• Title/Summary/Keyword: Price calculation

Search Result 191, Processing Time 0.028 seconds

On the Hydrodynamic Coefficients of a 3-dimensional Body with a Forward Speed (전진속도를 고려한 3차원 물체의 동유체력해석)

  • J.K.,Choi;K.P.,Rhee
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.25 no.3
    • /
    • pp.19-25
    • /
    • 1988
  • The three-dimensional boundary value problem for the unsteady motion of a ship which is translating and oscillating on the free surface of a deep water formulated. Under the assumption that the forward speed is small and order of $\varepsilon$, all formulations are made up to the first order of $\varepsilon$. For the numerical calculation, the three-dimensional source distribution method is applied, and the triangular elements are used to represent the hull surface. The results for the added mass and the damping coefficient for Series 60, $C_B=0.7$ at Fn=0 and Fn=0.2 shows good agreements with those of Inglis, Chang, and Inglis and Price.

  • PDF

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Chung Jong-Duk;Kim Jeong-Guk;Pyun Jang-Sik;Kim Pil-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.551-556
    • /
    • 2004
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The life-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

  • PDF

A Study on Caculation and Decomposition of Bus Incremental Cost on Pourer System Operation (계통운전상태에서의 모선증분비용 산정 및 분해에 관한 연구(II))

  • Kim, Yong-Ha;Lee, Buhm;Choi, Sang-Kyu;Moon, Hyuc-Ki;Lee, Jae-Gul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.9
    • /
    • pp.528-534
    • /
    • 2003
  • In this paper we propose the new method for calculating the Bus Incremental Cost using bus voltage magnitude and angle. And perform the decomposition of Bus Incremental Cost on power system operation. In this method, we calculate the Shadow Price that is derived from using power flow calculation results. The proposed Method is applied to IEEE-30 and the result shows the effectiveness of the method.

Proposal of Domestic coal Price Cap Calculation Process and Beneficial Effects Analysis (국내탄발전기 적정상한가격 산정절차 제안 및 적용효과 분석)

  • Baek, Sun-Hee;Kim, Kwang-In;Kim, Kwang-Chul;Kim, Yum-Hyung
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.834-835
    • /
    • 2007
  • 2007년 하반기부터 국내탄 발전소에 대한 기반기금 지원방식이 변경 적용된다. 현행 발전소 변동비에 대한 시장정산금과의 차액보전에서 국내탄 사용량당 단가지원방식으로 변경된다. 기반기금 지원방식변경과 동시에 현행 전력시장운영규칙 부칙에 의거 국내탄발전소 용량가격이 일반발전기 수준으로 조정된다. 이러한 제도 변경시 국내탄발전소의 수입은 감소 전망으로 현행 적용하고 있는 BLMP수준의 국내탄 상한가격에서 제도변화를 반영한 적정 상한가격 수준설정은 전력시장운영에 있어 매우 중요하다. 기반기금 지원식 변경과 적정 상한가격 운영은 발전회사에게 많은 비용절감 유인을 제공하여 수입창출노력을 할 것으로 보이며, 발전기 이용률 제고 효과를 발휘할 것으로 전망된다. 본 논문에서는 합리적인 상한가격 산정에 필요한 상한가격 산정절차를 수립하고 국내탄발전소 제도개선 종합효과를 분석하고자 한다.

  • PDF

Fuel Cycle Analysis of Heavy Water-Moderated Reactor System

  • Paik, In-Kul;Kim, Jin-Soo;Lee, Chang-Kun;Chung, Chang-Hyun;Kim, Chang-Hyo
    • Nuclear Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.15-31
    • /
    • 1977
  • New conception of batch and period is defined appropriate for the on-power refuelling scheme of a heavy water-moderated reactor, A computer code (“HWRCOST”) is developed using nuclear fuel cycle economic equations based on the continuous energy calculation method. The fuel cycle cost of the CANDU-PHW reactor is calculated and sensitivity analyses are performed with variation of uranium ore price, fabrication cost, spent fuel permanent disposal expenses, and capacity fctor.

  • PDF

Implementation of Bluetooth Secure Simple Pairing (SSP) using Elliptic Curve Cryptography (ECC)

  • Alfarjat, Ahmad Hweishel A.;Hanumanthappa, J.;Hamatta, Hatem S.A.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.3
    • /
    • pp.60-70
    • /
    • 2021
  • In this paper we study the problem of implementation of security issues of blue tooth, especially secure simple pairing, with the help of an efficient four user authenticated key (4UAK) for an elliptic curve cryptography (ECC). This paper also deals with the design, implement and performance evaluation of secure simple pairing (SSP) using an elliptic curve cryptography, such as Diffie Hellman protocol when four users are involved. Here, we also compute the best, worst and average case step counts (time complexities). This work puts forth an efficient way of providing security in blue tooth. The time complexity of O(n4) is achieved using Rabin Miller Primality methodology. The method also reduces the calculation price and light communication loads.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.

A Study on the Analysis of Current Situation of Safety Inspections cost in Apartment houses (공동주택 안전점검대가 현황분석에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Yun, Yeong-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.62-70
    • /
    • 2014
  • An apartment house, a private facility, is a house built for many persons to live independently in a building. An apartment house is a building where life damage can happen most in case of a safety accident due to insufficient inspections. However, formal inspections are being realized due to awareness shortage of managing bodies about safety inspection and low-price order-receiving of diagnosing enterprises via the lowest bidding method. This is because it is judged that remarkable costs are inputted in repairs and reinforcement such as maintenance of a structure and that there is a large possibility of human damage in case of a safety accident in a structure. So, this paper aims to derive the points to improve in the current criterion to execute an efficient detailed inspection. As its method, the design price and execution price situation of 66 buildings inspected in detail for recent 3 years for the class 2 facilities in Gwangju Metropolitan City and Jeonranam-do are examined and analyzed. The state2 object buildings to inspect are selected through this. And this paper aims to present the points to improve through the analysis of current problems by evaluating the detailed inspection report and the detailed inspection execution price calculation criterion for the selected 10 apartment houses.

Comparison of Three Selection Indexes for Selecting Varieties from Performance Trials of Corn, Zea mays L. (옥수수의 생산력 검정시험에 대한 3가지 선발지수의 효과비교)

  • Choe, Bong-Ho;Cochran, Dale E.
    • Korean Journal of Agricultural Science
    • /
    • v.4 no.1
    • /
    • pp.34-42
    • /
    • 1977
  • Three kinds of selection indexes were calculated and compared for effectiveness in selecting best performing hybrids from yield trial of corn. The following four characters were used in calculating indexes; yield, moisture content, and root and stalk lodging. 1. Among three indexes calculated, William's base index was more simple in calculation and more efficient in selection of a hybrid than other indexes. 2. Pesek and Baker's estimated index was considered less effective in this test, because of low estimation of genetic variance and covariances of characters from the limited materials and years of experiment. 3. Index calculated according to the Purdue University method (1976) was least effective, even though calculation was simple and easy. The less effectiveness of the index was due to the fact that equal importance of characters were given to each character without considering the differences in economic weight of each character. 4. Equations for expressing moisture content and root and stalk lodging in terms of market price were formulated and they were as follow : 1) Moisture content : $(Y-15.5){\times}$0.0065{\times}bushels/acre$, where Y was the average moisture content of a hybrid at the time harvest. The $0.0065 was the expenses required for removing one per cent of moisture from a bushel of shelled corn in 1976. 2) Root and stalk lodging:$Percent\;lodging{\times}price/Bu.{\div}50{\div}average$ yield of all entries in the test.

  • PDF