• 제목/요약/키워드: Production worker

Search Result 222, Processing Time 0.024 seconds

A Study of Industrial Patients from Selected General Hospitals in the Kyung Pook and Taegu City Areas (일부지역 산업재해환자 실태 연구 -대구, 경북지역 일부 종합병원 중심으로-)

  • 허춘복;남철현
    • Journal of Environmental Health Sciences
    • /
    • v.17 no.2
    • /
    • pp.78-94
    • /
    • 1991
  • The purpose of this study is to research the actual conditions of industrial accident patients and to produce worker satisfaction and a rational and effective counter measure pain. Direct interviews with 179 cases (in and out patients) were carried out during a three month period from April to July 1990, at six hospitals two general hospitals Sun Lin and Sung Mo in Po Hang, and four general hospitals in Taegu Kyung Pook University Hospital, Dong San Medical Center, Young Nam Medical Center and Catholic Hospital. The results of this study are summarized as follows: 1. Among the 179 cases, 51.6 % were male and 48.4 % were female. The two largest age groups were 30~39, 31.8 % and 20~29, 27.4 %. Among the 179 cases, 51.6% were married, the largest family number was 2 to 3, 41.1% and 4 to 5, 25.6%. Educationally, graduation from high school was the largest group, 46.4% among the patients, followed by middle school and primary school. The largest group income level was from 40~69만원, 45.2%. The largest group of patients who worked over 50 hrs. a week was 52.0%. The largest group of patients who worked less than 1 year was 44.7%, of the patients in work places of less than 100 people, 60.3% were injured and in work places of 100~299 people, 20.1% were injured. In manufacturing, the lagest group injured was 55.3%, the next group was transport, stroage, communication. The largest group of production workers injured was 40.2%. 2. The cause of injury in the largest group was facility problems, 33.5%. The next group was unsafe habits, 30.2% a lack of safety knowledge, 17.9% and insufficient supervision, 12.3%. The 30~39 year age group was head the highest number of injuries, 40.4% work places with more than 10 yeras of work, 44.4% work palces with more than 1000 people, 56.3% and mining accidents, 80.0%. Among these groups the highest cause of injury was due to facility problems. 3. The accident pattern showed machinery injuries 28.5% as the largest group, followed by falls & falling objects 17.3%, fire & electric 15.1%, struke by an object 14.5%, followed by overaction and vehicular accidents. The accident pattern showed 46.4 % among workers over the 50 year age group, workers in the 5~10 year group, 50.0 % places employing more than 1000 workers, 35.3 % : construction 73.7%, and construction workers 57.1%, among these fall & falling objects caused the greatest number of injuries. 4. The largest group of injuries was fractures 54.8%, trauma 14.5%, amputation 11.7%, open wound, and burns. The largest number of fractures occurred in people in the 30~39 year age group, 63.2 % over 10 years of work, 55.6% in work places of 300~400 people, 63.6% construction 63.2% and general workers 57.2 %. 5. The largest group of injuries was upper extremity 45.3%, lower extremity 24.0%, trunk 18.5 % and head or neck 12.2%. Of these groups, upper extremity injuries were the highest in those less 20 years old 75.0%, less than 1 years of work 59.5%, in work places of 500~999 people 60.0%, manufacturing 56.6 % and production workers 55.6%. 6. Periods of injury showed 34 people injured in September, to be the largest followed by October, 32 August, 22 people July, 19 people and the lowest December, 2 people. During the week, Friday had the largest group injured, 35 people followed by Saturday, 26 people and the lowest was Wednesday, 17 people, During the day 1400 hours had the largest group injured, 38 people followed by 800 hours, 31 people. 7. On a basis of 5 as the highest mark, the average, according to worker satisfaction showed facility safety 3.55, work environment 3.47, income 3.44, job 3.21 and treatment 2.98. 8. The correlation between general characteristics and injury showed that age was directly correlated to the duration of work(r=.2591) p<0.01, age was directly correlated to industry (r=2311) p<0.01, and the duration was directly correlated to occupation(r =.4372) p<0.001.

  • PDF

A Study of Industrial Patients from Selected General in the Kyung Pook and Taegu City areas (일부지역 산업재해환자 실태 조사 연구 -대구${\cdot}$경북지역 일부 종합병원 중심으로-)

  • Huh, Choon-Bok
    • The Journal of Korean Physical Therapy
    • /
    • v.3 no.1
    • /
    • pp.151-174
    • /
    • 1991
  • The purpose of this study is to research the actual conditions of industrial accident patients and to produce worker satisfaction and a rational and effective counter measure plan. Direct interviews with 179 cases (in and out patients) were carried out during a three month period from April to July 1990, at six hospitals : two general hospitals Sun Lin and Sung Mo in Po Hang, and four general hospitals in Taegu : Kyung pooh University Hospital, Dong San Medical Center, Young Nam Medical Center and Catholic Hospital. The results of this study are summarized as fellows : 1. Among the 179 cases, $51.6\%$ were male and $48.4\%$ were female. The two largest age groups were 30-39, $31.8\%$ and 20-29, $27.4\%$. Among the 179 cases, $51.6\%$ were married, the largest family number was 2 to 3, $41.1\%$ and 4 to 5, $25.6\%$. Educationally, graduation from high school was the largest group, $46.4\%$ among ,the patients, followed by middle school and primary school. The largest group income level was from 40-69 만원, $45.2\%$. The largest group of patients who worked over 50 hrs. a week was $52.0\%$. The largest group of patients who worked less than 1 year was $44.7\%$, of the patients in work places of less than 100 people, $60.3\%$ were injured and in work places of 100-299 people, $20.1\%$ were injured. In manufacturing, the largest group injured was $55.3\%$, the next group was transport, storage, communication. The largest group of production workers injured was $40.2\%$. 2. The cause of injury in the largest group was facility problems, $33.5\%$. The next group was unsafe habits, $30.2\%$ ; a lack of safety knowledge, $17.9\%$ ; and insufficient supervision, $12.3\%$. The 30-39 year age group head the highest number of injuries, $40.4\%$ ; work places with more than 10 years of work, $44.4\%$ ; work places with more than 1000 people, $56.3\%$ and mining accidents, $80.0\%$. Among. these groups the highest cause of injury was due to facility problems. 3. The accident pattern showed machinery injuries $28.5\%$ as the largest group, followed by falls & falling objects $17.3\%$, fire & electric $15.1\%$, strucke by an object $14.5\%$, followed by overaction and vehicular accidents. The accident pattern showed $46.4\%$ among workers over the 50 year age group, workers in the 5-10 year group, $50.0\%$ ; places employing more than 1000 workers, $35.3\%$ ; construction $73.7\%$, and construction workers $57.1\%$, among these fall & falling objects caused the greatest number of injuries. 4. The largest group of injuries was fractures $54.8\%$, trauma $14.5\%$, amputation $11.7\%$, open wound, and burns. The largest number of fractures occurred in people in the 30-39 year age group, $63.2\%$ : over 10 years of work, $55.0\%$ ; in work places of 300-490 people, $63.6\%$ ; construction $63.2\%$ and general workers $57.2\%$. 5. The largest group of injuries was upper extremity $45.3\%$, lower extremity $24.0\%$, trunk $18.5\%$ and head or neck $12.2\%$. Of these groups, upper extremity injuries were the highest in those less than 20 years old $75.0\%$, less than 1 year or work $59.5\%$, in work places of 500-999 people $60.0\%$, manufacturing $56.6\%$ and production workers $55.6\%$. 6. Periods of injury showed 34 people injured in September, to be the largest followed by October, 32 ; August, 22 people : July, 19 people and the lowest December, 2 people. During the week, Friday had the largest group injured, 35 people ; followed by Saturday, 26 people and the lowest was Wednesday, 17 people, During the day 1400 hours had the largest group injured, 38 people ; followed by 800 hours, 31 people. 7. On a basis of 5 as the highest mark, the average, according to worker satisfaction showed facility safety 3.55, work environment 3.47, income 3.44, job 3.21 and treatment 2.98. 8. The correlation between general characteristics and injury showed that age was directly correlated to the duration of work (r=2591) p<0.01, age was directly correlated to industry (r=2311) p<0.01, and the duration was directly correlated to occupation (r=4372) p<0.001.

  • PDF

Analysis of Economic and Environmental Effects of Remanufactured Furniture Through Case Studies (사례분석을 통한 사용 후 가구 재제조의 경제적·환경적 효과 분석)

  • Lee, Jong-Hyo;Kang, Hong-Yoon;Hwang, Yong Woo;Hwang, Hyeon-Jeong
    • Resources Recycling
    • /
    • v.31 no.5
    • /
    • pp.67-76
    • /
    • 2022
  • The furniture industry has a high possibility to create value-added and a high potential to create new occupations due to the characteristics of the industry, which mainly consists of small and medium-sized enterprises (SMEs). However, the used furniture, which has sufficient reuse value, is also crushed and used as solid refuse fuel (SRF) recently. Besides, the number of waste treatment companies continues to decrease, and it occurs congestion of wood waste. As a way to solve the issue, a business model development of remanufacturing used furniture can be suggested as an alternative due to its high circular economic efficiency. Remanufacturing business including furniture industry creates positive effects in various aspects such as economic, environmental and job creation. In other words, remanufacturing is an effective recycling way to reduce input resources and energy in the production process. The results of economic analysis show that the expected annual revenue from the single worker furniture remanufacturing site was 104 million won which is 3.11 times more than the average income of a single-worker household in Korea and its B/C ratio was estimated about 30 which means high business feasibility. Revenue through furniture remanufacturing also showed 320 times higher than that of SRF production from the perspective of weight. In addition, it is shown that the GHGs reduction from the furniture remanufacturing is 2.2 ton CO2-eq. per year, which is similar to the amount of GHGs absorption effect of 937 pine trees or 622 Korean oak trees annually. Thus the results of this study demonstrate that it is important to adopt an appropriate recycling method considering the economic and environmental effects at the end-of-life stage.

Impacts of Immigrant Workers on Regional Economy in S. Korea (이주노동자의 유입이 지역경제에 미치는 영향)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.15 no.3
    • /
    • pp.369-392
    • /
    • 2009
  • Recently international movements of labour as well as those of goods and other production elements such as capitals and technology have been increased rapidly under the process of glocalization. The huge amount of immigrant workers' in-flows makes increasing influences on regional economy in South Korea. This paper examines such impacts of immigrant workers on local labor markets, productivity. and industrial composition and innovation on the basis of analysis of empirical data and review of existing literature on the subject. Despite a problem of simplification, some reasoning can be listed as follows: First of all, the inflow of immigrant workers has an effect of job displacement among domestic simple workers, with duel effects on the status of native workers; secondly, Immigrant workers give a positive effect on local productivity, but only with low level of wage and of purchasing power; thirdly, the in-flow of immigrant workers seems to prevent existing industries from transformation towards new ones and/or from automation and innovation of production facilities, while there seems no clear relationship with foreign direct investments of local firms.

  • PDF

A Study on the Method and Work Measurement for Productivity Improvement of Clothing Products-With concentration in MTM Analysis- (의류제품의 생산성 향상을 위한 방법 및 작업측정에 관한 연구-MTM법을 중심으로-)

  • 김옥경;이순흥
    • Journal of the Korean Society of Costume
    • /
    • v.41
    • /
    • pp.185-206
    • /
    • 1998
  • The purpose of this study was to improve productivity for maximum effects with the present equipments and staff. This study compared and analyzed the mea-sured time by using stop watch method and MTM, which was the new measuring method. The flow and results of this study were as follows: 1. This study investigated the theoretical background the efficiency for production management, and the way of productivity improvement through documentary research. 2. Setting up the standard flow on the experi-mental company production, making out a process chart and measuring the actual working hour. 3. The study measured the allowance time applying work sampling. 4. Each process of the movement analysis was filmed by video to use basic data. 5. MTM analysis was taken by choosing 10 processes from front bodice according to the basic movement of MTM. Through the results, this study exclude unneccesary movements and suggest a method for working ways. 6. Using the actual working hour measured by a stop watch calculated the pitch time and presumed the amount of daily productivity. 7. The result of the work sampling came out as 38% of allowance rate. It was 13% higher than the standard amount of woman's jacket allowance rate, which was 25%. The most influencing factor was work discussion. That was because there were commuication problem of the work way between the operator and leader. More adequate use of flow table and level passing table was needed. There were the problems that inappropriate places and sizes made the distance of movements longer and often needed more adjustment of works and surroundings. To prevent breakdowns equipments check ups were necessary before works. 8. The results of MTM analysis were as follow : the time was reduced 40% than the actual measured time by a stop watch. This was because the leveling of the operator was included in the real calculation. Also, leveling was included in MTM analysis and all the conditions were standarized. Therefore MTM method was a scientidic measuring way of establishing the standard time. The presented method of this study, suggested an ideal method eliminating unneccesary motions, and presented standardization of works. Improvement of working methods, work condition and simplifying motions in each 10 processes reduced the working time from total 656 seconds to 301 seconds. 9. The way and time of working was linked together in the MTM analysis methods. Thus data from MTM help suggest not only establishing standard time but also establishing stan-dard work. Plus it includes various ability for improvements of working ways. So it is an objective method which can be widely used in other work studies. 10. The function of a time study is to determine the amount of work produced with a given method. The work rate is used to establish the cost of labor. The wage of worker must be calculated per unit time which is deter-mined before the time study is made. This study tried to introduce the incentive rule for deciding wages according to the standard time by MTM method.

  • PDF

A study of Double Sheet Multi-forming Equipment (2겹 판재 멀티포밍 장치에 관한 연구)

  • Yun, Jae-Woong;Son, Ok-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.49-55
    • /
    • 2017
  • Most motor cases adopt deep drawing products, which are excellent in waterproof functions, concentricity, right angle, and quality. In addition, the blower motor and seat motor, which are installed in the car interior and do not require waterproof function, adopts a multi-forming manufacturing method. The deep drawing process requires an expensive transfer press that can digest approximately 12 processes, such as drawing, trimming and piercing. On the other hand, products can be produced with low investment because the multi-forming method is composed of one multi-forming machine or one multi-forming machine and one press. The multi-forming machine is a high-priced facility that is mostly imported and a bending / shearing process multi-foaming machine, which was developed by domestic small and medium-sized enterprises, is not enough to reduce the production cost. An integral multi - forming machine is used as a limited working method for thin material and small products. A large product and thick material has a high shear load. A large product and thick material has a high shear load and uses a single crank press. After blanking, the worker manually feeds the material to a multi-forming machine. When the bending operation is performed in the multi-forming machine, it is transferred to the press again to calibrate the dimensions. This variance in work processes has resulted in lower cost competitiveness due to the lower productivity, quality issues, and excessive operator input. The aim of this study was to establish a stable and cost - effective production system through bending / shearing process separation and facility automation.

Pedagogical Conditions for Formation of Design Competence of Qualified Workers with the Use of Information Technologies

  • Slipchyshyn, Lidiia;Honcharuk, Oksana;Anikina, Inessa;Yakymenko, Polina;Breslavska, Hanna;Yakymenko, Svitlana;Opria, Ihor
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.5
    • /
    • pp.79-88
    • /
    • 2022
  • Modern production requires production staff who have design competence, experience and skills to work in various types of work integrated into professional activities. Possession of digital design methods significantly expands the opportunities for professional activities of qualified workers. The purpose of our study was to study the impact of pedagogical conditions on the formation of design competence of future qualified workers in a group work. We have identified a set of pedagogical conditions that promote the development of professionally oriented artistic and technical creativity of workers in the conditions of curricular and extracurricular activities, which include motivational-target, procedural-semantic, organizational-technological, and subject-oriented. It is shown that the formation of design competence is determined by motivational, informational-active and reflection criteria, which are aimed at motivational-value, cognitive, operational-active, creative, social and emotional components of this competence. The methodology of the research is highlighted, which includes the use of the following methods: determination of the personality's motivational sphere in order to identify strong and weak motives of students activity; multiple intelligence to identify students talents in the direction of practical intelligence, which is important for design competence; determining the level of creative activity to identify manifestations of students creative abilities; identifying the type of students innovative thinking in order to develop motivation for success; factor-criterion model, developed on the basis of a qualimetric approach, which is used to identify the level of design competence formation in accordance with its components. The results of the study showed that the creation of separate pedagogical conditions in the institution of vocational education and training (VET) had a positive impact on the development of design competence, which shows the potential of artistic and technical design in the development of professional creativity of future qualified workers taking into account the environmental approach.

Development of Task Planning System for Intelligent Excavating System Applying Heuristics (휴리스틱스(Heuristics)를 활용한 지능형 굴삭 시스템의 Task Planning System 개발)

  • Lee, Seung-Soo;Kim, Jeong-Hwan;Kang, Sang-Hyeok;Seo, Jong-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.859-869
    • /
    • 2008
  • These days, almost every industry's production line has become automatic and this phenomenon brought a lot of benefits such as increase in productivity and economical effect, assurance in industrial safety, better quality and compatibility. However, unlike industrial production line, in construction industry, automation has number of barriers like uncertainty incidents and intellectual judgment to make ability to make solution out of it. Therefore construction industry is still demanding use of construction machine through labor. Due to this matter operational labor in construction industry is aging and fading. To solve these problem, in developed nations like Europe, US or Japan are keep researching for the automation in construction and road pavement, strengthening and some other simple operations have been worked through automation but in civil engineering site, automation research is still low despite of its importance in constructional site. For automating civil engineering operation, effective operational plan have to be set by analyzing ground information acquainted. If skillful worker apply heuristics, trial & error can be reduced with increased safety and the effective work plan can be established. Hence, this research will introduce Intellectual Task Planning System for Intelligent Excavating System's effective work plan and heuristics applied in each steps.

3D Simulation Study to Develop Automated System for Robotic Application in Food Sorting and Packaging Processes (식품계량 및 포장 공정 로봇 적용 자동화 시스템 개발을 위한 3D 시뮬레이션 연구)

  • Seunghoon Baek;Seung Eel Oh;Ki Hyun Kwon;Tae Hyoung Kim
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.16 no.5
    • /
    • pp.230-238
    • /
    • 2023
  • Small and medium-sized food manufacturing enterprises are largely reliant on manual labor, from inputting raw materials to palletizing the final product. Recently, there has been a trend toward smartness and digitization through the implementation of robotics and sensor data technology. In this study, we examined the effectiveness of improvement through 3D simulation on two repetitive work processes within a food manufacturing company. These processes involve workers whose speed cannot match the capacity of the applied equipment. Two manual processes were selected: the weighing and packing process performed by workers after skewer assembly, and the manual batch process of counting randomly delivered frozen foods, packing (both internal and external), and palletizing. The production volume, utilization rate, and number of workers were chosen as verification indicators. As a result of the simulation for improving the 3D process, production increased by 13.5% and 56.8% compared to the existing process, respectively. This was particularly evident in the process of applying palletizing robots. In both processes, as the utilization rate and number of input workers decreased, robots could replace tasks with high worker fatigue, thereby reducing work overload. This study demonstrates the potential to visually compare the process flow improvement using 3D simulations and confirms the possibility of pre-validation for improvement.

Shielding Capability Evaluation of Mobile X-ray Generator through the Production assembled Shield (일체형 방어벽 제작을 통한 이동형 엑스선 발생기의 차폐능 평가)

  • Kim, Seung-Uk;Han, Byeoung-Ju
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.7
    • /
    • pp.895-908
    • /
    • 2018
  • As modern science is developed and advanced, examination and number of times using radiation are increasing daily. General diagnostic X-ray generator is installed on stationary form, But X-ray generator was developed because patient who is in the intensive care unit, operation room, emergency room can not move to general x-ray room. What we examine patient by x-ray generator is certainly necessary, So patient exposure is inevitable. but reducing radiation exposure is highly important matter about radiation technology, guardian, patient in the same hospital room, nurse etc. For this reason, rule regarding safety control of diagnostic x-ray generator revised for radiation worker, patient and protector proclaim that mobile diagnostic x-ray shield must placed in case of examine different location excluding operation room, emergency room, intensive care unit. But, radiogical technologist is having a lot of difficulties to examine with mobile x-ray generator, diagnostic x-ray shield partition, image plate and lead apron. So, when we use x-ray generator, we manufacture shield tools can be attached to the mobile x-ray generator On behalf of x-ray shield partition and conduct analysis and in comparison to part of body and distribution of dose rate and find way to reduce radiation exposure through distribution of dose rate of patient within the radiogical technologist, medical team. Mobile x-ray generator aimed at SHIMADZU inc. R-20, We manufactured equipment for shielding x-ray scattered x-ray by installing shielding wall from side to side based on support beam on the mobile x-ray generator. Shielding wall when moving can be folded and designed to expand when examine. Experiment measured five times in each by an angle for dose rate of eyes, thyroid, breast, abdomen and gonad on exposure condition of upper and lower extremity, chest, abdomen which is examined many times by mobile x-ray generator. We used dosimeter RSM-100 made by IJRAD and measured a horizontal dose rate by body part. The result of an experiment, shielding decreasing rate of the front and the rear showed 77 ~ 98.7%. Therefore using self-production shielding wall reduce scattered x-ray occurrence rate and confirm can decrease exposure dose consequently. Therefore, through this study, reduction result which is used shielding wall of self-production will be a role of shielding optimization and it could be answer about reduction of medical exposure recommended by ICRP 103.