• Title/Summary/Keyword: Process Productivity

Search Result 2,539, Processing Time 0.028 seconds

Trust on Superiors and Organizational Effectiveness (공공조직에서 상사신뢰와 조직유효성에 미치는 영향)

  • Hong, Soon-Bok
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.3
    • /
    • pp.197-206
    • /
    • 2007
  • The high commitment of a revenue officer makes to raise efficiency, can be directly related to task result and validity. The fundamental process through trust in superior, consisting the core of tax execution, needs to be studied significantly. This study is proposed to verify the practical influence of trust in superior with respect to productivity, participation in decision-making, and concentration. These factors are important prerequisites with respect to task processing of a tax revenue officer. As the result of analysis, the more trust in superior effects on the statue of productivity, participation in decision-making and concentration. It is the proof that the trust in superior procedure contributes in the aspects of productivity, participation in decision-making and concentration through the process of encouraging organizational validity.

Acoustic Emission and Burr Comparison of Circular Sawing and Milling in Fiber Reinforced Plastic Cutting (원형 톱과 엔드밀의 복합재료 절단 음향과 버 비교연구)

  • Joo, Chang-Min;Baek, Jong-Hyun;Kim, Su-Jin;Lee, Gun-Myung
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.21 no.7
    • /
    • pp.98-104
    • /
    • 2022
  • Circular sawing and milling are general machining processes used for routing fiber-reinforced plastics (FRP). In this study, the productivity and cutting quality of a circular saw and flat endmill were compared. As a result, the productivity of the circular saw was approximately ten times higher than that of the endmill for the same tool life, and the burr size of the circular saw was 14 times smaller than that of the flat-end mill. The spectrogram analysis of the cutting sound also showed that the acoustic emission of the circular saw was more uniform than that of the flat end mill. Circular sawing is thus a more suitable process for the straight cutting of pultrusion FRP than a flat endmill.

Blanking Process of Aluminum Thin Sheet for Lithium Ion Battery (리튬 이온전지용 알루미늄 박판의 블랭킹 공정에 관한 연구)

  • Kim, M.G.;Kim, J.H.;Shin, H.J.;Moon, J.H.;Ko, D.C.
    • Transactions of Materials Processing
    • /
    • v.30 no.4
    • /
    • pp.179-185
    • /
    • 2021
  • Lithium ion batteries are generally manufactured by laser and etching using aluminum thin sheet. These processes are relatively expensive and have low productivity. In this study, blanking process of aluminum thin sheet for lithium ion battery was employed to replace laser cutting and etching process, all to reduce the production cost and improve productivity. Mechanical properties for aluminum and coating were determined by experimental results and rule of mixture for FE analysis of blanking process. Normalized Cockcroft-Latham criteria was also applied to describe shear behavior and critical damage values were determined by comparison of analytical and experimental result. We performed FE analysis to investigate the effects of clearance and punch-die radius on sheared surface of aluminum thin sheet and to determine optimal process condition. We manufactured the die set using the determined optimal process and conducted an experiment to confirm the feasibility of blanking process. The sheared surface of manufactured product was observed by optical microscope. As a results, the proposed process conditions successfully achieved the dimensional requirement in production of lithium ion battery parts.

Recycling of Wastepaper(XV) -Contamination of Process Water by System Closure- (고지재생연구(제15보) -제지 공정수 폐쇄화에 따른 오염 및 변화에 관한 연구-)

  • 조미선;윤혜정;류정용;신종호;송봉근
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.33 no.2
    • /
    • pp.32-40
    • /
    • 2001
  • It is desirable to reduce the amounts of fresh water and reuse the recycled water in papermaking process. In an attempt to improve the efficiency of recycling water refining treatment and to enhance the productivity of OCC recycling mill, up flow anaerobic sludge blanket(UASB) reactor was developed and introduced to Korea recently. In order to maximize the operating efficiency and minimize the adverse side effects it is imperative to estimate and evaluate the total effects of new system, UASB on the whole OCC recycling process. This study was carried out with a view to investigate the effects of the high temperature and alkalinity of process water on the quality ad productivity of testliner of OCC recycling mill which is equipped with UASB reactor and almost closed. Another object of this study was searching for the best available use of UASB treated process water. The results were as follows; Reuse of UASB treated water characterized with high temp and alkalinity was useful to improve the strength and drainage properties of recycled OCC owing to its good points of promoting OCC disintegration and reducing the calcium hardness of process water. However, it might not be avoidable to induce the increase of dissolved solids in process water in accordance with direct introducing of UASB treated water into the former stage of OCC stock preparation. So it would be advisable to adopt the UASB treated water in the stage of clean, screened OCC stock.

  • PDF

A Model for Optimization Process of Asbestos Dismantling Work Using Simulation (시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델)

  • Cho, Hyeong-Jun;Noh, Jae-Yun;Lee, Ho-Hyeon;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

Research on productivity analysis of tunnel refuse arrangement process due to ability variation of car-lift (카리프트의 성능 변화에 따른 터널공사 버력처리 공정 생산성 분석 연구)

  • Lee, Si-Wook;Shin, Jung-Min;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.593-596
    • /
    • 2006
  • Productivity is the most important factor directly link to success and failure of a work in construction industry. To evaluate this productivity, simulation technique is verified as a fine inspection tool through various experiment reports. On this project, we have proved the part of improvement on productivity using this simulation technique, applied to this field sites. We have used CYCLONE, which is the most appropriate simulation technique on this project. As a result of Simulation analysis, it has been confirmed that the productivity was enhanced due to the advancement of equipment, hence the reduction of air is being effected.

  • PDF

Analyzing the Casual Relationship among Employee Satisfaction, Productivity and Customer Satisfaction Considering Employee' Work Ability (종업원의 업무능력을 고려한 종업원 만족도, 생산성 및 고객만족 간 인과관계 분석)

  • Kim, Chan-Gyu;Park, Young-Joon;Kim, Tae-Ho
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.116-122
    • /
    • 2003
  • We analyze how much employees' work abilities and overall satisfaction on the job or corporate influence on the productivity and customer satisfaction in the service industry, which is characterized by simultaneity, heterogeneity, intangibility and etc. Employees always encounter customers in process of the service. So, the employees' attitudes and behaviors have direct influences on the service quality or satisfaction which customers perceive. Also, employees' satisfaction or work abilities can lead to increase or decrease the productivity. To grasp and demonstrate the cause and effect relationship, we firstly measure the degrees of employee satisfaction organized by 11 factors through survey, and also measure employees' overall satisfaction, organizational commitment and productivity. Secondly, we define service value as the employee's objective measure index and collect it with the data related to customer satisfaction. Based on the collected data, thirdly we define how the relationship among the employee satisfaction, the productivity, the service value and the customer satisfaction are affected by the employees' work abilities and overall satisfaction with SEM(Structural Equation Model). And finally, we classify employees according to their abilities and the degrees of satisfaction respectively and suggest important strategies to manage them effectively.

Production of 3-Ketosteroid-delta-1-Dehydrogenase by a Two-stage Continuous Culture

  • Ryu, D.Y.;Lee, B.K.;Thoma, R.W.
    • Microbiology and Biotechnology Letters
    • /
    • v.2 no.1
    • /
    • pp.29-35
    • /
    • 1974
  • We have studied the applicability of the principles and inherent advantages of the two-stage dontinuous uclture technique to an enzyme process for the purpose of improving and optimizing the productivity of 3-ketosteroid-delta-1-dehydrogenase. By using a two-stage continuous culture system, the growth st ageand enzyme produdtion stage are separated. In each stage an optimal set of toperaing conditions was determined, and this was tested for feasibility for the period of 10 days. During this period, at least 70% of the maximum enzyme productivity could be maintained. The important design parameters studied are: (1) optimal specific growth rate in the first stage which corresponds to the maximal cell productivity, (2) the optimal dilution rate in the second stage which in turn determines the size of second stage fermentor and the mean residence time of cells in the second stage, (3) cell concentration in both stages, add (4) the specific enzyme productivity and enzyme productivity of the second stage. In addition, by using two-stage continuous culture system we have been able to reduce or eliminate the effect of catabolite repression due to high medium concentration and the adverse effect of the solvent used to dissolve the inducer. We have found the balance between the opposing effects of induction and repression in the second stage judging from the observation that the enzyme productivity goes through a maximum.

  • PDF

Development of Productivity Analysis Simulation Model for Formwork Based on 3D Printing Technology Using ARENA (ARENA를 활용한 3D 프린팅 기술 기반 거푸집 공사의 생산성 분석 시뮬레이션 모델 개발)

  • Ahn, Heejae;Lee, Changsu;Kim, Harim;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.188-189
    • /
    • 2021
  • The technology of manufacturing freeform molds with S-LOM based 3D printer has advantages in the production period and the curvature range. However, there is no any support tool about productivity analysis of S-LOM technology because S-LOM technology is early-stage technology. There can be problems about increase of construction time and cost without any decision support tool like productivity analysis models etc. Therefore, in this study, the productivity analysis simulation model for freeform formwork based on S-LOM technology was developed using ARENA software. The process and logic of manufacturing freeform molds can be easily visualized in this model. Futhermore, the resource like labor, equipment and material can be easily optimized with this model. As a result, it can contribute to preventing the increase of construction time and cost in formwork with further productivity analysis.

  • PDF