Journal of Korean Society of Industrial and Systems Engineering
/
v.26
no.3
/
pp.24-30
/
2003
As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSM evaluation method in the construction. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges. Boost of safety control system by PSM method could make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
Proceedings of the Safety Management and Science Conference
/
2000.05a
/
pp.9-26
/
2000
Eventually so as to realize the construction safety, 1 found out the cause of accident and specificities of the construction industry. This study presented to several situations and problems on construction safety. As a result of this study, the below matters must be improved for more effective the construction safety management system. 1. It need to introduce the total construction safety management system. Because there is not effectiveness in the current safety management to the first on the construction field. a. We must consider the safety in the whole parts of the process of the construction and constructors of each part must devide responsibility of the construction safety as a CDM(The Construction Designed Management) used in UK. b. It is desirable to proceed control of safety in the whole parts of the construction to introduce the total safety coordinator that can consult the matters of safety as a law accepted in EU. c. Like management of the construction safety in USA, direction of the construction safety must be made to work exactly by code or manual. d. To improve the organization of the construction safety on the construction field unefficient, it must be introduced safety supervisor, safety coordinator or institutionalization of safety consultant. 2. The law of the construction safety not only have wasteful element but also decrease efficiency by overlapping of regulation, The Ministry of Labour and The Ministry of Construction & Transportation, So laws related with safety must be instituted. a. To realize total safety management, The Ministry of Labour must legislate the basic law about safety management in whole field. b. To legislate the construction safety under one law, and improve efficiency of the overlapping of regulation and the similar law by The Ministry of Construction & Transportation. c. It must be made the law of construction safety that can proper to change of situation in construction. d. The standard of safety must be instituted belong to international level and improved by year. e. We must improve irrational regulation to realize activity of safety self regulating for progress competition in construction industry
Journal of the Korean Society of Systems Engineering
/
v.7
no.2
/
pp.7-11
/
2011
A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.
Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.3
/
pp.83-91
/
2017
Climate change has been identified as one with the greatest challenges facing nations, government, business and over future decades. Activities to reduce greenhouse gas emissions by the Kyoto Protocol, the international community has been in progress. Korea also has introduced the Emission trading system to reduce greenhouse emission from the supervision of the government. Greenhouse gases emissions quantity should be internationally recognized. Mutual Recognition Arrangement should be recognized as the same greenhouse gas emission. International recognition of domestic verification body of international mutual recognition is required. Efforts are needed to secure the equivalence between the emission rights through direct cooperation with the relative nation accreditation body. Early entry into the IAF/PAC GHG MLA is essential for demonstrating equivalence between greenhouse gas emissions. Emissions trading will also require connection to the EU ETS, California, USA, and Tokyo, Japan to link Emissions trading. In the case of establishing accreditation standards and accreditation criteria, it will be necessary to distinguish between the domestic Energy Target Management System and the Emission Trading System. Independent greenhouse gases verification bodies should be established to meet the requirements of IAF and PAC. It is necessary to revise the qualification criteria for the verification of the greenhouse gas verification body according to international standards requirements. It is necessary to support the role of accreditation bodies of domestic greenhouse gas verification bodies. It is required to join international organizations of international mutual recognition of international trade and the need for pilot projects to link greenhouse gas emissions. The core link to our emission trading system is called EU-ETS, and we will need to join the IAF/PAC GHG MLA GHG. The International Mutual Recognition Agreement (IAF) is expected to allow international interoperability of GHG emissions verification between EA and the PAC. By signing a PAC GHG MLA, it will need to be prepared to prepare for the pilot project to link the emission trading system.
Kim, Dong-won;Han, Keun-hee;Jeon, In-seok;Choi, Jin-yung
Journal of the Korea Institute of Information Security & Cryptology
/
v.25
no.4
/
pp.793-805
/
2015
Due to the rise of automotive security problems following automotive safety and the progress of the internet technology leading to a hyper-connected society, guaranteeing the safety of automotive requires security plans in the supply chain assurance and automotive software, and risk management plans for identifying, evaluating, and controlling the risks that may occur from the supply chain since the modern automotive is a Safety Critical system. In this paper, we propose a study on Automotive Supply Chain Risk Management (A-SCRM) procedures by person interested within the automotive Life-Cycle.
International conference on construction engineering and project management
/
2009.05a
/
pp.1515-1520
/
2009
Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.
International conference on construction engineering and project management
/
2020.12a
/
pp.30-37
/
2020
In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.
Korean Journal of Construction Engineering and Management
/
v.6
no.6
s.28
/
pp.181-192
/
2005
Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.
Journal of the Korea Institute of Information and Communication Engineering
/
v.26
no.5
/
pp.802-807
/
2022
In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.
Journal of Korean Society of Industrial and Systems Engineering
/
v.33
no.4
/
pp.114-121
/
2010
Traditionally Nuclear Research and Development (R&D) result has been big influence on other industries and societies and it requires large scale investments and study period. So it is essential to apply Quality Assurance (QA) for systematic R&D management. This paper investigates QA System for U.S. Nuclear R&D and reviews QA elements. Based on this investigation, we applied QA requirements to Nuclear Hydrogen R&D project, and the scope of application be enlarged as R&D stage in progress. We also present QA system improvement way through consideration for Nuclear Hydrogen Project's QA application. As the need for QA in R&D is expected to increase in the future, it is necessary to prepare guidelines for R&D QA.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.