• Title/Summary/Keyword: Probabilistic risk analysis

Search Result 292, Processing Time 0.026 seconds

Analysis of the technical status of multiunit risk assessment in nuclear power plants

  • Seong, Changkyung;Heo, Gyunyoung;Baek, Sejin;Yoon, Ji Woong;Kim, Man Cheol
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.319-326
    • /
    • 2018
  • Since the Fukushima Daiichi nuclear disaster, concern and worry about multiunit accidents have been increasing. Korea has a higher urgency to evaluate its site risk because its number of nuclear power plants (NPPs) and population density are higher than those in other countries. Since the 1980s, technical documents have been published on multiunit probabilistic safety assessment (PSA), but the Fukushima accident accelerated research on multiunit PSA. It is therefore necessary to summarize the present situation and draw implications for further research. This article reviews journal and conference papers on multiunit or site risk evaluation published between 2011 and 2016. The contents of the reviewed literature are classified as research status, initiators, and methodologies representing dependencies, and the insights and conclusions are consolidated. As of 2017, the regulatory authority and nuclear power utility have launched a full-scale project to assess multiunit risk in Korea. This article provides comprehensive reference materials on the necessary enabling technology for subsequent studies of multiunit or site risk assessment.

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Identification and Analysis of External Event Combinations for Hanhikivi 1 PRA

  • Helander, Juho
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.380-386
    • /
    • 2017
  • Fennovoima's nuclear power plant, Hanhikivi 1, $Pyh{\ddot{a}}joki$, Finland, is currently in design phase, and its construction is scheduled to begin in 2018 and electricity production in 2024. The objective of this paper is to produce a preliminary list of safety-significant external event combinations including preliminary probability estimates, to be used in the probabilistic risk assessment of Hanhikivi 1 plant. Starting from the list of relevant single events, the relevant event combinations are identified based on seasonal variation, preconditions related to different events, and dependencies (fundamental and cascade type) between events. Using this method yields 30 relevant event combinations of two events for the Hanhikivi site. The preliminary probability of each combination is evaluated, and event combinations with extremely low probability are excluded from further analysis. Event combinations of three or more events are identified by adding possible events to the remaining combinations of two events. Finally, 10 relevant combinations of two events and three relevant combinations of three events remain. The results shall be considered preliminary and will be updated after evaluating more detailed effects of different events on plant safety.

Development of a Probabilistic Safety Assessment Framework for an Interim Dry Storage Facility Subjected to an Aircraft Crash Using Best-Estimate Structural Analysis

  • Almomani, Belal;Jang, Dongchan;Lee, Sanghoon;Kang, Hyun Gook
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.411-425
    • /
    • 2017
  • Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose-risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research.

A Case Study for the Selection of a Railway Human Reliability Analysis Method (철도 인간신뢰도분석 방법 선정을 위한 사례분석)

  • Jung, Won-Dea;Jang, Seung-Cheol;Wang, Jong-Bae;Kim, Jae-Whan
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.532-538
    • /
    • 2006
  • The railway human reliability analysis(R-HRA) plays a role of identifying and assessing human failure events in the framework of the probabilistic risk assessment(PRA) of the railway systems. This study introduces a case study that was performed to select an appropriate R-HRA method. Three HRA methods were considered in the case study: (1) the K-MRA(THERP/ASEP-based) method, (2) the HEART method, (3) the RSSB-HRA method. Two case events were selected based on the review of the railway incidents/accidents, which include (1) a real-end collision event, which occurred on the railway between the Gomo and Kyungsan stations in 2003, (2) the signal passed at danger(SPAD) events, which are caused from a variety of factors. The three HRA methods were applied to both case events, and then the strengths and limitations of each method were derived and compared with each other from the viewpoint of the applicability of a HRA method to the railway industry.

Probabilistic Risk Assessment Techniques for the Risk Analysis of Construction Projects (건설공사의 위험도분석을 위한 확률적 위험도 평가)

  • 조효남;임종권;박영빈
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.04a
    • /
    • pp.27-34
    • /
    • 1997
  • In this paper, systematic and comprehensive approaches are suggested for the application of quantitative PRA techniques especially for those risk events that cannot be easily evaluated quantitatively In addition, dominant risk events are identified based on their occurrence frequency assessed by both actual survey of construction site conditions and the statistical data related with the probable accidents. Practical FTA(Fault Tree Analysis) and ETA(Event Tree Analysis) models are used for the assessment of the identified risks. When the risk events are lack of statistical data, appropriate Bayesian models incorporating engineering judgement and test results are also introduced in this paper. Moreover, a fuzzy probability technique is used for the quantitative risk assessment of those risk components which are difficult to evaluate quantitatively.

  • PDF

Probabilistic Forecasting of Seasonal Inflow to Reservoir (계절별 저수지 유입량의 확률예측)

  • Kang, Jaewon
    • Journal of Environmental Science International
    • /
    • v.22 no.8
    • /
    • pp.965-977
    • /
    • 2013
  • Reliable long-term streamflow forecasting is invaluable for water resource planning and management which allocates water supply according to the demand of water users. It is necessary to get probabilistic forecasts to establish risk-based reservoir operation policies. Probabilistic forecasts may be useful for the users who assess and manage risks according to decision-making responding forecasting results. Probabilistic forecasting of seasonal inflow to Andong dam is performed and assessed using selected predictors from sea surface temperature and 500 hPa geopotential height data. Categorical probability forecast by Piechota's method and logistic regression analysis, and probability forecast by conditional probability density function are used to forecast seasonal inflow. Kernel density function is used in categorical probability forecast by Piechota's method and probability forecast by conditional probability density function. The results of categorical probability forecasts are assessed by Brier skill score. The assessment reveals that the categorical probability forecasts are better than the reference forecasts. The results of forecasts using conditional probability density function are assessed by qualitative approach and transformed categorical probability forecasts. The assessment of the forecasts which are transformed to categorical probability forecasts shows that the results of the forecasts by conditional probability density function are much better than those of the forecasts by Piechota's method and logistic regression analysis except for winter season data.

Earthquake hazard and risk assessment of a typical Natural Gas Combined Cycle Power Plant (NGCCPP) control building

  • A. Can Zulfikar;Seyhan Okuyan Akcan;Ali Yesilyurt;Murat Eroz;Tolga Cimili
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.581-591
    • /
    • 2023
  • North Anatolian Fault Zone is tectonically active with recent earthquakes (Mw7.6 1999-Kocaeli and Mw7.2 1999-Düzce earthquakes) and it passes through Marmara region, which is highly industrialized, densely populated and economically important part of Turkey. Many power plants, located in Marmara region, are exposed to high seismic hazard. In this study, open source OpenQuake software has been used for the probabilistic earthquake hazard analysis of Marmara region and risk assessment for the specified energy facility. The SHARE project seismic zonation model has been used in the analysis with the regional sources, NGA GMPEs and site model logic trees. The earthquake hazard results have been compared with the former and existing earthquake resistant design regulations in Turkey, TSC 2007 and TBSCD 2018. In the scope of the study, the seismic hazard assessment for a typical natural gas combined cycle power plant located in Marmara region has been achieved. The seismic risk assessment has been accomplished for a typical control building located in the power plant using obtained seismic hazard results. The structural and non-structural fragility functions and a consequence model have been used in the seismic risk assessment. Based on the seismic hazard level with a 2% probability of exceedance in 50 years, considered for especially these type of critical structures, the ratios of structural and non-structural loss to the total building cost were obtained as 8.8% and 45.7%, respectively. The results of the study enable the practical seismic risk assessment of the critical facility located on different regions.

Feasibility Study of Seismic Probabilistic Risk Assessment for Multi-unit NPP with Seismic Failure Correlation (다수기의 확률론적 지진안전성 평가를 위한 지진손상 상관계수의 적용)

  • Eem, Seunghyun;Kwag, Shinyoung;Choi, In-Kil
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.5
    • /
    • pp.319-325
    • /
    • 2021
  • The 2011 East Japan Earthquake caused accidents at a number of nuclear power plants in Fukushima, highlighting the need for a study on the seismic safety of multiple NPP (Nuclear Power Plant) units. In the case of nuclear power plants built on a site that shows a similar seismic response, there is at least a correlation between the seismic damage of structures, systems, and components (SSCs) of nuclear power plants. In this study, a probabilistic seismic safety assessment was performed for the loss of essential power events of twin units. To derive an appropriate seismic damage correlation coefficient, a probabilistic seismic response analysis was performed. Using the external event mensuration system program, we analyzed the seismic fragility and seismic risk by composing a failure tree of multiple loss of essential power events. Additionally, a comparative analysis was performed considering the seismic damage correlation between SSCs as completely independent and completely dependent.

Design Improvement to a Research Reactor for Safety Enhancement using PSA (PSA를 이용한 연구용 원자로 안전성 향상 방안 도출)

  • Lee, Yoon-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.157-163
    • /
    • 2018
  • This paper describes design improvement to a research rector for safety enhancement using Probabilistic Safety Assessment (PSA). This PSA under reactor design was undertaken to assess the level of safety for the design of a research reactor and to evaluate whether it is probabilistically safe to operate and reliable to use. The scope of the PSA reported here is a Level 1 PSA, which addresses the risks associated with the core damage. The technical objectives of this study were to identify accident sequences leading to core damage and to derive design improvement from the dominant accident sequences through the sensitivity analysis. The AIMS-PSA and FTREX were used for the this PSA of the research reactor. The criterion for inclusion was all sequences with a point estimate frequency greater than a truncation value of 1.0E-14/yr. The final result indicates a point estimate of 6.79E-05/yr for the overall Core Damage Frequency (CDF) attributable to internal initiating events for the research reactor under design. Based on the dominant accident sequences from the PSA, the seven kinds of sensitivity analysis were performed and some design improvement items were derived. When the five methods to improve the safety were all applied to the reactor design and emergency operating procedure, its risk was reduced to about 1.21E-06/yr from 6.79E-05/yr. The contribution of LOCA and LOEP with high CDF were significantly reduced by the sensitivity analysis. The safety of the research reactor was well improved and the risk was reduced than before adapting the design improvement gotten from the sensitivity analysis. The present study indicated that the research reactor has the well-balanced safety in regard to each initiating event contribution to CDF. The PSA methodology is very effective to improve reactor safety in a conceptual design phase and especially, Risk-informed design(RID) is very nice way to find the deficiencies of research reactor under design and to improve the reactor safety by solving them.