• 제목/요약/키워드: Process interruption

검색결과 107건 처리시간 0.024초

가스차단기 전류영점영역에서의 열유동특성에 관한 연구 (Thermal Flow Characteristics of Gas Circuit Breakers near Current Zero Period)

  • 이종철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 C
    • /
    • pp.1772-1774
    • /
    • 2004
  • Because the physics occurring during an interruption process is not well known, it is not easy to analyze the characteristics of a self-blast circuit breaker neither theoretically nor experimentally. Fortunately the available computational power and the numerical method improved recently make it possible to predict an interruption process as precisely and fast as possible. Therefore many researches using computational methods have been done for the interruption process of interrupters and applied to extend the information such as thermal and dielectric reignition. In this paper, we have simulated the interruption process of SF6 self-blast circuit breakers with the arc plasma during the fault interruption of a 10 kA current. The CFD program used here is coupled with the electromagnetic field analysis, the radiation model and the effects of turbulence. Through this work, we have get further information about the thermal performance as well as the behavior of the arc. The results have been compared with the measured arc voltage.

  • PDF

Power Interruption Costs to Commercial Customers of Electricity in Korea

  • Kim, Dong-Sub;Kim, Kil-Sin
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권5호
    • /
    • pp.1495-1500
    • /
    • 2014
  • This paper presents the result of the estimation of the power interruption costs of Korean commercial customers. Commercial customers are usually located in urban areas and considered very important because a power interruption on them can expand to additional damage to related users. Their power interruption costs were calculated through a survey with the process of data selection. Also, the power interruption cost for each customer's business type was calculated and compared with that of foreign cases.

Markovian 간섭 신호하에서의 Stop-­and-­Wait ARQ Protocol의 성능 분석 (Analysis of Stop-and-Wait ARQ Protocol under Markovian interruption)

  • 김성일;신병철
    • 한국정보통신학회논문지
    • /
    • 제7권8호
    • /
    • pp.1674-1683
    • /
    • 2003
  • Markovian 신호의 간섭(interruption)하에서 Stop­-and-­Wait ARQ protocol을 적용한 패킷 데이터 다중화기의 성능을 분석한다. 시스템 모델을 살펴보면 입력 프로세스는 Poisson 프로세스로, 출력 채널은 연속되는 시간 슬롯(slot)으로 분할되고 데이터 패킷은 이 슬롯 시간 동안에 전송된다. 이 시스템에서, 프레임 시간은 왕복 지연 시간으로 정의되었다. 이 모델에서 출력 채널은 Markovian 간섭에 의해 데이타 전송이 중단되는 blocking state와 간섭이 없는 non-­blocking state로 구분된다. Markovian 간섭신호를 고려하면서, 2개의 연속적인 프레임이나 slot사이에 버퍼 상태에 관한 관계식을 고려하여 전체적인 시스템이 분석되었다. 분석된 자료 값이 시뮬레이션과 비교적 잘 일치함을 확인하였다.

전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구 (Research for the survey of method to serviced customer Interruption cost evaluation)

  • 박수만;김재철;문종필;배주천
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

초고압 가스차단부의 냉가스 유동해석 (An Analysis of Cold Gas Flow-Field for UHV Class Interrupters)

  • 송기동;박경엽;송원표
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제49권6호
    • /
    • pp.387-394
    • /
    • 2000
  • This paper presents a method of cold gas flow-field analysis within puffer type GCB(Gas Circuit Breaker). Using this method, the entire interruption process including opening operation of GCB can be simulated successfully. In particular, the distortion problem of the grid due to the movement of moving parts can be dealt with by the fixed grid technique. The gas parameters such as temperature, pressure, density, velocity through the entire interruption process can be calculated and visualized. It was confirmed that the time variation of pressure which was calculated from the application of the method to a model GCB agreed with the experimental one. Therefore it is possible to evaluate the small current interruption capability analytically and to design the interrupter which has excellent interruption capability using the proposed method. It is expected that the proposed method can reduce the time and cost for development of GCB very much. It also will be possible to develop the hot-gas flow-field analysis program by combining the cold-gas flow field program with the arc model and to evaluate the large current interruption capability.

  • PDF

산업용 수용가의 정전비용 산출을 위한 조사 분석(I) (Survey & Analysis for the Calculation on the Industrial Customer Interruption Costs)

  • 남기영;최상봉;류희석;정성환;이재덕;김대경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.122-124
    • /
    • 2003
  • In recent, the various electric & electronic machines are newly developed everyday and the electricity supply system & environment on the process from generation to consumption of electricity also is being changed. In other words, both supplier and consumer of electricity are required to be responsible for their interruption costs. So, it is very important and meaningful work for evaluating the interruption costs in quantitative. Additionally, since the restructuring of electric industry is on going in world wide, after restructuring, most of all electric utilities and consumer have to consider the supply reliability and quality as a important element of the calculating the related costs and contract because it takes costs to keep the supply reliability and quality highly. Especially, the interruption or the supply reliability will have influence on the bilateral contract between supplier and customer as a key point to determine the once in competitive electric market. Therefore, it has very important moaning to calculate the interruption costs in the present that it is prepared to open the competitive electric market. In this paper, international standards, i.e. IEC, IEEE, are applied to the analysis on the interruption costs used in the questionnaires which are newly designed including short duration interruption by the authors instead of traditional interruption criteria. Firstly, using the questionnaires, the authors got related data from industries according to the standard industry classification which are being used in electric utility and other national statistics in Korea. However, analysis results are hard to say typical value because of the not so many samples. So, the authors are going to survey and focus on not all kinds of industry but a few kinds of them that their facilities are effected or stop by short duration interruptions, so there are large economical damages. Finally, the authors hope to find the reliable and meaningful model in interruption costs of industrial customer.

  • PDF

Investigation of SLF Interruption Capability of Gas Circuit Breaker with CFD and a Mathematical Arc Model

  • Cho, Yong-Sung;Kim, Hong-Kyu;Chong, Jin-Kyo;Lee, Woo-Young
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.354-358
    • /
    • 2013
  • This paper discusses the analysis of arc conductance in a gas circuit breaker (GCB) during current interruption process and the investigation method of the interruption capability. There are some limitations in the application of the computational fluid dynamics (CFD) for the implementation of an arc model around the current zero, despite the fact that it gives good results for the high-current phase arc. In this study, we improved the accuracy in the analysis of the interruption performance by attempting the method using CFD and a mathematical arc model. The arc conductance at 200 ns before current zero (G-200ns) is selected as the indicator to predict the current interruption of the Short Line Fault (SLF). Finally, the proposed method is verified by applying to the actual circuit breakers which have different interruption performances.

분자선에피택시에 의해 성장한 GaAs/AlGaAs 양자우물의 성장 멈춤 효과 (Growth Interruption Effects of GaAs/AlGaAs Quantum Wells Grown by Molecular Beam Epitaxy)

  • 김민수;임재영
    • 한국진공학회지
    • /
    • 제19권5호
    • /
    • pp.365-370
    • /
    • 2010
  • 분자선 에피택시 방법을 이용하여 GaAs 기판 위에 GaAs 및 AlGaAs 에피층을 성장하면서 성장 멈춤 효과를 연구하였다. 성장 멈춤 시간에 따른 에피층 성장 과정은 반사 고에너지 전자회절로 측정하였다. 성장 멈춤 시간은 0, 15, 30, 60초로 하였다. 그리고 성장 멈춤 시간을 달리하여 GaAs/$Al_{0.3}Ga_{0.7}As$ 다양자우물을 성장한 후 양자우물의 특성을 조사하였다. 반사 고에너지 전자회절의 강도 진동은 성장 멈춤 시간에 영향을 받고 있었다. 그리고 양자우물의 광특성도 성장 멈춤 시간에 의존하고 있었다. 성장 멈춤 시간이 30초일 때 우물과 장벽층 사이에 급준한 계면을 가지는 에피층을 얻을 수 있었다.

초고압 $SF_6$ 가스차단기의 소전류 차단성능 해석기술 I (Evaluation Method I of the Small Current Breaking Performance for SF(sub)6-Blown High-Voltage Gas Circuit Breakers)

  • 송기동;이병운;박경엽;박정후
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제50권7호
    • /
    • pp.331-337
    • /
    • 2001
  • With the increasing reliability of analysis schemes and the dramatically increased calculating speed, the computer simulation has become and indispensable process to predict the interruption capacity of circuit breakers. Generally, circuit breakers have to possess both the small current and large current interruption abilities and the circuit breaker designers need to evaluate its capacities to save the time and the expense. The analysis of small current and the large current interruption performances have been considered separately because the phenomena occurring in a interrupter are quite different. To analyze the dielectric recovery after large current interruption many physical phenomena such as heat transfer, convection and arc radiation, the nozzle ablation, the ionization of high temperature SF(sub)6 gas, the electric and themagnetic forces and so forth mush be considered. However, in the analysis of small current interruption performance only the cold gas flow analysis needs to be carried out because the capacitive current is to small that the influence from the current can be neglected. In this paper, an empirical equation which is obtained from a series of tests to estimate the dielectric recovery strength has been applied to a real circuit breaker. The results of analysis have been compared with the test results and the reliability has been investigated.

  • PDF

DISCRETE-TIME BULK-SERVICE QUEUE WITH MARKOVIAN SERVICE INTERRUPTION AND PROBABILISTIC BULK SIZE

  • Lee, Yu-Tae
    • Journal of applied mathematics & informatics
    • /
    • 제28권1_2호
    • /
    • pp.275-282
    • /
    • 2010
  • This paper analyzes a discrete-time bulk-service queue with probabilistic bulk size, where the service process is interrupted by a Markov chain. We study the joint probability generating function of system occupancy and the state of the Markov chain. We derive several performance measures of interest, including average system occupancy and delay distribution.