• Title/Summary/Keyword: Procedure time

Search Result 5,457, Processing Time 0.03 seconds

The Results of Modified Lapidus Procedure on Moderate-to-Severe Hallux Valgus with First Tarso-Metatarsal Joint Hypermobility (제 1족근-중족관절 과운동성과 중등도 이상의 변형을 동반한 무지외반증에 대한 변형 Lapidus 술식의 결과)

  • Lee, Won Young;Sung, Ki-Sun;Chung, Chaehoon
    • Journal of Korean Foot and Ankle Society
    • /
    • v.21 no.3
    • /
    • pp.88-92
    • /
    • 2017
  • Purpose: The objective of this study was to confirm the results of the modified Lapidus procedure on moderate to severe hallux valgus patients with first tarso-metatarsal joint hypermobility. Materials and Methods: A retrospective study was conducted on 42 cases of 35 patients who underwent the modified Lapidus procedure between March 2006 and December 2014. A comparative analysis was performed on the preoperative and postoperative subjective satisfaction of patients and radiologic index. Moreover, the correlation between the follow-up time and patient's operative satisfaction, as well as between the proficiency of the operator and patient's operative satisfaction was analyzed. Complications were also evaluated. Results: Out of the total of 35 patients, 3 were male and 32 were female. The mean age was 61.3 years (range, 34~79 years), and the mean follow-up time was 22.1 months (range, 6~90 months). The overall satisfaction level was 67.6% and the mean hallux valgus angle improved from preoperative $40.5^{\circ}$ to postoperative $12.2^{\circ}$ (p<0.001). The mean 1, 2 intermetatarsal angle improved from preoperative mean of $16.9^{\circ}$ to postoperative mean of $7.6^{\circ}$ (p<0.001), and the sesamoid position improved significantly, from preoperative 2.7 to postoperative 0.9 (p<0.001). Furthermore, there was no correlation between the follow-up time and the American Orthopaedic Foot and Ankle Society (AOFAS) hallux scale; also no correlation between the year the operation took place and the AOFAS hallux scale. In terms of complications, we observed screw irritation in 6 cases, hallux varus in 2 cases, and recurrence of hallux valgus and nonunion in one case. Conclusion: Contrary to our concerns, the level of complications was not high; however, the satisfaction level of patients was also not very high. Therefore, careful selecting of patients and sufficient consultation time is needed before surgery. In addition, since the causes of postoperative dissatisfaction still remain unclear, further studies are necessary.

Design Methods of the Longitudinal Motion-Limiting Devices in Multi-Span Continuous Bridges (다경간연속교의 교축방향 이동제한장치의 설계방법)

  • 전귀현;이지훈
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.2 no.4
    • /
    • pp.145-154
    • /
    • 1998
  • The motion-limiting devices can be used for reducing the maximum and residual displacements of the multi-span continuous bridges with inelastic elements such as isolation bearings and plastic hinges formed in piers. For the design of motion-limiting device, the nonlinear time history analysis is required. But the time history analysis is time consuming and very complex. This study suggests the simple design procedure of the motion-limiting devices using the equivalent elastic analysis method and the acceleration-displacement spectrum concept. The suggested design procedure can be used very effectively for determining the location and gap size of the motion-limiting devices.

  • PDF

Numerical Analysis of Nonlinear Combustion Instability Using Pressure-Sensitive Time Lag Hypothesis (시간지연 모델을 이용한 비선형 연소불안정 해석기법 연구)

  • Park Tae-Seon;Kim Seong-Ku
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.30 no.7 s.250
    • /
    • pp.671-681
    • /
    • 2006
  • This study focuses on the development of numerical procedure to analyze the nonlinear combustion instabilities in liquid rocket engine. Nonlinear behaviors of acoustic instabilities are characterized by the existence of limit cycle in linearly unstable engines and nonlinear or triggering instability in linearly stable engines. To discretize convective fluxes with high accuracy and robustness, approximated Riemann solver based on characteristics and Euler-characteristic boundary conditions are employed. The present procedure predicts well the transition processes from initial harmonic pressure disturbance to N-like steep-fronted shock wave in a resonant pipe. Longitudinal pressure oscillations within the SSME(Space Shuttle Main Engine) engine have been analyzed using the pressure-sensitive time lag model to account for unsteady combustion response. It is observed that the pressure oscillations reach a limit cycle which is independent of the characteristics of the initial disturbances and depends only on combustion parameters and operating conditions.

A STUDY ON THE INFLUENCE OF FLUORIDE TO ENAMEL DECALCIFICATION (불소화합물(弗素化合物)이 법랑질탈회(琺瑯質脫灰)에 미치는 영향(影響)에 관(關)한 연구(硏究))

  • Kim, Yung-Hai
    • Restorative Dentistry and Endodontics
    • /
    • v.13 no.1
    • /
    • pp.173-178
    • /
    • 1988
  • The purpose of the study was to confirm the influence of fluoride to enamel decalcification. Specimens were prepared from 20 extracted teeth. Every tooth was sliced into 4 pieces by means of seperating disc. The pieces with sound enamel were distributed to 4 groups. 1st group was treated with 0.5% NaF solution for 2 minutes. 2nd group was treated with 0.5% NaF solution for 10 minutes. 3rd group was treated with 1% NaF solution for 2 minutes. 4th group was treated with 1% NaP solution for 10 minutes. The enamel surface of each specimen were decalcified with 30% $H_3PO_4$ for 2 minutes and the findings through electron microscope were as follows; 1. The degree of decalcification on the 1st group was greater than that of the 2nd group. 2. Roughness of the 3rd group was slightly higher than that of the 4th group. 3. Under the same procedure of decalcification, the specimen treated by higher conceutration of NaF solution for same length of time showed less decalcified picture. 4. Under the same procedure, of decalcification, the specimens treated by same concentration of NaF solution for different length of time, were compared and found longer the time less decalcified.

  • PDF

Physical-Aware Approaches for Speeding Up Scan Shift Operations in SoCs

  • Lee, Taehee;Chang, Ik Joon;Lee, Chilgee;Yang, Joon-Sung
    • ETRI Journal
    • /
    • v.38 no.3
    • /
    • pp.479-486
    • /
    • 2016
  • System-on-chip (SoC) designs have a number of flip-flops; the more flip-flops an SoC has, the longer the associated scan test application time will be. A scan shift operation accounts for a significant portion of a scan test application time. This paper presents physical-aware approaches for speeding up scan shift operations in SoCs. To improve the speed of a scan shift operation, we propose a layout-aware flip-flop insertion and scan shift operation-aware physical implementation procedure. The proposed combined method of insertion and procedure effectively improves the speed of a scan shift operation. Static timing analyses of state-of-the-art SoC designs show that the proposed approaches help increase the speeds of scan shift operations by up to 4.1 times that reached under a conventional method. The faster scan shift operation speeds help to shorten scan test application times, thus reducing test costs.

Design of Multiple Model Fuzzy Predictors using Data Preprocessing and its Application (데이터 전처리를 이용한 다중 모델 퍼지 예측기의 설계 및 응용)

  • Bang, Young-Keun;Lee, Chul-Heui
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.1
    • /
    • pp.173-180
    • /
    • 2009
  • It is difficult to predict non-stationary or chaotic time series which includes the drift and/or the non-linearity as well as uncertainty. To solve it, we propose an effective prediction method which adopts data preprocessing and multiple model TS fuzzy predictors combined with model selection mechanism. In data preprocessing procedure, the candidates of the optimal difference interval are determined based on the correlation analysis, and corresponding difference data sets are generated in order to use them as predictor input instead of the original ones because the difference data can stabilize the statistical characteristics of those time series and better reveals their implicit properties. Then, TS fuzzy predictors are constructed for multiple model bank, where k-means clustering algorithm is used for fuzzy partition of input space, and the least squares method is applied to parameter identification of fuzzy rules. Among the predictors in the model bank, the one which best minimizes the performance index is selected, and it is used for prediction thereafter. Finally, the error compensation procedure based on correlation analysis is added to improve the prediction accuracy. Some computer simulations are performed to verify the effectiveness of the proposed method.

A Scheduling Problem to Minimize Weighted Completion Time in the Two-stage Assembly-type Flowshop (두 단계 조립시스템에서 총 가중완료시간을 최소화하는 일정계획문제)

  • Yoon, Sang Hum;Lee, Ik Sun;Lee, Jong Hyup
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.2
    • /
    • pp.254-264
    • /
    • 2007
  • This paper considers a scheduling problem to minimize the total weighted completion time in the two-stage assembly-type flowshop. The system is composed of multiple fabrication machines in the first stage and a final-assembly machine in the second stage. Each job consists of multiple components, each component is machined on the fabrication machine specified in advance. The manufactured components of each job are subsequently assembled into a final product on the final-assembly machine. The objective of this paper is to find the optimal schedule minimizing the total weighted completion time of jobs. Three lower bounds are derived and tested in a branch-and-bound (B&B) Procedure. Also, three heuristic algorithms are developed based on the greedy strategies. Computational results show that the proposed B&B procedure is more efficient than the previous work which has considered the same problem as this paper.

Creep analysis of the FG cylinders: Time-dependent non-axisymmetric behavior

  • Arefi, Mohammad;Nasr, Mehrdad;Loghman, Abbas
    • Steel and Composite Structures
    • /
    • v.28 no.3
    • /
    • pp.331-347
    • /
    • 2018
  • In this paper history of stresses, strains, radial and circumferential displacements of a functionally graded thick-walled hollow cylinder due to creep phenomenon is investigated. The cylinder is subjected to an arbitrary non-axisymmetric two dimensional thermo-mechanical loading and uniform magnetic field along axial direction. Using equilibrium, strain-displacements and stress-strain relations, the governing differential equations of the problem containing creep strains are derived in terms of radial and circumferential displacements. Since the displacements are varying with time due to creep phenomenon, an analytical solution is not available for these equations. Thus, a semi-analytical procedure based on separation of variables and Fourier series together with a numerical procedure is employed. The numerical results indicate that the non-axisymmetric loading and the material grading index have significant effect on stress redistributions. Moreover, by proper selection of material for any combination of non-axisymmetric loading, one can arrive suitable response for the cylinder to achieve optimal design. With some simplifications, the results are validated with the existing literature.

A Load Distribution Technique of Web Clustering System based on the Real Time Status of Real Server (웹 클러스터 시스템의 실시간 서버 상태를 기반으로 한 부하분산 방안)

  • Youn, Chun-Kyun
    • The KIPS Transactions:PartA
    • /
    • v.12A no.5 s.95
    • /
    • pp.427-432
    • /
    • 2005
  • I studied about existent load distribution algorithms and the WLC(Weighted Least Connection) algerian that is using much at present to distribute the connection request of users to real servers efficiently in web cluster system. The efficiency of web cluster system is fallen by load imbalance between servers, because there is problem In inaccurate load status measuring of servers and measuring timing at these load distribution algorithms. In this paper, I suggest an algorithm that distributes load base on various load state of servers by real time using broadcasting RPC(Remote Procedure Call) when a user requests connection, and implement a prototype and experiment its performance. The experiment result shows that load imbalance phenomenon between reai sowers was improved greatly than existing method, and performance of web cluster system was improved by efficiency that response time is shortened.

A study for the system voltage and reactive power control (계통전압.무효전력 제어에 관한 연구)

  • 송길영
    • 전기의세계
    • /
    • v.14 no.3
    • /
    • pp.10-17
    • /
    • 1965
  • This paper presents a method of the voltage-reactive power control in the long and short range operations and introduces a conception, "optimum control pattern." The optimum control pattern, aiming at the over-all system control, is defined as the optimum voltage distribution which minimizes the system operating cost under the conditions that the specified power be supplied and the system voltage be kept within the specified bounds. The following procedure was adopted to obtain this optimum pattern. In the first place, a power system was divided into three blocks, namely, load, substation and generator. Lagrange's, multiplier method is applied to each block in turn, paying attention only at the operating voltage distribution. Phase angles at each bus are then modified so that the continuity of active power is maintained. This procedure may be called "block relaxation method with Lagrange's multipliers." In a long range operation, this control pattern determines the optimum installation capacity of reactive power sources. In a short range operation, it also gives the reference state of real time control and the optimum switching capacity of reactive power souces. The real time control problem is also studied from the standpoint of cooperation of control devices such as generators, shunt capacitors, shunt reactors and ratio load controllers. A proposal for the real time control will contribute to the automation of power system operation in the near future. in the near future.

  • PDF