• Title/Summary/Keyword: Priority Order of Restoration

Search Result 38, Processing Time 0.022 seconds

The Development and Application of Habitats Environment Evaluation Model - Focused on local environmental assessment for determining priority areas for the implementation of green roof in Seoul - (생물서식지 환경평가모델 개발 및 적용에 관한 연구 - 서울시내 옥상녹화 우선 조성지역 도출을 위한 지역환경평가를 중심으로 -)

  • Yoon, So Won
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.3
    • /
    • pp.53-66
    • /
    • 2005
  • The objective of this study is the classification of priority areas for the implementation of green roof by evaluating environmental deterioration in Seoul. Non-permeable pavement, air pollution, habitual floods, energy use, heat island and green space are considered in this assessment indicators. The expert questionnaire survey was conducted in order to determine the most important indicators. These indicators were then, thoroughly evaluated. As a result, high priority areas for the implementation of green roof were deduced in the following order of the districts : Jung, Sungdong, Jungrang, Youngdungpo, Jongro and Kangnam. The highest priority areas were determined to be crowded business-commercial areas. Low priority areas are analyzed in the following order of the districts : Kwanak, Nowon, Seocho and Dobong. The result of this study can be utilized for environmental planning and decision of related policies. Additionally, it can be promoted that awareness of implementing green roof of citizens, policy makers and building owners and effect of green networking between inside and outside Seoul can be increased.

The Development of Multi-Fault Restoration Algorithm for Distribution Network (배전계통 광역 정전복구 알고리즘 개발)

  • Jung, Jin-Soo;Lee, Seung-Jae;Jung, Jong-Wook;Lim, Young-Bae;Bae, Seok-Myung;Yi, Geon-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.3
    • /
    • pp.69-77
    • /
    • 2006
  • This paper presents the service restoration in electric power distribution systems. The aim of the service restoration is to control an emergency taken place in distribution systems and to restore out-of service areas as soon as possible when a fault occurs in distribution systems. For this reason, new service restoration strategies in multi-outage area are suggested in this paper. The suggested algorithm consist of two schemes. One is an individual restoration scheme, the other is an integrated restoration scheme. The former determines a restoration order of outage areas based on a restoration index. Unless the former scheme can generate a feasible restoration plan, the latter one will try to find out a new configuration without an overloaded section through tie exchange method.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

Importance and Priority of Indicators for Selection of Plant Species for Ecological Restoration (생태복원용 식물종 선정을 위한 지표의 중요도·우선순위)

  • Sung, Jung-Won;Shin, Hyun-Tak;Yu, Seung-Bong;Park, Seok-Gon
    • Korean Journal of Environment and Ecology
    • /
    • v.36 no.3
    • /
    • pp.327-337
    • /
    • 2022
  • Ecological restoration is considered a good means to prevent biodiversity loss in terms of the ecosystem's health and sustainability. However, there are difficulties in putting it into practice as there is no comprehensive and objective standard for the selection of plant species, such as environmental, ecological factors, and restoration goal setting. Therefore, this study developed an evaluation index necessary for selecting plant species for restoration using the Delphi method that synthesizes the opinions of the expert group. A survey with 38 questionnaires was conducted twice for experts in ecological restoration, etc., and the importance and priority of evaluation indicators were analyzed by dividing the restoration targets into inland and island regions. The result of the importance analysis showed that "native plants" had the highest average of 4.9 among the evaluation indices in both inland and island regions, followed by "seed security", "propagation", and "root growth rate". In the inland region, the index priority was analyzed in the order of "native plants", "appearance frequency", "root growth rate", "distribution range", and "seed security" in the island region, it was analyzed in the order of "native plants", "root growth rate", "appearance frequency", "distribution range", and "tolerance", showing slight differences between the two indicators. As a result of the importance and priority indicator analysis, we set the mean importance and priority of 4.1 and 2.9, respectively, in the inland region and 4.2 and 2.9, respectively, in the island region. As for the criteria of selecting plant species for ecological restoration, the "native plants" had the highest importance and priority. "Seed securing", 'viability", "topography", "proliferation", "tolerance", "soil conditions", "growth characteristics", "early succession", "distribution range", "appearance frequency", and "germination rate" were classified into subgroups of low importance and priority. The lowest indicators were "final stage of succession", "transition period", 'transition stage", "root", "reproduction", "soil", "appearance", "technology", "landscape", "climate", and "germination rate". We expected that the findings through objective verification in this study would be used as evaluation indicators for selecting native plant species for ecological restoration.

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

Selection Method for Installation of Reduction Facilities to Prevention of Roe Deer(Capreouls pygargus) Road-kill in Jeju Island (제주도 노루 로드킬 방지를 위한 저감시설 대상지 선정방안 연구)

  • Kim, Min-Ji;Jang, Rae-ik;Yoo, Young-jae;Lee, Jun-Won;Song, Eui-Geun;Oh, Hong-Shik;Sung, Hyun-Chan;Kim, Do-kyung;Jeon, Seong-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.5
    • /
    • pp.19-32
    • /
    • 2023
  • The fragmentation of habitats resulting from human activities leads to the isolation of wildlife and it also causes wildlife-vehicle collisions (i.e. Road-kill). In that sense, it is important to predict potential habitats of specific wildlife that causes wildlife-vehicle collisions by considering geographic, environmental and transportation variables. Road-kill, especially by large mammals, threatens human safety as well as financial losses. Therefore, we conducted this study on roe deer (Capreolus pygargus tianschanicus), a large mammal that causes frequently Road-kill in Jeju Island. So, to predict potential wildlife habitats by considering geographic, environmental, and transportation variables for a specific species this study was conducted to identify high-priority restoration sites with both characteristics of potential habitats and road-kill hotspot. we identified high-priority restoration sites that is likely to be potential habitats, and also identified the known location of a Road-kill records. For this purpose, first, we defined the environmental variables and collect the occurrence records of roe deer. After that, the potential habitat map was generated by using Random Forest model. Second, to analyze roadkill hotspots, a kernel density estimation was used to generate a hotspot map. Third, to define high-priority restoration sites, each map was normalized and overlaid. As a result, three northern regions roads and two southern regions roads of Jeju Island were defined as high-priority restoration sites. Regarding Random Forest modeling, in the case of environmental variables, The importace was found to be a lot in the order of distance from the Oreum, elevation, distance from forest edge(outside) and distance from waterbody. The AUC(Area under the curve) value, which means discrimination capacity, was found to be 0.973 and support the statistical accuracy of prediction result. As a result of predicting the habitat of C. pygargus, it was found to be mainly distributed in forests, agricultural lands, and grasslands, indicating that it supported the results of previous studies.

A Study on the Land Purchase Priority Measurement of the Riparian Areas in Yeongsan and Seomjin River Basin - Focusing on the Riparian Areas of the Juam Lake - (영산강·섬진강수계 수변구역 토지매수 우선순위 산정에 관한 연구 -주암호 수변구역을 사례로 -)

  • Shim, Yun-Jin;Cha, Jin-Yeol;Park, Yong-Su;Lee, Dong-Jin;Seo, Yun-Hee;Hong, Jin-Pyo;Cho, Dong-Gil
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.17 no.1
    • /
    • pp.173-184
    • /
    • 2014
  • Riparian areas are significant functional grounds for inhabiting ecological system on the river such as the self-regulation of the water quality and the foundation of important corridors. For such functional device to operate, consecutive land purchase scheme that prioritizes targeted areas with high pollutant load rate imposes sustainable development of the ecological riparian belt. The purpose of this study is focused on measuring the methodology for selecting land purchse order before establishing riparian belt in accordance with pollution loading estimation and the basin approach. The Yeongsan and Seomjin river which includes targeted areas of the land purchase have been classified into the large-medium-small(standard basin) influence areas based on their catchment rage, which than sub-divided the research area of Juam lake by 38 small basins and 223 units. Small basins with the high pollution load rates have been assessed as the first prioritized targets. For the second priority, the condition of the point pollutant sources, original area of the targets, original restored area were concerned. The final decision of the land purchase order targeted only those within 50 meter range from the basin. To validate the accumulated data, the on-site investigation went along the targeted zones, which the result shows that all prioritized areas included both point and non-point pollutant sources, and had not a small originally restored areas.

A Study on Land Acquisition Priority for Establishing Riparian Buffer Zones in Korea (수변녹지 조성을 위한 토지매수 우선순위 산정 방안 연구)

  • Hong, Jin-Pyo;Lee, Jae-Won;Choi, Ok-Hyun;Son, Ju-Dong;Cho, Dong-Gil;Ahn, Tong-Mahn
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.17 no.4
    • /
    • pp.29-41
    • /
    • 2014
  • The Korean government has purchased land properties alongside any significant water bodies before setting up the buffers to secure water qualities. Since the annual budgets are limited, however, there has always been the issue of which land parcels ought to be given the priority. Therefore, this study aims to develop efficient mechanism for land acquisition priorities in stream corridors that would ultimately be vegetated for riparian buffer zones. The criteria of land acquisition priority were driven through literary review along with experts' advice. The relative weights of their value and priorities for each criterion were computed using the Analytical Hierarchy Process(AHP) method. Major findings of the study are as follows: 1. The decision-making structural model for land acquisition priority focuses mainly on the reduction of non-point source pollutants(NSPs). This fact is highly associated with natural and physical conditions and land use types of surrounding areas. The criteria were classified into two categories-NSPs runoff areas and potential NSPs runoff areas. 2. Land acquisition priority weights derived for NSPs runoff areas and potential NSPs runoff areas were 0.862 and 0.138, respectively. This implicates that much higher priority should be given to the land parcels with NSPs runoff areas. 3. Weights and priorities of sub-criteria suggested from this study include: proximity to the streams(0.460), land cover(0.189), soil permeability(0.117), topographical slope(0.096), proximity to the roads(0.058), land-use types(0.036), visibility to the streams(0.032), and the land price(0.012). This order of importance suggests, as one can expect, that it is better to purchase land parcels that are adjacent to the streams. 4. A standard scoring system including the criteria and weights for land acquisition priority was developed which would likely to allow expedited decision making and easy quantification for priority evaluation due to the utilization of measurable spatial data. Further studies focusing on both point and non-point pollutants and GIS-based spatial analysis and mapping of land acquisition priority are needed.

A Study on the Selection of Non-point Pollution Management Regions with High Priority Order in the Yeongsan River Basin (영산강수계 비점오염원 중점관리지역 선정에 관한 연구)

  • Lee, JaeChoon;Park, HyeLin;Lim, ByungJin;Lee, ChangHee;Lee, SuWoong;Lee, YongWoon
    • Korean Journal of Ecology and Environment
    • /
    • v.45 no.4
    • /
    • pp.347-355
    • /
    • 2012
  • In this study, non-point pollution sources in the Yeongsan river basin are analyzed; then, the priority regions (areas divided on a small scale) of management are selected for efficient water management of the Seungcheon and Jooksan reservoirs, which were constructed as one of the 4 major rivers restoration projects. The priority regions are decided by using the criteria of the excessive rate of target water quality, non-point pollution load per unit area, total TP load and down flow distance. The results of this study are as follows. The upper 10% of the priority regions for non-point pollution management includes YB15, YB05, YB10, YB24, YB14 and YB11 for the Seungcheon reservoir watershed, and YC24, YC25, YC30, YC34, YC22 and YC17 for the Jooksan reservoir watershed. However, a few regions in each of the Seungcheon and Jooksan reservoirs need to be selected in higher order, and the non-point pollution removal facilities in the regions need to be installed with respect to budget, urgent matter, and so on.