A Study on Improvement of Feasibility Evaluation for Public Projects (공공사업 타당성 평가의 개선 방안에 관한 연구)

  • Park, Seung-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.2
    • /
    • pp.163-168
    • /
    • 2017
  • The feasibility evaluation of public projects has been carried out mainly in the economic analysis. However, items of political, technological and balanced regional development aspects are further evaluated by applying analytic hierarchy process, This paper suggests to analyzes preliminary feasibility study of construction and research & development project during the past three years and to verify correlation between B/C ratio and AHP weight. The result shows that the correlation between cost benefit ratio and the weight of the hierarchy is 0.744 in construction projects and 0.899 in research & development project. Namely, AHP weight be under the control of B/C ratio and is devoted to its role against expectation. Therefore it must be sufficiently discussed in various designs of studies to maximize the effects of AHP analysis.

A Technical Analysis of Real Time Location System for Automation in Construction (건설작업 자동화를 위한 실시간위치추적시스템 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Due to its high dependency of manpower, construction work has several difficulties in terms of quality control, imbalance of supply and demand of qualified manpower, safety management for them and improvement of production. Such problems related to the management can be at some degree solved by introducing an automation facility. Since the unique environment of a construction site in the past was not structured, it is very hard to introduce a facility to automate construction work from operation of the equipment to assignment of where to work. This is a preliminary research for automation of construction work. In this study, the trend of development of a cutting-edge technology, RTLS, was researched and analyzed in order to review the possibility of utilizing RTLS in construction work and present a control mechanism for construction equipment. Although the presented mechanism is at the concept stage, which still has lots of restrictions to be solved, the application of the RTLS will be very much feasible. That is, if linkage of the study between the RTLS and the automation of construction is built, it will be expected to contribute to many fields such as cost reduction through efficient and systemic management, the reduction of construction period and precise construction as well as raising the level of the automation of domestic construction work.

  • PDF

Preliminary Investigation for Apply of e-Government Framework at the Construction CALS System (건설CALS시스템에 전자정부 표준프레임워크 적용을 위한 사전 고찰)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.433-440
    • /
    • 2013
  • The Ministry of Land, Infrastructure and Transport was developed the Construction CALS system for improvement of the construction economy. Construction CALS system is consist by Construction Portal System, Construction Management System, Construction Authorization and Permission System, Compensation Management System, Facility Maintenance Management System and has utilized at construction site of more than 900. Ministry of Land, Infrastructure and Transport and related researcher was proposed method of various function improvements for usability of the system. However, the proposed method was expanded the problems like increase of system management cost and development cost with decrease of data process rate. The problem was increases because has added of only service function without modify of software structure to the system on each different platform base. One of the methods for solving problems is to apply the e-Government framework and then integrated the different platform. The purpose of this paper is analyse of the applicability and efficiency of e-Government framework to the construction CALS system. For that was analyzed the e-Government standard framework and the developments case. And then was verified about the adaption possibility and efficiency by use the Function Point tool.

The Section Optimization of Prestressed Concrete Box Girder Bridges (프리스트레스트 콘크리트 박스 거더 교량의 단면최적화)

  • 노금래;김만철;박선규;이인원
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.718-723
    • /
    • 1998
  • The program which could determine cross-sectional dimension of the prestressed concrete box girder bridges at the stage of preliminary design was developed using the optimal technique in this study. It could minimize the cost required in the design of box girder bridges and the construction with the full staging method. Objective cost function consisted of six independent variables such as height of cross-section, jacking force and thickness of web and bottom flange. The SUMT(Sequntial Unconstrained minimization Technique) was used to solve the constrained nonlinear minimization optimal problem. Using the program developed in this study, optimum design was performed for existing bridges with one cell cross section of constant depth. The result verify the compatibility of the program.

  • PDF

A STUDY ON THE LIFE-CYCLE FOR SELECTING A GRATING

  • Yun-Sik Kim;Dong-Wan Kang;Taehoon Hong;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1189-1194
    • /
    • 2009
  • A gutter-shaped U grating is a facility that is installed at the sides of a road to provide pedestrians with a rainwater-free road. The previous studies on this facility focused mainly on the progress of the efforts that are being made to improve its performance and interception efficiency so as to prevent damages in regional areas due to the heavy rains caused by climate change. The studies on its maintenance, however, are still inadequate. Therefore, this study was conducted to analyze and compare the life cycle costs and performance evaluations of the steel and magic gratings, which are installed in apartments. The results of the study show that the replacement period and rate of gratings differ depending on where they are installed. The initial capital investment cost of a magic grating installed at a road where many vehicles pass is quite high, but in terms of its maintenance and entire-life-cycle costs, its total expenses are lower than those of a steel grating. The results of this study are expected to serve as preliminary data for the selection of an adequate grating that is suitable for particular places in the design phase of construction projects.

  • PDF

Spatial interpolation of geotechnical data: A case study for Multan City, Pakistan

  • Aziz, Mubashir;Khan, Tanveer A.;Ahmed, Tauqir
    • Geomechanics and Engineering
    • /
    • v.13 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Geotechnical data contributes substantially to the cost of engineering projects due to increasing cost of site investigations. Existing information in the form of soil maps can save considerable time and expenses while deciding the scope and extent of site exploration for a proposed project site. This paper presents spatial interpolation of data obtained from soil investigation reports of different construction sites and development of soil maps for geotechnical characterization of Multan area using ArcGIS. The subsurface conditions of the study area have been examined in terms of soil type and standard penetration resistance. The Inverse Distance Weighting method in the Spatial Analyst extension of ArcMap10 has been employed to develop zonation maps at different depths of the study area. Each depth level has been interpolated as a surface to create zonation maps for soil type and standard penetration resistance. Correlations have been presented based on linear regression of standard penetration resistance values with depth for quick estimation of strength and stiffness of soil during preliminary planning and design stage of a proposed project in the study area. Such information helps engineers to use data derived from nearby sites or sites of similar subsoils subjected to similar geological process to build a preliminary ground model for a new site. Moreover, reliable information on geometry and engineering properties of underground layers would make projects safer and economical.

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Design criteria and Case History of Korean Railway for Auger-drilled Pilling (철도분야 매입말뚝 설계기준 및 적용 현황)

  • Lee, Su-Hyung;Choi, Jeong-Hwan;Hwang, Seon-Keun;Eum, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.541-548
    • /
    • 2008
  • Active application of auger-drilled piling is expected in Korea considering its advantage in noise and vibration problems against driven piling and its cost-effectiveness in comparison to the cast in-situ piling. The current design practice being used in Korea is adopted from the Japanese one, however the equipment and construction procedure is modified for the geotechnical conditions and construction circumstances in Korea. Therefore there is an urgent need for the establishment of the rational design criteria for the auger-drilled piling in Korea. As the preliminary work for the establishment, this paper presents the current practice in Korean railway constructions. Design criteria of Korea Railway Network Authority are introduced and its characteristics and the problems are described. Application cases of auger-drilled pile to railway construction are introduced as well.

  • PDF

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF