Journal of Korean Society of Industrial and Systems Engineering
/
v.22
no.50
/
pp.293-302
/
1999
This paper presents an efficient reengineering technique for the logistics process innovation which is the foundation of supply-chain management. Based on consulting experience on the domestic manufacturing firms, this paper provides promotion step for logistics innovation and six reengineering points including check system for customer's credit limit, check system of real-time inventory information, automatic system for sequential production plan, automatic order-release system, automatic packing system, and happy-call system for order-forward information. For each reengineering point, application cases in domestic industry are also presented.
A supply chain is a network of facilities and distribution options that performs the functions of procurement of materials, transformation of these materials into intermediate and finished products, and the distribution of these finished products to customers. SCM(Supp1y Chain Management), by definition, encompasses all activities associated with moving goods, from the raw materials stage through to the end user. It includes source and procurement, production scheduling, order processing, inventory management, transportation, warehousing, and customer service. Importantly, it encompasses the information systems used to monitor these activities. In this paper, the present situation and problems of marketing process in Korean agricultural environments were reviewed through a systematic methodology, and then we proposed a new business process for solving these problems by appling a supply chain management. We expect this supply chain management system applied to agricultural marketing process can improve significantly the rationality and transparency of Korean agricultural marketing structure.
This paper considers a coordinated scheduling problem between multi-suppliers and an manufacture. When the supplier has insufficient inventory to meet the manufacture's order, the supplier may use the expedited production and the expedited transportation. In this case, we consider a scheduling problem to minimize the total cost of suppliers and manufacture. We suggest an population management genetic algorithm with local search and crossover (GALPC). By the computational experiments comparing with general genetic algorithm, the objective value of GALPC is reduced by 8% and the calculation time of GALPC is reduced by 70%.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.4
/
pp.83-97
/
2012
In this paper, we consider a single-manufacturer single-buyer supply chain problem where a single manufacturer purchases and processes raw materials into a family of items in order to deliver a family of items to a single buyer at a fixed interval of time for effective implementation of Just-In-Time Purchasing. An integrated multi-item lot-splitting model of facilitating multiple shipments in small lots between buyer and manufacturer is developed in a JIT Purchasing environment. Previous research on the integrated model assumed that the manufacturer orders raw materials m (integer) times for every production run (lot multiplier policy for the raw material). In this paper, we consider a generalized policy in the replenishment of raw materials, allowing lot multiplier policy and lot splitting policy. An iterative solution procedure is developed to find the order interval for finished goods and raw materials, and number of shipments between buyer and manufacturer. We show by numerical example that when the integrated policy is adopted by both buyer and manufacturer in a cooperative manner, both parties can benefit.
This study proposes a collaboration system framework on the web service in a supply chain to implement an efficient virtual supply chain and improve an ability to fulfill received orders over a supply chain. The system based on the framework proposed in this paper plays an important role for automatic order negotiation and placing/receiving an order noticed in web service by the main system. Furthermore, it can evaluate the fulfillment of received orders over a supply chain by using the transaction results from hierarchically related vendors and establish efficient manufacturing plans. In a word, this system is the automated system for creating manufacturing plans, placing and receiving orders. A little more important main function of this system is that it has a dynamic evaluation capability about fulfillment with received orders over a supply chain, and improves the evaluation method of fulfillment ability with received orders with related to direct dealing vendors, which is a main problem in existing system. As a result, this system is able to reduce the work load of the sales and purchasing materials, production control division, to manage accurate inventory promptly, to maintain the optimal inventory level by analyzing the information of fulfillment ability with received orders, and to enhance the level of service for customers.
Journal of Korean Society of Industrial and Systems Engineering
/
v.17
no.32
/
pp.121-126
/
1994
Setup Time Reduction is an important aspect of the Just-in-Time(JIT) and Zero Inventory(Zl) Concepts since it supports reductions in manufacturing lead times and inventories. It also enables small lot sizes and kanban systems implementation for material flow - achieving major improvements in production floor management. One concept fundamental to the pursuit of JIT production in Japan and other countries is adoption of a setup time reduction. This paper looks at the necessities of setup time reduction and the relations to machine utilization. By using an EOQ model for evaluate the effect of setup time reduction, we get the results that over 75 % reduction in setup time is obtain the desired results in the lot size reduction.
The beef industry is an important part of livestock and meat production in China. China ranks third in the world for beef production. With the rapid development of the Chinese economy, beef consumption has grown rapidly, and beef consumption has been increasing with rising per capita gross domestic production. However, the domestic beef industry in China has not been able to keep pace with growth in consumption, making China a net importer of beef from other countries. Moreover, the volume of production has increased little despite rising demand. The slowing of growth in beef production in recent years has led to a sharp rise in beef prices. Domestic beef production and consumption is restricted by a shortage of beef cattle inventory. The Chinese beef industry is facing many technical problems including transformation of traditional practices, feeding and management systems, and genetic improvement of cattle breeds. The long-term, sustainable development of the Chinese beef industry is an important issue for China.
Journal of Korean Society of Industrial and Systems Engineering
/
v.43
no.4
/
pp.133-141
/
2020
Up to date cosmetic OEM/ODM (original equipment manufacturing/original development manufacturing) industry receives attention as a future growth engine due to steady growth. However, because of limited research and development capability, many companies have employed commercial management platforms specialized for large-sized companies; thus, overall system effectiveness and efficiency is low. Especially, MRP (material requirement planning) system introduced originally in 1970s is employed to calculate the requirement of the parts. However, dynamic nature of production lead time usually results in incorrect requirements. In addition, its algorithm does not consider the capability of the production resources. Also, because the commercial MRP system calculates all subcomponent for fixed period, the more goods have subcomponent, the slower calculation is. Therefore, conventional MRP system cannot respond complicated situation in time. In this study, we will suggest a new method that can respond to complicated situations resulting from short lead time and urgent production order in Korean cosmetic market. In particular, a distributed MRP system is proposed, that consists of multi-functional and operational modules, based on the characteristic of the BOM (bill of material). The distributed MRP system divides components (i.e. products and parts) into several fields and decrease the problem size; thus, we can respond to dynamically changed data any time. Through this solution, we can order components quickly, adjust schedules and planned quantity, and manage stocks reasonably. In addition, a prototype of the distributed MRP system is presented in this paper, in which ERP (enterprise resource planning) sever data is associated with an excel spreadsheet via MSsql. System user interface is implemented by a VBA (visual basic for applications) tool. According to a case study, response rate for delivery and planning achievement rate were enhanced about 20%, and inventory turnover was also decreased. Consequently, the proposed system improves overall profit.
This paper describes the issue of batch scheduling.In food production, the lead-time from produc-tion to sale should be decreased becausefreshness of the product is important. Products are shipped at diverse times depending on a demand of sellers, because the types of sellers has become diversified such as super-markets, convenience stores and etc. production of quantity demanded must be completed by time to ship it then. The authors consider a problem with due-dates constraints and construct the algorithm to find the opti-mal schedule that satisfy the due-dates constraint, batch size constraint, inventory time constraint and mini-mize total flow time.
Journal of the Korean Operations Research and Management Science Society
/
v.27
no.4
/
pp.41-65
/
2002
We study a multi-component production/inventory system in which individual components are made to meet various demand types. We assume that the demands arrive according to a Poisson process, but there is a fixed probability that a demand requests a particular kit of different components. Each component is produced by a flow line with several stations in which the processing times of each station follow a two-stage Coxian distribution. The production of each component is operated by an independent base-stock policy with blocking. We assume that the time needed to assemble final products follows a general distribution and the capacity of an assembling facility is sufficiently large. The objective of this study is to obtain key performance measures such as the distribution of the number of each orders for each final product and the mean time of fulfilling a customer order. The basic principle of the proposed approximation method is to decompose the original system into a set of subsystems, each subsystem being associated with a flow line. Each subsystem is analyzed in isolation using a Marie's method. An iterative procedure is then used to determine the unknown parameters of each subsystem. Numerical results show that the accuracy of the approximation method is acceptable.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.