius and Cabo Verde. On the policy direction in the Maldives, technology roadmaps produced with assistance from International Renewable Energy Agency (IRENA) and Asian Development Bank (ADB) are evaluated. Although there are inducing factors such as the Solar Risk Management Initiative, the progress of energy transition is hindered by the lack of technical capacity and local value chain. The findings indicate the importance of facilitating and establishing industry and knowledge networks, incorporating innovation policies, greater involvement of the local private sector along with international investors, and taking water-energy nexus to achieve complementary targets. The study adds value to knowledge by offering a simplified TIS framework, with a current insight of the energy transition in Small Island Developing States with a focus on the Maldives.

A Study on the Field Application and Prospect of Artificial Intelligence and Bio-Sensing Technology in Physical Therapy: Focusing on Customized Rehabilitation Treatment (물리치료 분야에서 인공지능 및 바이오센싱 기술의 현장적용 및 전망에 관한 연구: 맞춤형 재활치료를 중심으로)

  • Kyung-Tae Yoo
    • Journal of the Korean Society of Physical Medicine
    • /
    • v.18 no.3
    • /
    • pp.73-84
    • /
    • 2023
  • PURPOSE: This study analyzed the impact of AI and biosensors on physical therapy, identifying the stage of customized technology development and future prospects. AI and biosensors improve the efficiency, establish customized treatment plans, and expand patient treatment opportunities. The study employed a literature review by searching databases and collecting research. METHODS: This study searched various databases related to the topic, collected existing research, papers, and reports, evaluated the literature, and summarize the results. RESULTS: Exercise therapy utilizing artificial intelligence can provide personalized and optimal exercise plans while monitoring rehabilitation progress. In addition, biosensors such as EMG sensors and accelerometers can monitor the individual progress in physical therapy, particularly in stroke patients, which can help improve physical therapy strategy and promote patient recovery. CONCLUSION: This study suggested that artificial intelligence can be applied in many areas of physical therapy, such as exercise therapy, customized treatment plans, rehabilitation and management, pain management, neuro rehabilitation, and auxiliary devices. Using AI technology, it is possible to analyze and improve exercise and posture, retrain the central nervous system, establish customized treatment plans for individual patients, predict and compare patient progress before and after treatment, and provide customized pain analysis and treatment methods. In addition, AI can provide neuro rehabilitation programs and customized auxiliary devices.

New Naming Service Architecture for Limited Resource System within CORBA-based Network Management (CORBA 기반 망 장비를 위한 새로운 Naming Service)

  • Joon H, Kwon;Moon S, Jeong;Park, Jong T.
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.187-189
    • /
    • 2000
  • Nowadays, efforts are in progress for the standardization of CORBAbased telecommunication network management framework. To implement a network management system based on the framework completely, CORBA ORB and some of CORBA service should be installed in the element. And then, there must be the naming tree, which correspond to the containment relationships between components in the network element. If we use conventional OMG naming service to form the naming tree, all MOs, a software fragmenthat corresponds to each component in a system, should be instantiated. However, the network element is usually a kind of limited resource system, which cannot provide sufficient resources for applications run on it. Hence, instantiatingall MOs can cause problems for that kind of system, This paper presents Smart Naming Service architecture as a solution to the problem.

  • PDF

The Current technology state of "Supervisory Control And Data Acquisition System(SCADA)" and development plan in the city-gas industry (긴급제언 - 원격감시제어시스템의(SCADA) 기술현황과 도시가스산업에서의 발전방안)

  • Choi, In-Hwan
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.3
    • /
    • pp.28-33
    • /
    • 2010
  • The related industrial technologies are also being developed in medicine, education, the military, transportation, process management, security management and information technology industries due to a rapid progress in telecommunications technology. The supervisory remote control system is based upon telecommunications technology. The supervisory remote control systems are used in various ways such as city gas, water supply and drainage, environment, power, communication and device control fields. The supervisory remort control system became a solution with complex systems and important technologies in electricity, city gas filed that require safety management skills. The supervisory remote control system as a special technology has a lot of practical applications. In this paper, Let me examine the present status of remort control system applications and present development plans and alternatives in city-gas industrial technology.

  • PDF

Monitoring and Scheduling Methods for MIMO-FIFO Systems Utilizing Max-Plus Linear Representation

  • Goto, Hiroyuki;Masuda, Shiro
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.1
    • /
    • pp.23-33
    • /
    • 2008
  • This paper proposes an approach to monitoring and scheduling methods for repetitive MIMO-FIFO DESs. We use max-plus algebra for modeling and formulation, known as an effective approach for controller design for this type of system. Because a certain type of linear equations in max-plus algebra can represent the system's behavior, the principal concerns in past researches were how to solve the equations. However, the researches focused mainly on analyses of the relation between inputs and outputs of the system, which implies that the changes or the slacks of internal states were not clarified well. We first examine several properties of the corresponding state variables, which contribute to finding and tracing the float times in each process. Moreover, we provide a rescheduling method that can take into account delays or changes of the internal states. These methods would be useful in schedule control or progress management.

FEASIBILITY OF A RFID-BASED MONITORING SYSTEM FOR THE CONCRETE POUR PROCESS

  • S. W. Moon;S. M. Hong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.433-439
    • /
    • 2007
  • A ubiquitous environment in construction requires integrating hardware and software systems. Currently the Construction System Integration Lab (CSIL) at Pusan National University is currently studying the application of ubiquitous technology for better communication in the construction process. In this paper, a pilot of Ubiquitous Concrete Pour System (u-CPS) has been presented to demonstrate the effectiveness of data exchange in the concrete pour process. The u-CPS environment takes advantage of the RFID technology for collecting construction data. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

  • PDF

A Study on 4D CAD and GIS Integrated System for Process Risk Management Model (4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Yun, Seok-Heon;Paek, Joon-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.