• 제목/요약/키워드: PrecisePLAN

Search Result 172, Processing Time 0.019 seconds

Ballasting plan optimization for operation of a 2D floating dry dock

  • Yoon, Kyungho;Kim, Hyo-Jin;Yeo, Seungkyun;Hong, Younghwa;Cha, Jihye;Chung, Hyun
    • Structural Engineering and Mechanics
    • /
    • v.74 no.4
    • /
    • pp.521-532
    • /
    • 2020
  • A floating dry dock is an advanced structure that can provide a solution for dry dock space shortages. The critical point in floating dock operation is compensating the deflection caused by a heavy payload by adjusting the water level in the ballast system. An appropriate ballasting plan warrants safe and precise construction on a floating dock. Particularly, in the case of a 2D floating dock, ballasting plan evaluation is crucial due to complex deformation modes. In this paper, we developed a method to calculate the optimal ballasting plan for accurate and precise construction on a 2D floating dock. The finite element method was used for considering the flexibility of the floating dock as well as the construction blocks. Through a gradient-based optimization algorithm, the optimal ballasting plan for the given load condition was calculated in semi-real time (5 min). The present method was successfully used for the actual construction of an offshore structure on the 2D floating dock.

Consideration of Surveying the Site for Lighthouse in Harbor Plan (항만계획에 있어서 등대부지측량의 고찰)

  • 장용구;이중우;강인준;이호
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.225-233
    • /
    • 1999
  • Harbor design and construction plan in Korea becomes the most hot issue both in the Maritime Affairs and Fisheries Office and in the related port industries. Production of the plane and cross section maps together with the profile map for harbor project is done firstly and is important in all procedure because it is the most basic datum in counting the constructional expense for determination of the area and capacity. As the expense assigned on surveying part among the total expenses of harbor planning and construction in Korea is very small, it is difficult to make exact maps. Moveover, because the method used to make such maps is mostly traditional surveying such as plane table surveying , offset surveying, stadia surveying and level surveying, etc, it is difficult to get precise three dimensional maps. Therefore, for making more precise map in the harbor project, we have to use the newest surveying equipment. This study discusses the method of old surveying and recent surveying used for the three dimensional map of the site for lighthouse which gives navigational aids for the in-and out-bound ships. The authors are proposing a method for more precise three dimensional positioning in this study.

A NUETROSOPHIC SINGLE ACCEPTANCE SAMPLING PLAN WITH QUALITY PARAMETERS

  • S. JAYALAKSHMI;M. GOPINATH
    • Journal of applied mathematics & informatics
    • /
    • v.42 no.1
    • /
    • pp.179-187
    • /
    • 2024
  • In the Quality Control and inspection processes, the use of attribute sampling strategies is crucial. In this study, we incorporate the neutrosophic fuzzy acceptance sampling plan method to present a fresh approach to attribute sampling plans. Utilizing the benefits of neutrosophic fuzzy sets, the proposed sampling plan method models and assesses the acceptance standards for attribute sampling. We compare the suggested method to already-in-use attribute sampling techniques plans with new attribute six sigma sampling techniques plan is proposed in order to verified its efficacy. The outcomes show the neutrosophic fuzzy acceptance sampling plan's superiority in terms of its capacity to manage uncertainties, account for ambiguity, and produce more precise quality evaluation outputs.

Reliability estimation about quality assurance method of radiotherapy planning (방사선치료계획 정도관리 방법에 따른 신뢰도 평가)

  • Kim, Jeong-Ho;Kim, Gha-Jung;Yoo, Se-Jong;Kim, Ki-Jin
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.119-124
    • /
    • 2015
  • According as radiation therapy technique develops, standardization of radiation therapy has been complicated by the plan QA(Quality Assurance). However, plan QA tools are two type, OADT (opposite accumulation dose tool) and 3DADT (3 dimensional accumulation dose tool). OADT is not applied to evaluation of beam path. Therefore tolerance error of beam path will establish measurement value at OADT. Plan is six beam path, five irradiation field at each beam path. And beam path error is 0 degree, 0.2 degree, 0.4 degree, 0.6 degree, 0.6 degree, 0.8 degree. Plan QA accomplishes at OADT, 3DADT. The more path error increases, the more plan QA error increases. Tolerance error of OADT path is 0.357 using tolerance error of conventional plan QA. Henceforth plan QA using OADT will include beam path error. In addition, It will increase reliability through precise and various plan technique.

A Study on the Changes of Space Program in Korean General Hospital (국내 종합병원 스페이스 프로그램 변화에 관한 연구)

  • Cho, Jun-Young;Chae, Jong-Hyoung;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.4
    • /
    • pp.3-10
    • /
    • 2008
  • Space program is not only meaning of area distribution on the planning of hospital architecture. The environment of health care such as medical examination, the level of service and construction on hospital. And also space program implies the composition of space and plan of size in which are activity, required manpower and rooms, and mutual relation between spaces in hospital by quantitative analysis of the requered rooms and unit area. Accordingly space program is the data at the beginning of plan which can understand the pursuing direction of hospital at the beginning of plan. This study analyze how to express the role and function of hospital in space program by research of it in korean general hospital. Through those research, the purpose of this study is to sight the position of present hospital and produce the basic data for precise space program.

  • PDF

The Economic Design of Two-Stage Sampling Plan for Attributes (비용을 고려한 계수치 2단계 샘플링 방법의 경제적 설계)

  • Lee, Gyeong-Jong;Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.1
    • /
    • pp.35-43
    • /
    • 1993
  • The principal objective of a sampling plan is to make efficient use of the budget allocated and to obtain as precise an estimate of a population parameter as possible. In order to estimate the proportion of defectives produced or to determine some measure of product Quality, it is necessary to select random samples which represent a population parameter of the process. In this case, the two stage sampling is more efficient and convenient than simple random sampling. Therefore this paper aims to propose the design procedures of two stage sampling plan to obtain a representative samples in considering the sampling precision under the restricted sampling unspection cost.

  • PDF

A Strategy of Technology Development for the Railway System based on Railway Network (철도망 구축을 고려한 철도시스템의 기술개발전략)

  • Lee Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

A Study on the Natural Park Plan through Ecological Conservation Value Evaluation -A Case Study on Mt. Hwangmaesan(Mt.) County Park - (생태적 보전가치 평가를 통한 자연공원 계획에 관한 연구 - 황매산 군립공원을 중심으로 -)

  • Shin, Ji-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.5
    • /
    • pp.28-37
    • /
    • 2010
  • This study is intend to evaluate natural conservation value, and to suggest natural park plan based on conservation value evaluation. In this study evaluation items are selected through related studies about ecological conservation evaluation, and evaluation items in this study can be classified into 2 aspects, ecological environment and topographic environment. After each evaluation items are overlaid with GIS program, management levels are derived from comprehensive overlaid maps of each evaluation items. Management areas can be classified into 5 levels; Critical Conservation Area, Conservation Area, Restoration Area, Passive Usable Area, Active Development Area and Settlement Area. So management areas can be matched each management levels to land use of natural park, that is district of preservation, district of natural environment, district of settlements and district of mass facilities. This study have good enough to evaluate ecological value for natural park plan, but, it is difficult to evaluate conservation value only with maps of each evaluation items, so it needs supplementary field survey for precise conservation value evaluation.