• Title/Summary/Keyword: Price Fluctuation Rate

Search Result 61, Processing Time 0.023 seconds

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

Effects on the Fishing Industry of Changes in Foreign Exchange Rates;-The Pass-Through of Exchange Rate Changes to Export Price- (환율변동이 수산업에 미치는 영향;-수출가격에의 전가도를 중심으로-)

  • 박영병;어윤양
    • The Journal of Fisheries Business Administration
    • /
    • v.26 no.2
    • /
    • pp.75-92
    • /
    • 1995
  • This paper tried to estimate the pass - through of exchange rate changes to export price of fishery products using export price function. The results are as follows : 1) The variable of fluctuation of exchange rate of Won(equation omitted) to Yen(equation omitted)(variable E2) is more powerful explanatory variable than that of Won to U.S. dollar to explain the fluctiation of export price of fishery products(varible $P_{t}$)- 2) The variable of fish catches(variable K $P_{t}$) is also found to be a statistically significant varible but that of producer price index is not found. 3) The variable E2 have statistically a more influence on variable $P_{t}$ than variable K $P_{t.}$ 4) The estimation shows us that 1% of fluctuation of variable E2 could result in 0.9978% of fluctuation of variable $P_{t.}$

  • PDF

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

Estimation of Volatility of Korea Stock Price Index Using Winbugs (Winbugs를 이용한 우리나라 주가지수의 변동성에 대한 추정)

  • Kim, Hyoung Min;Chang, In Hong;Lee, Seung Woo
    • Journal of Integrative Natural Science
    • /
    • v.4 no.2
    • /
    • pp.121-129
    • /
    • 2011
  • The purpose of this paper is to estimate the fluctuation of an earning rate and risk management using the price index of Korea stocks. After an observation of conception of fluctuation, we can show volatility clustering and fluctuation phenomenon in the Korea stock price index using GARCH model with heteroscedasticity. In addition, the effects of fluctuation on the time-series was evaluated, which showed the heteroscedasticity. MCMC method and Winbugs as Bayesian computation were used for analysis.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

An Empirical Study on the Economic Development Effects on Kazakhstan Focusing on the Macroeconomic Indices: International Oil Price, Interest Rate, Real Exchange Rate (카자흐스탄 경제발전에 대한 실증연구 : 국제유가·이자율·실질환율을 중심으로)

  • Hwang, Yun-Seop;Kim, Kyung-Hee;Kim, Soo-Eun
    • International Area Studies Review
    • /
    • v.14 no.1
    • /
    • pp.77-97
    • /
    • 2010
  • Recently, countries on the Caspian Sea were had heavily interested due to instability of international resource market. These countries having been developed basing on energy exports, especially Kazakhstan have drastically grown during a decades. However economy, heavily relied on the exports of energy, is influenced on fluctuation in the international energy price as well as sometimes exposed at Dutch disease. These days, Kazakhstan, increased trade and investment with Korea, has been on the rise as new supplier for energy. Therefore, economic change in Kazakhstan can be an important issue. In this paper, we analyze relations among oil price, interest rate, and real exchange rate during sample period from January 1999 to December 2008 expanding Balasa-Samuelson model. Empirical results present that oil price, interest rate, and real exchange rate mutually keep their balance. Eventually, we find out Kazakhstan has exposed at Dutch disease since oil price and interest rate have negative impacts on real exchange rate respectively.

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

Characteristics of Modernized Hanok for development Estimate system. (개략견적 기법 개발을 위한 신한옥 특성 분석)

  • Kim, Hyo-Sun;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.124-125
    • /
    • 2013
  • The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.

  • PDF