• Title/Summary/Keyword: Productivity management

Search Result 2,569, Processing Time 0.033 seconds

Case Study on the Jeollabuk-do Local Water Supply Efficiency by using DEA and Malmquist Index (DEA 및 맘퀴스트 지수를 이용한 전라북도 지방상수도 효율성 사례분석)

  • Choi, Kyoung-Ho;Cho, Jung-Keun
    • Journal of Digital Convergence
    • /
    • v.12 no.12
    • /
    • pp.571-580
    • /
    • 2014
  • Korea's water supply efficiency is low, due to weak industrial structure, such as small scale, regional disparities in the management and services, unreasonable problem in a use and management of interregional water resources. This study investigated changes in the productivity of Jeollabuk-do local water supply service by using analysis of efficiency by data envelopment analysis and Malmquist Index Analysis. As a result, 6 office is showed that the value of scale efficiency is 1 and productivity index per gun in mainly seemed below average. Therefore these offices should strive to increase their productivity. This study is differentiated from earlier studies in the aspect of measuring change of productivity by not only DEA but also Malmquist productivity analysis. Therefore it will contribute to increase productivity of water supply in Jeollabuk-do.

Productivity Obstacle Factors Analysis For The Overseas Chemical Plant Utilizing The Revised IPA (수정 IPA를 활용한 해외 화공플랜트 생산성 저해요인 분석)

  • Jeon, Woo-Geun;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.17-26
    • /
    • 2017
  • The total amount of overseas plant orders obtained by Korean construction companies in 2015 decreased by approximately 51% from the previous year. While a chemical plant sector has the highest portion of the plant orders by accounting for 63% of the plant industry, its orders also decreased by approximately 43% in the same year. Recently, plant construction companies in overseas projects have been dominating the engineering sector owing to their advanced technology, experience, and accumulated knowledge. Therefore, measures must be taken to secure the competitiveness of domestic companies in the global plant industry. Especially, productivity management is an important issue to strengthen the national competitiveness with the development of construction technology. As the productivity influences long term growth, we analyze productivity obstacle factors by using the revised IPA, a technique to measure attribute importance and performance. With the identified factors, we suggest improvement plans and measures to enhance productivity of overseas chemical plant projects. This study will help the companies to come up with medium and long term measures by discussing results and implications it provides.

Timber Loading Productivity of Remote Controlled Forestry Equipment Through Image of Monitor (모니터 영상을 통한 원격제어 임업용 장비의 원목상차작업 생산성)

  • Choi, Yun-Sung;Cho, Min-Jae;Oh, Jae-Heun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.3
    • /
    • pp.363-371
    • /
    • 2021
  • Forest operations like timber harvesting have already been mechanized to reduce hazards to the worker and increase productivity. However, timber harvesting operations have still been considered potentially dangerous and expensive on steep terrain. Teleoperation, to control the timber harvesting machine at a distance, has the potential to improve the safety, productivity and efficiency of harvesting operations on steep terrain. To verify the effects of teleoperation, an experimental prototype system of a monitor image-based teleoperation was constructed using a real forestry machine. In this study, the productivity of excavator based grapple loader, which is one of the most used mechanized harvesting equipment in the timber production, was analyzed using time-study method. Factors like skill and age of operators, influencing loader productivity in timber loading operation were also evaluated by statistical analysis. Productivity analysis results showed that less experienced operators were more productive than experienced operators for teleoperation through image of monitors in the operator cabin. These results are shown to be unfamiliar to the monitor image and different loading operation pattern by operators. According to the results, the monitor image-based teleoperation system of forestry machine need to improve the resolution and installation position of camera. It was expected that additional studies will be needed for real-time remote control of forestry machine in the future.

Medical Care Environment and the Productivity Change in Korean Tertiary Hospitals. (Malmquist 생산성 지수를 이용한 종합전문요양기관의 생산성 변화 분석)

  • Kim, Young-Hee;Cho, Woo-Hyun;An, Dong-Hwan;Park, Sang-Woo;Chung, Woo-Jin
    • Korea Journal of Hospital Management
    • /
    • v.10 no.4
    • /
    • pp.51-74
    • /
    • 2005
  • This paper presents an analysis of the current status of domestic hospital industry which went trough the time of new hospitals operated by chaebols from 1994 to 2003 and the dramatic changes of medical service environment such as IMF relief loan in 1997 and the separation of prescription and dispensing (SPD) in 2000. For the sake of righteous policy-making in the future, this paper presents a productivity analysis of the management and administration of 38 tertiary hospitals nationwide in the past 10 years. The analysis is based on the Malmquist index approach using linear programming. d prepare a productivity index that measures not merely efficiency but the technological evolution and adjustment to changing environments.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

An Analysis of Nurse's Perception of Internal Marketing Activities Affecting on Nurse's Turnover Intention, Nursing Task Performance and Nursing Productivity (간호사가 지각하는 내부마케팅활동 정도가 간호사의 이직의도, 간호업무수행 및 간호업무생산성에 미치는 영향)

  • Doo, Eun-Young;Seomun, Gyeong-Ae;Kim, In-A;Lim, Ji-Young
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.11 no.1
    • /
    • pp.1-12
    • /
    • 2005
  • Purpose: The purpose was to analyze the effects of internal marketing activity factors on nurse's turnover intention, nursing task performance and nursing productivity. Methods: The subjects were 355 nurses who were working at the 3 universities hospital over 1 year. The instruments were used of internal marketing activity factors(Lee, 2001), turnover intension(Lee, 1995), nursing task performance(Park, 1988) and nursing productivity(McNeese-Smith, 1996). Results: The mean score of internal marketing activity factors was 2.79, education and training 2.97, individualization 2.93, communication 2.87, promotion 2.76, work environment 2.63, reward system 2.62, and management vision for employee 2.61. The turnover intention was 3.12, nursing task performance 3.49, and nursing productivity 3.38. The internal marketing activity factors were negatively correlated with turnover intention(r=-0.37, p<0.0001), and positively correlated with nursing task performance(r=0.29, p<0.0001) and nursing productivity(r=0.30, p<0.0001). The key predictor of turnover intension was reward system, education and training, communication, and salary. They explained 35.0% of the total variance. In nursing task performance, communication, management vision for employee, salary and unit explained 26.0% of the total variance. In nursing productivity, communication, reward, education and training, salary, and position explained 24.0%. Conclusions: To increase nurse's nursing task performance and nursing productivity and to decrease turnover intention, it is necessary to concentrate on improving communication and reward system in the internal marketing activity factors. Through these activities, the effectiveness of internal marketing strategies will be enhanced and finally, nursing organizational outcome will be increased.

  • PDF

The Influence of Trade and Foreign Direct Investment on Green Total Factor Productivity: Evidence from China and Korea

  • Li, Kan-Yong;Gong, Wen-Chao;Choi, Beak-Ryul
    • Journal of Korea Trade
    • /
    • v.25 no.2
    • /
    • pp.95-110
    • /
    • 2021
  • Purpose - This paper intends to conduct theoretical analysis and empirical test on the action mechanism of South Korea-China trade and South Korea's FDI to China on green total factor productivity, so as to provide a new perspective and ideas for the improvement of China's green total factor productivity and promote the high-quality development of China's economy Design/methodology - This paper uses the data of 30 provinces, autonomous regions and municipalities in China from 2004 to 2017 as the research sample, adopts the GML index method of SBM Directional Distance Function to measure GTFP, and analyzes the influence of South Korea-China trade and FDI from South Korea on China's GTFP. Findings - Trade is conducive to promoting technological progress, which has a significant promotion effect on China's green total factor productivity. While FDI has a significant inhibitory effect on China's green total factor productivity, which verifies the "pollution haven" hypothesis. In addition, such influence has certain regional overall heterogeneity. Trade has a more significant promoting effect on GTFP in eastern coastal areas, while FDI has a more significant inhibitory effect on GTFP in central and western inland areas. The interaction between trade and FDI is conducive to the improvement of green total factor productivity, indicating that the benign mechanism of trade and FDI has been formed. Urbanization, industrial structure, human resource level and investment in science and technology are all conducive to the improvement of GTFP. Originality/value - Through theoretical analysis and empirical test on the action mechanism of South Korea-China trade and South Korea's FDI on green total factor productivity, this paper provides a solid theoretical foundation for the further development of China-South Korea economic and trade cooperation in the future.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF