• 제목/요약/키워드: Process Cycle Efficiency

검색결과 450건 처리시간 0.026초

벤처기업의 효율성과 재무요인이 기업의 생존에 미치는 영향 분석 (The Analysis of Financial Factors and efficiency that influence on the Venture Business' Survival)

  • 송성환;권성훈;홍순기;유경진;배영임
    • 경영과학
    • /
    • 제27권1호
    • /
    • pp.107-116
    • /
    • 2010
  • There are several stage in corporate's life cycle such as foundation, growth, maturity or bankruptcy. A bankruptcy is very important for corporate in the life cycle. Especially, venture business' life cycle is short compare to other type of corporate. A lot of venture businesses have emerged and bankrupted soon in the market. Venture businesses' survival or bankruptcy have been influenced by not only external environment like the rate of exchange, oil price, and foreign exchange crisis but also internal environment such as efficiency, process, human resources, finance and CEO. In this paper, we attempt to examine financial factors and efficiency that influence on the venture businesses' survival and bankruptcy. The more venture businesses have high efficiency score, the more they have high probability of survival.

BPM에서 업무할당방식이 업무효율성에 미치는 영향 (Analysis of Business Process Efficiency Based on Task assignments)

  • 왕진국;배혜림
    • 경영과학
    • /
    • 제26권1호
    • /
    • pp.127-136
    • /
    • 2009
  • This paper purposes analyzing how task assignments influence on business process efficiency, and improving business process efficiency in Business Process Management (BPM) environments. For this purpose, task assignment is categorized into dynamic assignment and static assignment. Dynamic assignment binds a user to a task at process run-time, whereas static assignments assigns a task to a user at process build-time. So far, the influence of task assignment methods has not been studied. We, in this paper, analyze the business process efficiency using two different assigning rule, in terms of cycle time as a efficiency measure. The comparison result can provide a guideline for a company who wants to employ commercial BPM systems.

천연가스 액화공정의 C3MR 냉동사이클의 공정모사와 최적화에 관한 연구 (Study on Simulation and Optimization of C3MR Liquefaction Cycle)

  • 박창원;차규상;이상규;이철구;최건형
    • 한국가스학회지
    • /
    • 제17권1호
    • /
    • pp.67-72
    • /
    • 2013
  • LNG Value Chain에서 액화플랜트는 고부가가치를 지니며 전체 Cost의 약 35%를 차지한다. 액화플랜트의 핵심기술은 액화공정이며, 여기서 발생하는 대부분의 Cost는 액화공정의 운전에 필요한 에너지 생성과정에서 소비된다. 액화공정의 에너지소비를 줄이기 위한 방법은 액화공정의 핵심공정인 액화사이클의 효율을 높이는 것이다. 세계적으로 널리 이용되고 액화 효율이 높은 LNG 플랜트의 액화공정은 C3MR(프로판과 혼합냉매) 공정이다. C3MR 공정은 프로판 사이클과 혼합냉매 사이클을 이용하여 천연가스를 액화시키는 공정이다. 본 연구에서는 C3MR을 대상공정으로 하여 공정분석과 공정모사를 수행하였다. 이를 통해 C3MR의 공정변수를 알아내었으며 이후 공정최적화를 수행하였다. 본 연구에서 수행한 C3MR의 공정분석, 공정변수, 최적화 결과는 새로운 액화 공정개발에 활용 될 것으로 생각된다.

Optimization of double cycling in container ports

  • Song, Jang-Ho;Kwak, Kyu-Seok
    • 한국항해항만학회지
    • /
    • 제33권2호
    • /
    • pp.127-134
    • /
    • 2009
  • If the research on double cycle is revitalized, crane productivity will be rapidly improved bemuse double cycle is an operational technique that can maximize equipments efficiency (Quay crane, RMG/RTG, Yard tractor). Unfortunately, it is very difficult for terminal operators to find out the starting point of double cycle bemuse the loading & unloading pattern and conditions are various. Therefore, terminal operators are apt to fail to find out the optimal starting point of double cycle to maximize its frequency. Experiencing the same mistakes in the process we made efforts to find out the optimal starting point, finally we found out the formula for it. And we verified its precision is perfect through a lot of testing. This paper on double cycling focused on making the formula to find out optimal starting point of double cycle to maximize its frequency. And it can be applied to various ships' stowages in common.

공정폐열의 자원순환 네트워크 구성을 위한 전과정 평가 및 생태효율성 분석 (Life Cycle Assessment and Eco-efficiency Analysis for the Resource-circulation Network of Waste Heat Generated from Industrial Process)

  • 신춘환;박도현;김지원
    • 한국환경과학회지
    • /
    • 제22권3호
    • /
    • pp.281-289
    • /
    • 2013
  • For the purpose of evaluating the eco-efficiency(EE) on surplus heat generated from industrial process, techniques of life cycle assessment are adopted in this study. Because it can be indicated both environmental impacts and economic benefits, EE is well known as a useful tool for symbiosis network on the sustainable development of new projects and businesses. To evaluate environmental impacts, the categories were divided into two areas of resource depletion and global warming potential. It can be seen that environmental impact increased a little but much higher economic benefit on the company, environmental performance and economic value were improved on the apartment by the district heating, respectively. In result, eco-industrial park(EIP) project on surplus heat should be found sustainable new business because the EE was in the area of fully positively eco-efficiency and, moreover resource depletion was taken place than the reduction of greenhouse gas.

이산화탄소 사이클에서 팽창장치의 영향에 관한 수치적 연구 (Numerical Study for the Effect of Expansion Device on the Performance of the $CO_2$ Cycle)

  • 김무근;김욱중;김유진
    • 설비공학논문집
    • /
    • 제16권1호
    • /
    • pp.84-90
    • /
    • 2004
  • In order to evaluate the performance of carbon dioxide cycle, a simulation model was developed to predict the steady state performance of $CO_2$ transcritical cycle. The expansion process is treated as an isenthalpic throttling process or isentropic expansion process. The mathematical model is based entirely on the basic energy conservation law and thermodynamic and transport properties of $CO_2$. A Parametric study has been conducted in order to investigate the effect of isentropic efficiency of expansion turbine and various operating conditions on the cycle performance. An optimal heat rejection pressure existed for the given evaporating temperature and outlet temperature of gas cooler.

브레이튼과 펄스 데토네이션 복합 엔진 사이클의 열역학적 성능 해석 (Thermodynamic Analysis of Hybrid Engine Cycle of Brayton and Pulse Detonation Engine)

  • 김건홍;구자예
    • 한국항공운항학회지
    • /
    • 제15권1호
    • /
    • pp.1-10
    • /
    • 2007
  • When detonation is occurred, the working fluid is compressed itself, though there are no other devices that compress the fluid. As a result, an engine which uses detonation for a combustion process doesn't need moving parts so that the engine can be lighter than other engines ever exist, and such an engine is often referred to as a pulse detonation engine. Since using detonation has higher performance than using deflagration, many studies have been attempting to control and analyze the engines using detonation as combustion. The purpose of this study is to analyze the hybrid cycle which is consisted of Brayton and Pulse Detonation Engine cycle. At first, we set the theoretical basis of detonation analysis, and after that we consider two hybrid cycles; a turbojet hybrid cycle and a turbofan hybrid cycle. The more energy released, the higher detonation Mach number the detonation wave has. In general, a cycle which has a detonation process has higher performances but thermal efficiency of hybrid turbofan engine.

  • PDF

Comparison of Operation Performance of LNG Reliquefaction Process according to Reverse Brayton Cycle and Claude Cycle

  • Shin, Young-Gy;Seo, Jung-A;Lee, Yoon-Pyo
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • 제17권4호
    • /
    • pp.135-140
    • /
    • 2009
  • A dynamic model to simulate LNG reliquefaction process has been developed. The model was applied to two candidate cycles for LNG reliquefaction process, which are Reverse Brayton and Claude cycles. The simulation was intended to simulate the pilot plant under construction for operation of the two cycles and evaluate their feasibility. According to the simulation results, both satisfy control requirements for safe operation of brazed aluminum plate-fin type heat exchangers. In view of energy consumption, the Reverse Brayton cycle is more efficient than the Claude cycle. The latter has an expansion valve in addition to the common facilities sharing with the Reverse Brayton cycle. The expansion valve is a main cause to the efficiency loss. It generates a significant amount of entropy associated with its throttling and increases circulation flow rates of the refrigerant and power consumption caused by its leaking resulting in lowered pressure ratio. It is concluded that the Reverse Brayton cycle is more efficient and simpler in control and construction than the Claude cycle.

산업배열회수용 1MW급 유기랭킨 사이클 시스템 개발 (Development of 1MW Organic Rankine Cycle System for Industrial Waste Heat Recovery Put English Title Here)

  • 조한창;박흥수;이용국
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.776-781
    • /
    • 2001
  • To enhance thermal efficiency of thermal facility through recovery of low and medium temperature waste heat, 1MW organic Rankine cycle system was designed and developed. The exhaust gases of $175^{\circ}C$ at two 100MW power plants in pohang steel works were selected as the representative of low and medium temperature waste heat in industrial process for the heat source of the organic Rankine cycle system. HCFC-123, a kind of harmless refrigerant, was chosen as the working fluid for Rankine cycle. The organic Rankine cycle system with selected exhaust gases and working fluid was designed and constructed. From the operation, it was confirmed that the organic Rankine cycle system is available for low and medium temperature waste heat recovery in industrial process. The optimum operating manuals, such as heat-up of hot water, turbine start-up, and the process of electric power generation, were derived. However, electric power generated was not 1MW as designed but only 670kW. It is due to deficiency of pump capacity for supply of HCFC-123. So it is necessary to increase the pump capacity or to decrease the pressure loss in pipe for more improved HCFC-123 supply.

  • PDF

AHP 기법을 이용한 교량상부구조의 VE 검토 (Examination of Value Engineering for Bridge Superstructures using Analytic Hierarchy Process)

  • 박장호;신영석;안예준;이광균
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.79-85
    • /
    • 2009
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types(Steel box girder, Rational girder, PSC-I girder) using Value Engineering(VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost(LCC). Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process(AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.