• Title/Summary/Keyword: Progress Management System

Search Result 701, Processing Time 0.032 seconds

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

VRML based Realtime RFID+4D Progress Management System Development (VRML기반 실시간 RFID+4D 진도관리 시스템 개발)

  • Park, Jae-Hyun;Yoon, Su-Won;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.99-102
    • /
    • 2010
  • Today's construction is higher and more complex. So types and amounts of needed materials for construction project are increasing and those are occurred problems in construction site such as insufficient working space, confusion of materials handling order and working circulation. Because of those problems, research of progress management system using RFID+4D has been studied, but it is impossible to manage progress and material statement in real-time. So this study analyzed problems of current research and suggested VRML based RFID+4D Progress Management System. This Study focused on system basic concept and interface is designed for system development. This research is still progressing, so it has to do more development and research. However, it could be expected construction management efficiency and automation of management tasks.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

A Study on Simulation Method for Progress Management in Railway Structures (철도 시설물의 진도관리를 위한 시뮬레이션 기법 연구)

  • Kim, Hyeon-Seung;Park, Nam-Jin;Seo, Hwa-Jin;Kim, Chang-Hak;Shin, Min-Ho;Kang, Leen-Seok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1513-1517
    • /
    • 2010
  • Recently, the important of Progress Management is being emphasized because construction have become more complex and increasingly specialized. The existing progress control method needs to be changed because only numerical information is being provided and is very difficult to understand all poor progress. To resolve these problem, this study suggests a simulation method for progress management by using 4D CAD System because 4D CAD system has effective functions to convert numerical information to visualized information. The suggested simulation method not only are reviewed an application of railway construction but enables managers to understand problems in managing this system for verifying the suggested simulation method.

  • PDF

Automated Progress Measurement and Management using Face Recognition (안면인식(Face Recognition)을 활용한 진도관리 자동화)

  • Kim, Namjoon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF