Construction labor productivity, which is the greatest source of variation in overall construction productivity, is the critical factor for determining the project performance in terms of time and cost, especially during scheduled overtime when extra time and cost are invested. The objective of this research is to select an appropriate type of probability distribution function representing the variability of daily labor productivity during overtime. Based on the results of statistical data analysis of labor performance during different weekly work hours, lognormal distribution is selected in order to take advantage of easiness of generating correlated random numbers. The selected lognormal distribution can be used for development of a simulation model in construction scheduling, cost analysis, and other applications areas where representation of the correlations between variables are essential.
Journal of Construction Engineering and Project Management
/
제5권1호
/
pp.40-46
/
2015
This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1140-1147
/
2009
Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.
The purpose of this study is to reform the productive industrial relations in hospital. Because the industrial relations of hospital is antagonistic each other and this problem cause a low productivity. In Korea, hospitals maintain their ownership structure, strategy is controlled by government, short process of management, and culture of grade. The executive of hospital doesn't gain the confidence of union. This circumstances is related with the antagonistic industrial relations. This research is to analyze hospital management system through experiential and literature study, and is to present a reform strategies for cooperative industrial relations of improving productivity in hospital. As a results, if the hospital manager hopes to improve productivity, they should introduce expert management system rather than ownership and management system. And it is need to execute the hospital initiative strategy rather than to depend on the government. Moreover, the hospital can achieve productive industrial relations as a middle-long term visions in management process and horizontal organization culture. Although this study is limited by literature research, it will contribute to settle productive industrial relations in hospital and to accomplish the additional study.
The Korean society faces a new issue of accepting foreign workers. Foreign labors in construction industry reached about 400,000 recently. Thus they have become one of the essential resources to fill up insufficient labor supplies in construction industry. And it is important how to manage foreign labors efficiently. However there are few studies focused on this subject. Purpose of this study is to research productivity of foreign labors in the domestic construction site. So investigate the value of foreign labors. Also this study forecast elements effect on foreign labors productivity in the construction industry. And research what element is more important to improve productivity and what element is more difficult to manage. In the result, this study is expected to prospect effective method of foreign labor's management in the domestic construction industry, so contribute to utilize foreign labors more efficiently.
Journal of Information Technology Applications and Management
/
제27권1호
/
pp.1-13
/
2020
This study aims to measure the efficiency and productivity change of 30 domestic construction companies from 2010 to 2018 using data envelopment analysis(DEA) and Malmquist productivity index (MI). In particular, we used the number of employees, capital stock, and non-current assets as input variables, and sales and net income as ouput variables for the analysis. The dataset used for the analysis of efficiency and productivity changes is the employee profile and financial statements for the companies from 2010 to 2018. We found that the MI of the 30 companies is greater than one since 2013. This is because many years of TEC (Technical Efficiency Change) is greater than 1, which means that the productivity index increases as the TEC increases. In addition, the MI value was less than 1, which lowered the productivity of construction firms in 2018. The results of the study may help decision makers to find effective future management plans by analyzing the internal and external factors.
최근 건설시장의 경쟁이 치열해지고, 건설생산성을 향상시키는 것이 기업의 경쟁력 확보라는 인식이 높아짐에 따라 건설업에서도 생산성과 효율성에 대한 관심의 풍요도가 증대되고 있다. 본 연구에서는 기존의 생산성 측정 방식을 활용한 사례조사를 통해 생산성을 측정하고 측정된 내용에 근거하여 작업개선사항을 제시하였다. 제안된 개선사항은 시뮬레이션(simulation)기법을 동해 검증하였다. 본 논문의 의의는 생산성 측정을 분석하는데 있어 시뮬레이션 기법이 현장여건을 모두 고려한 최적의 대안은 아니지만 현장관리자로 하여금 상황에 적합한 최적의 작업방식을 선택하게하고 생산량을 예측할 수 있는 방법을 제시했다는 점에 있다.
최근 국내 건설 산업에서 생산성과 건설공기 측면에서 문제점이 드러나고 있으며 또한, 국내 건설 산업의 생산성과 공기 경쟁력이 선진국에 비해 매우 낮은 것으로 분석되었다. 여기에 주5일 근무제가 시행된다면 문제는 더 심각해진다. 또한, 현재 입법 예고된 후분양제도가 실행된다면 건설사 입장에서는 공기 단축을 위한 생산성 향상이 건설업의 생사가 달린 일이다. 이에 본 연구에서는 생산성 향상을 위한 방안으로 PC의 한 종류인 건축 외관용 PC를 제시하고, 건축 외관용 PC를 사용하는 방안을 기존의 공법과 비교를 통해 생산성이 향상 되는가를 분석하고자 한다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.142-146
/
2015
Human resources development is considered a critical issue for improving productivity of workers in construction industry. The aim of this study is to identify and rank the key motivating factors that impact skilled workers productivity according to their relative importance. A total of 27 factors were identified through a literature review, which were categorized into 2 group financial and un-financial motivators. A questionnaire instrument was adopted in this study. The study revealed that the most significant group which affected skilled workers' productivity in construction projects was financial group with the recognition of the un-financial group importance. The results emphasized that the financial group has an edge over the un-financial group which reflect the priority of need for the respondents. The results indicated that the un-financial group represents a backbone in its importance after the financial group which reflects that un-financial factors can improve productivity. The findings showed that the provision of companies to safety conditions factor such as protective safety clothing and protective equipment was ranked very low by the respondents. This is due to the dominant culture of the workers as well as the lack of their awareness regarding their own safety and lack of companies' interest in safety and health for workers. Construction companies are advised to take the key motivating factors obtained from the results of this study into serious consideration in order to improve the satisfaction of their workers and improve their productivity.
In order to increase the productivity of the logistics center and transportation, we try to articulate the priority ranking factors of the productivity influenced by the personality of the field workers (logistics center workers) and functional workers (drivers) via the AHP technique Individual personality was studied by applying the Big 5 model of psychological factors (openness, Conscientiousness, extroversion, Agreeableness, neuroticism). In this paper, extraversion was critically analyzed as a priority factor. A trait of extroversion is a strongly active and individual personality. In this study, the field workers are logistics center workers and the functional workers are drivers. They are interactively influenced in the In & Out operation. For example, when it comes to 'up and down work' and 'inspection work', the functional workers perform 'up and down work' and 'delivery work' and the field workers perform 'inspection work'. Stressing on the respective work has an affect on work productivity. Inspection workforce has something to do with inventory management. Functional workforce affects the delivery workforce. Delivery work is positively correlated with customer satisfaction. Nevertheless, as a result of research, extrovert personality that has something to do with an energetic activity would not affect on the implementation of their operation. In addition, personal extraversion of workers and drivers in the warehouse can have a significant impact on job commitment and productivity improvement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.