• Title/Summary/Keyword: Productivity management

Search Result 2,563, Processing Time 0.032 seconds

The study for effective insertion path of PCB surface mounting machine (PCB부품 자동삽입기의 효율적 삽입경로에 관한 연구)

  • 문기주;윤상섭;김상현
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.141-147
    • /
    • 2000
  • For miniaturization of electronic parts and higher productivity, part arrangement job of PCB(printed Circuit Board) has been replaced with complete automated facilities, and contribution which is concerned about this will be expanded continuously. Such part arrangement job of PCB could have lots of influences to entire productivity In this paper, effective grouping method of parts is suggested for the effective insertion path job of PCB concerning the constraints to the size of parts.

  • PDF

A Study for Productivity Progress of Assembly Process Improvement for manu/auto open and closed type air-machine (수/자동 개폐식 환풍기 조립공정개선을 위한 생산성 향상에 관한 연구)

  • 정영득;박주식;오지영;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.107-116
    • /
    • 2001
  • The purpose of this paper is to solve the problem that is occuring in assembly process and to progress the productivity by process analysis methods for manu-open and closed model(DWV-20/25DRG), and auto-open and cloesd model(DWV-20/25/DRA)-ventilation fan. Also, this paper is studied by data of 'D' company's product.

  • PDF

A Study on Application Method of GT (GT기법의 적용항법에 대한 연구)

  • 이현용;이승우;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.2
    • /
    • pp.139-153
    • /
    • 2000
  • To develope a domestic machinery industry, international competition through reducing cost by increasing productivity is as important as evolving technology and increasing quality. In this study, we have studied in application of GT technology. GT is a skill that acquires high productivity using part's resemblance for multi part and small size production like mass production. We have classified group, such as design, layout and the others, to be applied systematically. The design group includes retrieval for drawings and study for GT design. The layout group includes GT layout, analysis of production process and study for composition method. And others include scheduling, standardization and standard process.

  • PDF

Managing maritime automobile terminals: an approach toward decision-support model for higher productivity

  • Beskovnik, Bojan;Twrdy, Elen
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.3 no.4
    • /
    • pp.233-241
    • /
    • 2011
  • The article describes actions and strategies to obtain higher productivity on maritime automobile terminals. The main focus is on elaboration of efficient and effective organizational structure to model and implement short-term, mid-term and long-term strategies. In addition, with an empiric approach we combined the analyses of current findings in important scientific papers and our acknowledgments in practical research of north Adriatic maritime automobile terminals. The main goal is to propose actions towards increasing system's productivity. Based on our research of the north Adriatic maritime automobile terminals and with Lambert's model an in-deep analysis of limiting factors, user's expectations and possibilities for productivity increase has been performed. Moreover, with our acknowledgments a three-level decision-support model is presented. With an adequate model implementation it is possible to efficiently develop and implement different strategies of productivity measurement and productivity increase, especially in the fields of internal transport productivity, entrance/exit truck gates operations and wagon manipulations. According to our observation a significant increase might be achieved in all three fields.

The Relationship between Carbon Productivity and Economic Performance : An Empirical Analysis (탄소생산성과 경제적 성과의 인과성에 관한 실증연구)

  • Yook, Keun-Hyo
    • Journal of Environmental Policy
    • /
    • v.9 no.3
    • /
    • pp.47-67
    • /
    • 2010
  • Carbon productivity is an efficiency concept, well suited to maximizing product/service(economic) value of firms and minimizing environmental impact($CO_2$ emissions). This study investigates the causal relationship between carbon productivity (eco-efficiency) and financial performance in Korean firms. The result shows that firms improving carbon productivity are able to gain superior financial performance. The analysis also show that changes in financial performance have a positive impact on the improvement of carbon productivity. However this study reports that carbon productivity does not have a long-run impact on financial performance and vice versa. Finally, the results also show that differences exist in the relationship between carbon productivity and financial performance when grouped by industry characteristics.

  • PDF

Productivity Analysis for Multi-Wells Depressurization of Gas Hydrate Bearing Sediments in Ulleung Basin, East Sea of Korea (동해 울릉분지 가스하이드레이트 퇴적층 내 다중정 감압에 따른 생산성 분석)

  • Moon, Seo-Yoon;Shin, Hyo-Jin;Lim, Jong-Se
    • Ocean and Polar Research
    • /
    • v.43 no.4
    • /
    • pp.295-306
    • /
    • 2021
  • A field scale productivity analysis is required for the development of gas hydrate in marine sedimentary layers to verify the field applicability of production techniques and to improve productivity. In this study, the productivity resulting from the application of depressurization using multi-wells for the development of gas hydrate in the Ulleung Basin, East Sea of Korea, was determined. A numerical analysis model reflecting the conditions of candidate sites for the Ulleung Basin was constructed, and the productivity and dissociation behavior were comparatively analyzed. The pressure propagation and gas hydrate dissociation region by the multi-wells were wider and the productivity was higher than that of a single well. Different depressurization effects according to the spacing of multi-wells affected productivity. The results provide basic data for productivity analysis when establishing a field test production plan for the Ulleung Basin.