The 9th International Conference on Construction Engineering and Project Management
/
pp.1254-1254
/
2022
The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.
In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules when the collective maintenance schedule reported to 50 by Gencos not satisfy the specified operating criteria, such as system reliability or supply adequacy. This paper presented a method that divides generator maintenance scheduling of the 50 into a master-problem and a sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem. And, the 50 should use the open information only, because the information such as cost function of a generator and bidding Price is highly crucial for the strategies of profit maximization.
Purpose - The purpose of the study is to reexamine the price fairness as practiced by low cost airlines, as a consumer has to experience such inconveniences as inferior airport transportation, extra fees on in-flight meals, and non-negotiable seats, and consumers evaluate such experiences keeping in mind their total costs. This evaluation includes price fairness and allows a reasonable and overall consideration of factors of low cost airlines. It tries to set up a measurement of the indicators consumers' perceptions of price fairness academically as it adapts price fairness to airline services which are renowned for price volatility. Research design, data, and methodology - The research proposes an alternative pricing strategy for the long term profit of low cost airlines after going over conflicts between the traditional theory of consumers' price perception mechanism and flexible fair policy of low cost airlines. It was meaningful when it relates to the early stage of the business, while it enhances the risks relating to the long term survival of low cost airlines. In addition, it is significant as it highlights the negative influences on consumers' perceptions of price fairness, as low cost airlines run on extremely low cost perspectives. Results - The results of the research provide insight into four perspectives, as consumers' perceptions of price fairness are influenced by the frequency and range of price changes and services. The first perspective is that it would lead to positive price evaluation when a low cost airline cuts prices frequently with little changes than one big change. It also would lead to the same result when it comes to necessary services. The second perspective is that one big increase of price would rather undermine the negative aspects of price changes than those of several smaller ones. The third perspective is that additional services would be good to consumers' perceptions of price fairness as compared to discount benefits with respect to the cost. Finally, a low cost airline should consider that consumers will change airlines or defer their flight schedule if the flight fares increase beyond their limits. Conclusions - Low cost airlines should reconsider their pricing policies for services that were provided free earlier. A consumer would not like discount benefits when made to pay for services that were, for long, free of charge. If a low cost airline can provide services with no charge, it should improve volumes if the costs are standardized and, moreover, should consider the charging fees. Alternatively, a consumer can choose between services and fair discount. Low cost airlines are implementing sales promotion strategies, as the competition is more intense than it used to be. In these days, they should regard services over sales promotion, as consumers may prefer to spend money on good premium services. Some differentiation in services could create a good market position for the airlines and, hence, good financial performance.
The pickup and delivery problem with time windows generally involves the construction of optimal routeswhich satisfy a set of transportation requests under pairing, precedence, time window, vehicle capacity, andavailability constraints. In this paper, we added some constraints to the problem and adopted an objectivefunction based on number of used vehicles, total travel distance and total schedule duration to consider morerealistic problems. A branch and price algohthm for the problem is proposed and an enumeration method is usedfor the subproblems. The algorithm was tested on randomly generated instances and computational results werereported.
Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.
Smart grid (SG) technology is now elevating the conventional power grid system to one that functions more cooperatively, responsively, and economically. When applied in an SG the demand side management (DSM) technique can improve its reliability by dynamically changing electricity consumption or rescheduling it. In this paper, we propose a new SG scheduling scheme that uses the DSM technique. To achieve effective SG management, we adopt a mixed pricing strategy based on the Rubinstein-Stahl bargaining game and a repeated game model. The proposed game-based pricing strategy provides energy routing for effective energy sharing and allows consumers to make informed decisions regarding their power consumption. Our approach can encourage consumers to schedule their power consumption profiles independently while minimizing their payment and the peak-to-average ratio (PAR). Through a simulation study, it is demonstrated that the proposed scheme can obtain a better performance than other existing schemes in terms of power consumption, price, average payment, etc.
In Korea, the price schedule for local telephone combines two-part tariffs and peak-load pricing subject to rate-of-return (RoR) regulation. Although the effect of RoR regulation on two-part tariffs or peak-load pricing has been separately analyzed by many authors in some detail, the behaviour of regulated firm under combined two-part and peak-load pricing has not been studied until now. This paper examines the effect of regulation on the rate structure and welfare under combined two-part and peak-load pricing.
In TWBP new uncertainty will be increased. Risk management is risen to a important problem. Vesting contract makes market Players trade at fixed price in TWBP early stages. In the case of advanced country, market players manage risk with a future contract. When a risk management method moves from vesting contract to future contract, it may have to use together two contracts for schedule period. In this paper, risk management strategy that use vesting contract and forward contract at the same time is proposed.
한옥에 대한 관심이 급증을 하고 있는 가운데, 가격경쟁력을 갖춘 신한옥이 개발되고 있다. 이러한 신한옥 개발에 있어서, 공법의 개발은 필수적이다. 이에, 본고에서는 신한옥의 개발과정 중 실제 건설된 전통한옥 1채와 신한옥 2채의 사례를 중심으로 신공법 사례 소개와 각 한옥의 부위별 공법을 비교하였다. 또한, 부위별 공법별로 공사비 및 공기의 영향도를 분석하였다. 그 결과, 전통한옥 대비 신한옥의 공사비는 모든 부위에서 저감되었으며, 공기는 대부분의 부위에서 단축되었다. 두 신한옥 사례의 분석 결과, 목재 구조체와 지붕의 공사비 및 공기 비율이 가장 높았으며, 다음으로 벽체, 바닥, 창호, 기초 순으로 나타났다. 효과적인 공사비 저감 및 공기 단축을 위해서는 목재 구조체 및 지붕 부위의 공법개발에 집중해야 한다.
최근 우리나라는 전력산업의 효율성 향상과 경쟁체제 강화를 위하여 발전시장을 민간에 개방하고, 경쟁입찰에 의해 민전 사업자의 진입을 확대하고 있다. 이러한 민전 사업에 있어서 향후 전력요금의 지불패턴은 매우 중요하다. 현재는 용량요금에는 균등화 지불패턴을 그리고 전력량 요금에는 물가상승률을 반영하고 있다. 본 논문은 일반전기사업자와 발전사업자간의 전력거래시 발생하는 연도별 요금수준을 각종 지불패턴에 따라 산정하는 방법을 제시하고, 그 결과를 비교 분석하였다. 분석 결과, 양사간의 위험도를 분산할 수 있는 부분 하향식 지불패턴이 우리나라 전력시장에서 적용가능성이 크고, 할인율의 요금에 대한 영향이 큰 것으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.