• Title/Summary/Keyword: Precast concrete deck

Search Result 92, Processing Time 0.028 seconds

Crack width control of precast deck loop joints for continuous steel-concrete composite girder bridges

  • Shim, Changsu;Lee, Chidong
    • Advances in concrete construction
    • /
    • v.10 no.1
    • /
    • pp.21-34
    • /
    • 2020
  • Precast deck joints have larger crack width than cast-in-place concrete decks. The initial crack typically occurs at the maximum moment but cracks on precast joints are significant and lead to failure of the deck. The present crack equation is applied to cast-in-place decks, and requires correction to calculate the crack width of precast deck joints. This research aims to study the crack width correction equation of precast decks by performing static tests using high strength and normal strength concrete. Based on experimental results, the bending strength of the structural connections of the current precast deck is satisfied. However it is not suitable to calculate and control the crack width of precast loop connections using the current design equation. A crack width calculation equation is proposed for crack control of precast deck loop joints. Also included in this paper are recommendations to improve the crack control of loop connections.

Evaluation of long term behavior of steel plate girder bridges with precast concrete decks (프리캐스트 바닥판을 사용한 강합성거더교의 장기기동 해석)

  • Kim, Su-Hyun;Lee, Jong-Min;Cho, Sun-Kyu;Go, Dong-Choon
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1326-1331
    • /
    • 2006
  • The precast concrete deck is one of suitable solutions for replacement and new construction in urban area. However, the precast concrete deck could be a weak point of the steel plate girder bridges structurally due to the connections between precast panels in the longitudinal direction. Thereafter, it is necessary for improvement of durability and load carrying capacity to introduce the prestress force in the longitudinal direction Some cracks of connections at the precast concrete deck may be occurred due to live loads, the difference of temperature and long-term effects. The shrinkage and creep of concrete may significantly affect long-term behaviors which occur tensile stresses at the precast concrete deck of steel plate girder bridges. In this study, the time-dependant analysis program has been developed to determine the initial prestress force in the longitudinal direction considering loss of stress at the precast concrete deck. Also it has been estimated the initial prestress force by construction stages and shapes of girder.

  • PDF

Experimental and numerical study on shear studs connecting steel girder and precast concrete deck

  • Xia, Ye;Chen, Limu;Ma, Haiying;Su, Dan
    • Structural Engineering and Mechanics
    • /
    • v.71 no.4
    • /
    • pp.433-444
    • /
    • 2019
  • Shear studs are often used to connect steel girders and concrete deck to form a composite bridge system. The application of precast concrete deck to steel-concrete composite bridges can improve the strength of decks and reduce the shrinkage and creep effect on the long-term behavior of structures. How to ensure the connection between steel girders and concrete deck directly influences the composite behavior between steel girder and precast concrete deck as well as the behavior of the structure system. Compared with traditional multi-I girder systems, a twin-I girder composite bridge system is more simplified but may lead to additional requirements on the shear studs connecting steel girders and decks due to the larger girder spacing. Up to date, only very limited quantity of researches has been conducted regarding the behavior of shear studs on twin-I girder bridge systems. One convenient way for steel composite bridge system is to cast concrete deck in place with shear studs uniformly-distributed along the span direction. For steel composite bridge system using precast concrete deck, voids are included in the precast concrete deck segments, and they are casted with cast-in-place concrete after the concrete segments are erected. In this paper, several sets of push-out tests are conducted, which are used to investigate the heavier of shear studs within the voids in the precast concrete deck. The test data are analyzed and compared with those from finite element models. A simplified shear stud model is proposed using a beam element instead of solid elements. It is used in the finite element model analyses of the twin-I girder composite bridge system to relieve the computational efforts of the shear studs. Additionally, a parametric study is developed to find the effects of void size, void spacing, and shear stud diameter and spacing. Finally, the recommendations are given for the design of precast deck using void for twin I-girder bridge systems.

Precast deck joints using a new straight lap splice continuous method

  • Woo-Young Go;Han-Joo Lee;Young-Jin Kim;Myoung-Sung Choi
    • Advances in concrete construction
    • /
    • v.17 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Precast deck joints have problems due to the occurrence of additional processes at construction sites, the complexity of construction, and the lack of design and construction standards for precast deck joints. To solve these, this study proposes a new precast deck joint that uses an Ultra-High-Performance Fiber-reinforced Cement Composite (UHPFRCC) filling material containing steel fibers and a straight rebar joint. In addition, the structural performance of the proposed joint, based on various parameters, was compared to that of existing precast deck joints, and the proposed joint showed equivalent strength and ductility. Therefore, the proposed joint can solve construction site problems by replacing the existing ones. The influence of various variables is expected to provide basic data on the design and construction guidelines for the precast deck joints.

Evaluation on Structural Performance of Joint with Asymmetric Ribbed Connection Details used in Precast Bridge Deck (비대칭 격벽단면을 갖는 프리캐스트 바닥판 이음부의 구조성능 평가)

  • Chung, Chul-Hun;Byun, Tae-Kwan;Kim, In-Gyu;Shin, Dong-Ho;Lee, Han-Joo
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.2
    • /
    • pp.159-167
    • /
    • 2017
  • A precast concrete deck system is considered an effective alternative in terms of its rapid construction and quality assurance than cast-in-place concrete deck. In precast concrete deck system, structural performance and serviceability are mostly determined by the connection methods between the precast decks. This research proposes more improved precast deck system with asymmetric ribbed connection details improving the disadvantage of previous precast deck system such as difficulties in assembling precast decks. And in this precast deck system, a separate form is not required at the site because partition wall of the precast decks serves as a form when placing non-shrinkage mortar in the connection part of the precast decks. Therefore, rapid construction is possible. Flexural performance is verified through load tests considering main parameter such as rib length in the precast deck connection. From the test results, it can be inferred that the development of the rebar and prevention of adhesion failure in the partition wall of the precast deck system are important factors in securing the flexural performance. Although the structural performance of the precast deck system with asymmetric connection details is gradually reduced as the rib length in the precast deck connection increases, the proposed precast deck system shows sufficient flexural performance and can be applied to the connection part of precast decks effectively.

Fatigue Performance of Precast FRP-Concrete Composite Deck with Long Span (장지간 프리캐스트 FRP-콘크리트 합성 바닥판의 피로 성능)

  • Cho, Keun-Hee;Park, Sung-Yong;Kim, Sung-Tae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.45-46
    • /
    • 2010
  • Fatigue performance of a precast FRP-concrete composite deck with long span economically applicable to a cable-stayed bridge was evaluated. From the experiment, it is verified that the precast FRP-concrete composite deck has sufficient fatigue performance.

  • PDF

Crack control of precast deck loop joint using high strength concrete

  • Shim, Changsu;Lee, Chi dong;Ji, Sung-woong
    • Advances in concrete construction
    • /
    • v.6 no.5
    • /
    • pp.527-543
    • /
    • 2018
  • Crack control of precast members is crucial for durability. However, there is no clear provision to check the crack width of precast joints. This study presents an experimental investigation of loop joint details for use in a precast bridge deck system. High strength concrete of 130 MPa was chosen for durability and closer joint spacing. Static tests were conducted to investigate the cracking and ultimate behavior of test specimens. The experimental results indicate that current design codes provide reasonable estimation of the flexural strength and cracking load of precast elements with loop joint of high strength concrete. However, the crack width control of the loop joints with high strength concrete by the current design practices was not appropriate. Some recommendations to improve crack control of the loop joint were derived.

shear Tests on female-to-female Type Joint between Precast Concrete Bridge Decks (프리캐스트 콘크리트 교량바닥판 female-female이음부의 전단실험)

  • 김영진;김영진;김종희
    • Magazine of the Korea Concrete Institute
    • /
    • v.10 no.6
    • /
    • pp.161-168
    • /
    • 1998
  • Increase of traffic volume in recent years results in deterioration of the bridge slab, which is directly subjected ot vehicle loads. Where extensive repair is necessary, replacement or enhancement of load carrying capacity using full depth precast concrete deck is often the most practical solution. Precast deck system has transverse joints between adjacent precast decks. Vertical shear forces occur when a vehicle wheel load is carried by precast decks and the joints are used to transfer the load to an adjacent deck. Effective load transfer between precast decks is critical for integral behavior. Finite element analysis and tests were run on the proposed femal-to-female type joint. 18 joint specimens were tested to investigate the effects of angle. D/H, and confining stress under static load. Results indicate joint with angle of 60$^{\circ}$ and D/H of 1/4 shows the improved load carrying capacity on crack. It is effective in protecting the cracking of joints to keep the joint in compression using confining stress.

Development of Precast deck Joint System (새로운 형식의 Precast 바닥판 연결방법 개발)

  • 주봉철;김영진;김병석;류형근;김덕진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.469-474
    • /
    • 2003
  • Recently, to overcome the disadvantages of RC decks, advanced countries such as Japan and USA, and Europe are using prestressing connection precast decks and loop connection precast decks. The prestressing connection precast deck, however, has a weakness against steel corrosion, because of unreliable enforced grouting. The relatively low loading and fatigue capacities of the loop connection precast deck make it difficult to be used for the bridge that requires high fatigue resistance due to the frequent over loaded vehicles. This research proposes the improved connecting method for the precast decks to minimize its shortcomings based on both numerical analyses and full scale model tests. The proposed method maximizes the advantages of precast decks and extends it's service life.

  • PDF

Design and Construction of Twin Steel Girder Bridge using the Precast Concrete Full depth deck (프리캐스트 바닥판을 적용한 소수거더교의 설계 및 시공)

  • Kim, In-Gyu;Ma, Hyang-Wook;Oh, Hyun-Chul;Kim, Young-Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.137-140
    • /
    • 2008
  • Minimizing the girder number and appling the long span deck of plate girder bridge is the main factors in the practical and economic design of the Twin Steel Girder Bridge. Therefore, it is important to verify the ability of the long span concrete deck. In this paper, to improve the problem, the precast concrete full depth deck has been used instead of cast-in-place concrete deck. The precast concrete full depth deck having longitudinal and transverse prestress is efficient to design of the long span concrete slabs. This paper introduces the design concept of Twin Steel Bridge using the precast concrete full depth deck and applied design case.

  • PDF